CTA Status and Plans Juan Abel Barrio 4 th MultiDark Workshop, Contacts with Industry IFT, Madrid. April 2011.

Slides:



Advertisements
Similar presentations
May 2009KM3NeT1 What is KM3NeT ? Future cubic-kilometre scale neutrino telescope in the Mediterranean Sea Exceeds Northern- hemisphere telescopes by factor.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Year 6 mental test 10 second questions
Developing Event Reconstruction for CTA R D Parsons (Univ. of Leeds) J Hinton (Univ. of Leicester)
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
G.Barbiellini -- 1 AGILE 1yr G. Barbiellini on behalf of the AGILE team.
Aldo Morselli, INFN, Sezione di Roma 2 & Università di Roma Tor Vergata, 1 Aldo Morselli Andrea Lionetto Vladimir Zdravkovic.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
PP Test Review Sections 6-1 to 6-6
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
1 st MultiDark Workshop UCM-GAE in MultiDark: Indirect searches for DM with the MAGIC Telescopes Juan Abel Barrio Universidad Complutense de Madrid, January.
A 1 Defining urban areas, some case studies in Finland Nordic Forum for Geostatistics Sinikka Laurila Statistics Finland
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
25 seconds left…...
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
C TA An advanced facility for ground-based high-energy gamma ray astronomy Why ? CTA.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
3 rd DPHEP Workshop CERN, 7-8 December 2009 G. LAMANNA CTA C herenkov Telescope Array Giovanni Lamanna LAPP - Laboratoire d'Annecy-le-Vieux de Physique.
Status of KM3NeT (Detector Design Optimisations) Christopher Naumann, CEA Saclay – IRFU / SPP for the KM3NeT consortium 44 th Reconcontres de Moriond,
Atmospheric shower simulation studies with CORSIKA Physics Department Atreidis George ARISTOTLE UNIVERSITY OF THESSALONIKI.
Argonne / U. Chicago Initiative on R & D for Next Generation Ground Based Gamma-ray Particle Astrophysics/Astronomy Karen Byrum Jun 7, 2010 Argonne National.
Development of Ideas in Ground-based Gamma-ray Astronomy, Status of Field and Scientific Expectations from HESS, VERITAS, MAGIC and CANGAROO Trevor C.
MA4: HIGH-ENERGY ASTROPHYSICS Critical situation of manpower : 1 person! Only «free research» based in OAT. Big collaborations based elsewhere (Fermi,
C TA An advanced facility for ground-based high-energy gamma ray astronomy  Exploring the non-thermal universe  the C herenkov T elescope A rray as a.
HAWC Science  Survey of 2  sr (half the sky) up to 100 TeV energies Probe knee in cosmic ray spectrum Identify sources of Galactic cosmic rays  Extended.
June 6, 2006 CALOR 2006 E. Hays University of Chicago / Argonne National Lab VERITAS Imaging Calorimetry at Very High Energies.
05/02/031 Next Generation Ground- based  -ray Telescopes Frank Krennrich April,
Sources emitting gamma-rays observed in the MAGIC field of view Jelena-Kristina Željeznjak , Zagreb.
C TA An advanced facility for ground-based high-energy gamma ray astronomy  Exploring the non-thermal universe  the C herenkov T elescope A rray as a.
The Large High Altitude Air Shower Observatory LHAASO.
The end of the electromagnetic spectrum
CTA-LST Large Size Telescope M. Teshima for the CTA Consortium Institute for Cosmic Ray Research, University of Tokyo Max-Planck-Institute for Physics.
Cherenkov Telescope Array
HAWC Science Survey of 2p sr up to 100 TeV energies Extended Sources
VERITAS: Very High Energy γ-ray Astronomy
SNRs as PeVatron candidates for CTA
CTA Why ?.
Presentation transcript:

CTA Status and Plans Juan Abel Barrio 4 th MultiDark Workshop, Contacts with Industry IFT, Madrid. April 2011

Juan Abel Barrio, GAE-UCM 2 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA: Cherenkov Telescope Array One observatory with two (asymmetric) sites for all-sky coverage operated by one consortium

