SETTING OUT OF THE DTF MODULES.

Slides:



Advertisements
Similar presentations
Basic Setting Out.
Advertisements

B.S.I. British Standards Institute. BSI Exam Question Describe the work of the BSI (British Standards Institute) and explain its importance to the consumer.
E-2020 Science Classes New Year 2012 Procedures. Vocabulary Write each vocabulary word Each definition, in your own words if possible Draw a picture to.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Gumball Machine Layout 7 th Grade Woods Project. What is The Technology Design Cycle?
Error Detection / Correction
TP4-ENERSOL-TD/PV double function
Absolute Value Inequality
Air Racer Design and Layout.
Term 2. New Notebook Organization We will begin this quarter to organize our notebooks according to page numbers. We will keep a table of contents and.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Microsoft Word 2003 Welcome Shawano Students to the Introduction to the Word Program.
Using commercial patterns Trimming, pinning, cutting out, transferring pattern markings. © PDST Home Economics.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Drawing in 3D Rectangular Coordinates z x y. The key to plotting points in rectangular coordinates is to each coordinate as a vector, in the x, y and.
Chemical storage This guide has been developed to help teachers store science chemicals properly. The MSDS is the authoritative source of information for.
Using This PowerPoint This PowerPoint presentation assumes you already have both the Java JDK and JCreator installed and all that you need is the proper.
1 You can create a report of points to stakeout with angle and distance from the occupied point. Points can be created for such items as end of embankment,
Topographic Profiling. The first step: -Strike a line across the feature that you would like to profile. -It is possible that this may already be done.
Learning and remembering.
How to choose a template/background for a brochure using Microsoft publisher Uses: to make the brochure more catching and interesting.
Periodic Motion Periodic Motion Oscillatory Motion Wave Motion.
Date of download: 7/7/2016 Copyright © ASME. All rights reserved. From: Effects of Cyclic Motion on Coronary Blood Flow J Biomech Eng. 2013;135(12):
MAP MAKING RULES Every map MUST have:. 1. Title  Every map must have a title  Title should be located at the top of the map in a central position 
CONSTRUCTION OF A DTF DO’s and DON’Ts.
THE DTF CONCEPT.
FBK buried channels Pressure test progress.
What did you say about my T-T-T project again???
Basic Factors you need to Consider Before Investing in Pallet Racking system.
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Decentralised Treatment Facility (DTF)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Rectangular Coordinates Level control in trenches
پروفیل طولی یا نیمرخ طولی (Longitudinal Profile)
Topographic Profiling
Topographic Profiling
WAIVER Entrance.
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
WORK, POWER AND ENERGY! (ACCORDING TO PHYSICS)
PRESENTATION LAYOUTS This is a title slide
♠ ♠ ♠ ♠ الاصوات والموسيقا مجلس أبوظبي للتعليم منطقة العين التعليمية
Name: _________________ Class: ________
Loops CIS 40 – Introduction to Programming in Python
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
9 x 14 9 x 12 Calculate the value of the following: 1 8 × 12 =
Dead Horse Bay ..
The Big Thirst Essay.
Waves.
Aim: How can we construct a topographic profile?
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
STORE MANAGER RESPONSIBILITIES.
Ecosystem Changes -Changes in ecosystems are usually predictable patterns of climate, seasonal reproductive cycles, population cycles, and migrations.
SOLIDS (3-D stuff) T BOLAN.

Enlargement on Paper Enlarge the Rectangle by a Factor of 2
Litter Pan Start at one corner and work in overlapping strokes
4th Qtr Journals.
Fractions Unit Test Review
Last year Mary was twice as old as John.
Will you.
One Step Algebra Equations
PERCENT UNIT 6 Math 7 Plus.
DBQ Formatting Create Google Doc Citations:
Structure for groups 1 member will present their speech for the rest of the group Each member will be watch for 1 thing ONLY - 1 person.
What is Energy?.
Warm Up Objective: Scientists will describe the brain by analyzing the dissection. What is the topic? What will you be doing? Why is this important?

Higher Biology Unit Metabolic rate.
Presentation transcript:

SETTING OUT OF THE DTF MODULES

LAYOUT PLAN

LONGITUDINAL PROFILE < 1% < 1% < 10% Δ 0.8m Δ 0.1m Δ 1m

LEVELS Module inlet Distances [m] Minimum level difference [m] < 1% < 10% Module inlet Distances [m] Minimum level difference [m] Inlet RBBT and Inlet Settler Inlet Settler and inlet ABR Inlet ABR and Inlet VFCW Inlet VFCW and Water body 5 1 20 450 0.8 + 0.05 = 0.85 1 + 0.1 = 1.1 1 + 0.2 = 1.2 4.5

PROCEDURE (in the case of Oloolaiser DTF) Mark the position of the first module RBBT with pegs (on the 4 corners), using the distances from the layout plan Mark the position of the Settler using the distances from the layout plan and double checking the expected level from the longitudinal profile Same way: mark the position of the ABR (distances double checked with levels) Same way mark the position of the VFCW (distances double checked with levels) Mark the position of the SDB, the Operator Store and the incinerator using the layout plan (levels not as important as with the rest of the modules) Remember: the BoQ has been done according to the initial setting out. Changing the setting out might lead to a variation in costs (excavation)