PENN STATE STUDENT CHAPTER Design-Build Institute of America (DBIA)

Slides:



Advertisements
Similar presentations
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Advertisements

Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Kitchen Creek CREP & Stream Bank Stabilization Project Project Sponsors: Greenbrier Valley Conservation District West Virginia Conservation Agency U.S.D.A.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
An Introduction to Case Study 2: The Duck Mountain Forest Management Unit Climate Change and Forests: Making Adaptation a Reality Winnipeg, MB Nov 18 &
Youth Education Program Central Oregon Flyfisher MARCH 21, 2012.
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Medway Valley Heritage Forest Environmentally Significant Area Phase One - Conservation Master Plan Community Information Meeting July 25, :45 –
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
North-East Columbia Sub-Area Plan May 20 Informational Sharing and Gathering.
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
PARK UPGRADE PROPOSAL SYCAMORE AVENUE PARK, RIVERCLUB PRESENTED TO JOHANNESBURG CITY PARKS MANCO ON BEHALF OF THE RIVERCLUB RESIDENTS ASSOCIATION (VA)
Chicago Wilderness: An Ecosystem Management Plan Katy Berlin Shelly Charron Lisa DuRussel NRE 317 April 11, 2001.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
June 23, 2007 Alternatives Brainstorming Workshop Brisbane Baylands Specific Plan EIR.
Toolik Field Station Laboratory Design Objectives and Process Science Support Vision Workshop August 2012.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
MAFMC 5-Year Strategic Plan Public Comments August 14, 2013.
Town of Nags Head Update Aaron McCall, Northeast Regional Steward – January 6, 2010 © Insert Image Credit.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
GREEN EARTH ORGANIZATION- Biodiversity Conservation Activities Kwesi Anderson 11/05/2009.
//plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric.
This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be.
CONSERVATION COMMISSION TRAILS come in all shapes and sizes based on community need and vision.
West Division Patrol Station Proposed Site Plan & Building Elevations September 4, 2008 Police Services Board.
A Land Preservation Framework for the Cacapon Watershed of West Virginia Michael P. Strager Charles B. Yuill Natural Resource Analysis Center West Virginia.
Development of Lantau Island. Background of the development Lantau Island is the biggest island in Hong Kong Well recognized for its nature conservation.
Montana Forest Stewardship “Empowerment of Forest Owners through Personal Involvement”
Accomplish More Together Conservation Planning for Green Infrastructure: A Greenprint for Sustainability Michael S. Fishman, CWB, PWS Greg Liberman, CPESC.
Rocky I Bridge Installation Park Butte Trail June 2005.
U.S. Department of the Interior U.S. Geological Survey Leetown Science Center Research in the Shenandoah Valley Presented to the Shenandoah Valley Natural.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Fairfax Village Community Garden Plan. Summary  The 14,000 sq. ft. Fairfax Family Center area that had a Grand opening August 7 th, 2012 is ready to.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
WOODLAWN PUBLIC LIBRARY NEWS & UPDATES April 6, 2009.
Brushy Creek Community Center Hospitality and Recreation Marketing Research Hospitality and Recreation Marketing Research.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
City of Suwanee 2030 comprehensive plan. TODAY’S AGENDA Process Update Community Agenda Framework “Compass” Review  Images and Questions  Comp Plan.
Marine Life Protection Act Unresolved Feasibility Issues for the Regional Stakeholder Group Revised North Coast Marine Protected Area Proposal Presentation.
EcoDistricts. What are EcoDistricts? An EcoDistrict is a highly integrated district or neighborhood that is resource efficient; captures, manages and.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Honey Springs Sporting Dog Training Facility (A Joint Project by DFG South Coast Region and San Diego County Wildlife Federation) Presented by Robert R.
Parc des Chutes- de-la-Chaudière Mini Hydro Project: Enhancement Through Development Lessons from a success story by Jean–Pierre Fau and Guy Dufort.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
Biodiversity Notes watch?v=7tgNamjTRkk.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Hearst Recreation Center
Native and Wild Trout Conference April 21, 2016 Phoenix AZ
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
Habitat works delivered over last four years in partnership with local land owners, Wild Trout Trust, Grantham Angling Association Fly fishing Section,
Environmental Critical Areas Regulations
The Oakton Condominium Association September 12, 2017
2017 American Waters Resource
Presentation transcript:

PENN STATE STUDENT CHAPTER Design-Build Institute of America (DBIA)

2013 Volunteer Project Spring Creek Park – Pedestrian Bridge Outline: Project Summary Site Investigation Bridge Design Budget and Schedule Design Charette Overview Community Participation Results Additional Considerations Questions & Answers

Project Summary DBIA will provide volunteer services for the planning, design, and construction of a new Pedestrian bridge located in Spring Creek Regional Park. Owner Goals : Create an additional means to reach the south side of Spring Creek Park Attract new park goers to the area Provide handicap accessible access Revive the east area of the park around spring creek Keep the public informed of future project

Project Goals Design / Build Design a unique bridge that stands out and fits the owners needs: ADA Accessible Public transparency Provide an integrated approach to increase quality, schedule and cost controls on the project Maintain erosion and settlement control during construction Limit the size of equipment required for installation Allow for constructability concerns:

Site Investigation Project Site:

Site Investigation Proposed Locations:

Schematic Sketches Option AOption B

Budget and Schedule Budget: $25,000 Milestone Schedule: Bridge Construction – April 2013

Additional Considerations Future use of clearing on the South side of Spring Creek On-site storage of material and equipment Erosion and Settlement control plan during construction Relocation of small trees if needed Blackout dates for park use in April 2013 Budget and possible private donations with recognition Avoid interrupting the water flow during construction Design a bridge that does not require the use of large equipment

Design Charrette Overview Charette was held on September 20 th Goal Brainstorm value goals and initiate ideas for bridge development Overlapping ideas between students Sensitive Design Sustainable Gathering location Efficiency Accessibility Attractive Design

Community Participation Date Sept. 30 th from 12:00-12:45 PM Process Interview various visitors Gather comments on Spring Creek Park Experiences Evaluate opinions for the new bridge proposal Observe park activities

Community Participation-Results General park usage Park visited in all seasons Brown trout fishing in spring, summer, and fall Park access Variety of drivers and walkers Dog friendliness Old bridge used to have spaces between treads Paws could go through Preferred bridge location/design Same spot as old location An open bridge would be ideal, rather than another covered

Community Participation-Results Creek Preservation TROUT FLY-FISHING Considered Blue Ribbon, Class A trout stream Spring Creek is premier location SENSITIVE TO HABITAT Bridge should enhance ecology of creek NOT disturb free-flowing stream Preserve the trout and ecosystem D. RESOURCE ON BIODIVERSITY Dr. Greg Hoover, professor at Penn State NATURE SIGNAGE Existing sign next to covered bridge on brown trout Would like to see sign on the total ecology of Spring Creek On headwaters, and importance within ecosystem Prominent sign, not only on trout

Community Participation-Results List of useful resources: Trout Unlimited – Spring Creek Chapter Paradise Fishing Preserve ClearWater Conservancy – Spring Creek Biodiversity Dr. Greg Hoover PSU Professor focused on freshwater entomology and biodiversity Visit PA – Go fishin

Questions?