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM Scientific Motivation Project status Plans for construction & operation CTA-Spain contribution Proposal: CTA-North at Spain

Juan Abel Barrio, GAE-UCM 4 4 th MultiDark Workshop, IFT Madrid, April 2011 Cosmic electromagnetic spectrum 1 eV eV = 1 TeV

Juan Abel Barrio, GAE-UCM 5 4 th MultiDark Workshop, IFT Madrid, April 2011 First VHE -ray source The Crab Nebula 1989, Whipple The VHE gamma-ray sky has open-up … Over 350 publications in prestigious journals 12 publications in Science and Nature

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM Project status

Juan Abel Barrio, GAE-UCM 7 4 th MultiDark Workshop, IFT Madrid, April 2011 Unifying European Efforts Worldwide

Juan Abel Barrio, GAE-UCM 8 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA Timeline Design Design Study Preparatory Phase Array Construction Design Concepts for CTA (arXiv: v1) Production-Ready Technical Design Report

Juan Abel Barrio, GAE-UCM 9 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA Layout Low-energy section: 4 x 23 m tel. (LST) - Parabolic reflector - FOV: 4-5 degrees - f/D: ~1.2 energy threshold of some 10 GeV Core-energy array: 23 x 12 m tel. (MST) Davies-Cotton reflector - FOV: 7-8 degrees - f/D: ~1.4 mCrab sensitivity in the 100 GeV–10 TeV domain High-energy section: 32 x 5-6 m tel. (SST) Davies-Cotton reflector (or Schwarzschild-Couder) - FOV: ~10 degrees - f/D: 1.2 – km 2 area at multi-TeV energies (one) possible configuration 100 M (2006 costs)

Juan Abel Barrio, GAE-UCM 10 4 th MultiDark Workshop, IFT Madrid, April 2011 Cherenkov telescopes EAS ~10 km ~ 1 o Cherenkov light ~ 120 m Effective area ~10 4 m 2 Background rejection Operation principle

Juan Abel Barrio, GAE-UCM 11 4 th MultiDark Workshop, IFT Madrid, April 2011 Cherenkov telescopes EAS ~10 km ~ 1 o Cherenkov light Effective area ~10 4 m 2 Background rejection ++ Enhanced reconstruction Operation principle Effective area ~10 4 m 2 Background rejection

Juan Abel Barrio, GAE-UCM 12 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA in numbers CTA Consortium: above 550 researchers from over 120 groups from about 80 Institutions from 22 countries (16 European) (Until May 2010) + USA, India, Brazil, Slovenia, Marseille -> over 700 people CTA Observatory sites: ­One in the South O(100 MEuros) -> Argentina, Namibia, South-Africa ­Another in the North O(50 MEuros) -> Spain, Mexico,… CTA Telescopes: O(100) altogether ­South Observatory: O(5) LST, O(30) MST, O(30) SST in ~3x3 Km 2 ­North Observatory: O(5) LST, O(30) MST in ~1x1 Km 2 CTA dates: ­CDR: May 2010 / TDR: End 2013 ­Construction start: / end:

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM Plans for construction and operation

Juan Abel Barrio, GAE-UCM 14 4 th MultiDark Workshop, IFT Madrid, April 2011 Medium &small-sized telescopes MST SST

Juan Abel Barrio, GAE-UCM 15 4 th MultiDark Workshop, IFT Madrid, April 2011 Large-sized telescopes LST

Juan Abel Barrio, GAE-UCM 16 4 th MultiDark Workshop, IFT Madrid, April 2011 Camera elements

Juan Abel Barrio, GAE-UCM 17 4 th MultiDark Workshop, IFT Madrid, April 2011 Mirrors Diamond-milled Aluminum sandwich (MAGIC-I) Foam glass replica Composites (carbon-fibre epoxy) Cold-slumped glass replica (MAGIC II) Glass mirrors (H.E.S.S.) Sizeable part of costs Challenges ­ m 2 ­ Produce them in time ! ­ Replica techniques to be proven:

Juan Abel Barrio, GAE-UCM 18 4 th MultiDark Workshop, IFT Madrid, April 2011 Active Mirror Control

Juan Abel Barrio, GAE-UCM 19 4 th MultiDark Workshop, IFT Madrid, April 2011 Operation and control

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM CTA Spain structure and contribution

Juan Abel Barrio, GAE-UCM 21 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA-Spain Consortium in numbers 8 groups (so far) from different fields: Madrid, Barcelona, IAC Personnel: 70 researchers and 50 EDPs (about 10% of the whole CTA, 12,5% EDPs). 5 Ramón y Cajal Fellows Cooperation with enterprises: GTD, INSA, etc. Funding so far (up 2013): 3.2 M 8 groups (so far) from different fields: Madrid, Barcelona, IAC Personnel: 70 researchers and 50 EDPs (about 10% of the whole CTA, 12,5% EDPs). 5 Ramón y Cajal Fellows Cooperation with enterprises: GTD, INSA, etc. Funding so far (up 2013): 3.2 M

Juan Abel Barrio, GAE-UCM 22 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA-Spain Contributions Large Size Telescope Low energy threshold physics (very demanding) ­ Advanced front-end and analog-to-digital electronics ­ Advanced trigger development ­ Advanced photosensors ­ Telescope structure Atmospheric characterization Reduce systematic uncertainties ­ New atmospheric monitoring instrumentation ­ New calibration instrumentation SITE characterization Data Model and Reduction

Juan Abel Barrio, GAE-UCM 23 4 th MultiDark Workshop, IFT Madrid, April 2011 Camera design and prototyping Electronics Readout PreAmp (UB) Digitizing (French & italian groups) Trigger L0 (IFAE)L1 - Decision (UCM-GAE) L1- Distrib. (CIEMAT) Cluster Camera Photosensors (CIEMAT) (UB) (UCM-GAE) (UCM-ELEC) (IFAE) Mechanics (CIEMAT) Timing (UCM-ELEC) Mechanics (IFAE, CIEMAT, UCM-ELEC) Quality control (UCM-ELEC) Slow control (IFAE) New camera concepts (IFAE, CIEMAT, UB, UCM-GAE, UCM-ELEC)

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM Proposal for CTA-North at Spain

Juan Abel Barrio, GAE-UCM 25 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA-North at Spain CTA-North features ­ Scientific aim: extragalactic physics, pulsars and dark matter ­Low threshold: ~5 LST, ~30 MST area ~1x1 km 2 Lower cost (~80 M) than CTA-South Probable proposed sites: Arizona (US), Sierra Negra (México), India ? CTA-North at Spain ­Positive experience with HEGRA and MAGIC ­ Great benefits for Spanish scientific community and industry ­ Proposed site: Izaña Observatory (IAC), Tenerife

Juan Abel Barrio, GAE-UCM 26 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA-North at Spain

Juan Abel Barrio, GAE-UCM 27 4 th MultiDark Workshop, IFT Madrid, April 2011 Conclusions Improve sensitivity (factor ~10) and energy coverage (20 GeV-100 TeV) Merge efforts by different experimental groups (HESS, MAGIC, VERITAS) and the astrophysics community. Currently ~1000 people. World wide effort: CTA = Cherenkov Telescope Array. Entering now in the Preparatory Phase within FP7 Prototyping Challenging instruments Opportunities for industry Proposal for CTA-North in Spain Opportunities for Spanish industry

Juan Abel Barrio, GAE-UCM 28 4 th MultiDark Workshop, IFT Madrid, April 2011 Conclusions (Not to scale)

4 th MultiDark Workshop, IFT Madrid, April 2011 Juan Abel Barrio, GAE-UCM Backup

Juan Abel Barrio, GAE-UCM 30 4 th MultiDark Workshop, IFT Madrid, April 2011 TeV Astronomy: Highlights Over 350 publications in prestigious journals: Microquasars: Science 309, 746 (2005), Science 312, 1771 (2006) Pulsars: Science 322, 1221 (2008) Supernova remnants: Nature 432, 75 (2004) The Galactic Centre: Nature 439, 695 (2006) Galactic Survey: Science 307, 1839 (2005) Starbursts: Nature 462, 770 (2009), Science 326,1080 (2009) AGN: Science 314,1424 (2006), Science 325, 444 (2009) EBL: Nature 440, 1018 (2006), Science 320, 752 (2008) Dark Matter: Phys Rev Letters 96, (2006) Lorentz Invariance: Phys Rev Letters 101, (2008) Cosmic Ray Electrons: Phys Rev Letters (2009)

Juan Abel Barrio, GAE-UCM 31 4 th MultiDark Workshop, IFT Madrid, April Crab 10% Crab 1% Crab Fermi MAGIC-I H.E.S.S. E. F(>E) [TeV/cm 2 s] E (GeV) High-z AGNs, pulsars, Dark Matter Population studies, extended sources, precision measurements Exploring the cutoff regime of cosmic accelerators CTA wish list CTA

Juan Abel Barrio, GAE-UCM 32 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA listed as priority in international roadmaps of: ­ASTRONET (European Astrophysics Coordination) ­ASPERA (European Astroparticles Coordination) ApPEC Targeted DS Common Call -> Up to 2.7M ­ESFRI (European Strategic Forum for Research Infrastructures) EU FP7 Preparatory Phase approved -> Up to 5.2M ­Astroparticle WG of GSF (OECD) CTA worldwide project ­USA PASAG and Decadal Review At the Spanish level: ­Project included in the MICINN roadmap as High Priority ­RIA (Red de Infraestructuras de Astronomia) CTA group CTA reviewed at many levels

33 The Preparatory Phase Preparing for CTA Organisation (Governance, Finance, Legal…) Construction (Finalise Design/Implementation plans, Site selection/development) Operation (Observatory, Data, …) Technical work Science-based optimisation of the observatory, detailed design work, down-selection of the many hardware options Monte-Carlo simulations, data analysis development, physics/astrophysics studies, mechanical and electronic engineering

Juan Abel Barrio, GAE-UCM 34 4 th MultiDark Workshop, IFT Madrid, April 2011 CTA Data flow storage Pre-reduct. Lev0 --> Lev1a-->Lev1b Reduction Calibration Lev1b --> Lev2a MC cuts Phot. List (Lev 2b) Calib. Files Data Retrieval Interface High Level Data Interface MWL-IA Observatory Scien. Products (skymap, spec., LC) 12 3

Vertical WPs Large-size telescope system int. LST focal plane instrumentation LST structure and mirror Medium - size telescope system int. MST focal plane instrumentation MST structure and mirror Small-size telescope system int. SST focal plane instrumentation SST structure and mirror Horizontal WPs Instrument simulation Telescope structures and drive systems Mirror facets, mirror alignment Instrument control and data acquisition … Technical project coordination Supported by CTA-PP

The Spanish Coordinated Project for CTA Areas of interest: Physics ( ALL ) Atmosphere and calibration ( IFAE, UAB ) Trigger and electronics ( ICC-UB, IFAE, UCM-GAE, UCM-ELEC ) * Monte Carlo (design) ( IFAE, CIEMAT ) * Mechanics (CIEMAT, IFAE) * - Data ( ICE-IEEC, UCM-GAE, ICC-UB ) Quality Control ( UCM-ELEC ) Site & Outreach ( IAC, IFAE, UCM-GAE) -

Juan Abel Barrio, GAE-UCM 37 4 th MultiDark Workshop, IFT Madrid, April 2011

Juan Abel Barrio, GAE-UCM 38 4 th MultiDark Workshop, IFT Madrid, April 2011 Posibles sitios en España 3 Obs. Izaña, Tenerife: Ventajas: sitio astronómico consolidado, infraestructura astronómica ya existente, bien caracterizado, cercanía a sede del IAC en La Laguna. Desventajas: ?? Falta una cierta caracterización de los sitios concretos 1 & 2.

Juan Abel Barrio, GAE-UCM 39 4 th MultiDark Workshop, IFT Madrid, April 2011 Sitio 1 Sitio 2 O. Izaña 1 km Sitio 1 probablemente limitado por orografía a <1 km 2.