ESS MEBT Quadrupole magnets

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Magnets for the ESRF upgrade phase II
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Measurements and DB meeting 1 December, 2005, Elena Wildner AT/MAS 1 AC/GEO mole measurements Based on outcome from meeting 24/ and Installation.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Magnet Design & Construction for EMMA
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Magnetic field measurement of new "QM7R" (TOKIN 3581) 12/16/2008 Mika Masuzawa.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
BARC First Prototype PXIE Magnets Measurements at Fermilab 9/16/2014Michael Tartaglia, TD/T&I Dept.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Results of short module and qualification strategy
WP High Beta Cavities Delivery
Iranian Light Source Facility, IPM, P.O. Box , Tehran, Iran
Lessons learnt from CERN experience
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Procurement, Measurement and Installation of 2 Octupoles for ATF
HO Corrector Magnets: decapole test and future plans
Alexander Kalimov, State Polytechnic University, St.-Petersburg
JLAB MEETING FDR – April 23-24th 2013
(Procurement, testing of magnets)
Halbach Magnets: Design, Prototypes & Results
Renovation of the 45-year old PS magnets
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
HO Corrector Magnets: decapole test and future plans
Magnets for the ESRF upgrade phase II
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
MQXF updates P. Ferracin October 9th, 2014.
ELENA Magnet Installation Planning
Brief Status Report on Fabrication of ATF2 Quads
This Presentation Pack is brought to you by
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Status of the PANDA Solenoid Magnet Production in BINP
Undulator System Components Status Dean Walters
Elettra – Sincrotrone Trieste S.C.p.A.
LCLS Undulator System Status and Schedule
System tests at CEA O. Piquet 19/03/2019
Teleconference ACS – FREIA 19th June 2017
Undulator and Magnet Production Status 25 October 2006
Undulator Alignment Plan
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

ESS MEBT Quadrupole magnets J.L. Muñoz Bilbao, 27 March 2019

ESS MEBT Quads – Bilbao, 27 March 2019 Contents Quads requirements and specifications Tender/fabrication process review Design details Magnets characterization Box Incident Power supplies Some simulations Conclusions ESS MEBT Quads – Bilbao, 27 March 2019

MEBT line includes 11 quadrupole magnets, with integrated dipolar correctors All magnets share the same design and are identical, although operating gradients and F/D characteristics depend on position in line

Quadrupole magnets requirements Relevant documents in CHESS: MEBT Quadrupole magnet TDR Quad main drawing Quads DOORS L4 check Characterization of pre-series magnet

Tender and contract timeline 24Feb2016: PDR at Bilbao. Preliminar design presented Comments and improvements noted 19Sep2016: Tender process launched Based on PDR design + L4 + improvements 1+10, pre-series thorough characterization 13Feb2017: Contract awarded to Danfysik 25Apr2017: Kick-off meeting (admn. delays) 01Jun2017: PDR #1 (based on 3D model) 14Jun2017: PDR #2 (based on 3D model). PASSED.

Tender and contract timeline 01Ago2017: First set of documentation for FDR (drawings, assembly prodecures, cable sketches) 06Oct2017: Final set of documentaion for FDR 17Oct2017: FDR PASSED, with actions open 08Feb2018: First measurements of pre-series magnet Concerns on: Center-height of magnet (corrected) Mechanical-magnetic axis offset 16Apr2018: All measurements of pre-series magnet accepted, magnet sent to ESS-Bilbao premises. 02May2018: Pre-series magnet arrives at ESS-Bilbao (magnet 1/11)

Tender and contract timeline 11May2018: Local tests ran, report issued Visual inspection issues (labels, weldings) IP2X cover Magnet accepted with minor corrections for series 03Oct2018: Fabrication and tests for next set of 4 magnets, delivery after data package is accepted. 11Oct2018: Reception of 4 magnets (2-5/11) 08Nov2018: Incident with transport of remaining magnets. New assembly, tests and correction actions 14Dec2018: Final data package for incident magnets 21Dec2018: Magnets arrive to ESS-Bilbao (6-11/11)

Tender and contract timeline (Data package)

Design details

Design details Pole tip design

Design details Coils

Design details Coils

Design details Mechanical

Design details Mechanical (Industeel XC-06)

Design details Mechanical

Design details Mechanical

Characterization Documentation available for all magnets More than 600 files and 600 Mb of data

Pre-series magnet Tests done at Danfysik

Pre-series magnet Dimensional check

Pre-series magnet Thermo-switches tests (2 per coil) All coils tested: Dimensional control, resistance, insulation Before and after impregnation Pdf docs of all tests documents sent

Pre-series magnet After opening+assembly (3 times)

Pre-series magnet Complete magnet test document Visual inspection (paint, brazing, screws,photo) Dimensions Coil numbering Dissasembly/assembly test Resistance, insulation, hydraulic leak Full power test (250A+steerers 6.6A, during 1 hour)

Pre-series magnet Complete magnet test document

Pre-series magnet Target position and mech-mag offset doc

Pre-series magnet Target position and mech-mag offset doc “Resistance based” measurements: Offset is measured in the SW bench First, magnetic center is found Then wire is moved in X and Y steps until electric contact is detected This measures mechanical aperture Process is repeated for all poles, and overall offset computed

Pre-series magnet Excitation curve measured with Hall probe

Magnetic measurements Integrated gradient and hamonics Measured with SSW device, rotating a wire in a 19.5 mm radius circle, evaluating at 15.0 mm radius Higher order harmonics are measured for different quadrupolar and dipolar coils excitation Excel files of all measurements provided

Magnetic measurements Summary of results, extracted from raw data

Magnetic measurements Summary of harmonics measured at I=10A (L4<1 %)

Magnetic measurements Summary of harmonics at I=250A (L4 < 1%)

Additional tests Local tests: one of the magnets was measured in CFAA (UPV/EHU) facility (Model built with poles interpolated from metrology)

Box incident On 1/11/18 Danfysik reported an incident with the box containing the last batch of six magnets

Box incident The box contained magnets numbered 17034, 17035, 17036, 17040, 17043 and 17044. A comparison of measurements (pole gap and shoulder) after reassembly was done. Problems (values worse than previous ones) found in three magnets (17035, 17036 and 17044). In particular, magnet 17036 presented values which are outside the required tolerances according to magnet specification. Magnet stands were also slightly bent from the laterals. Danfysik pointed out that this could be corrected when bolting the stand to the magnet support, straightening the stand this way.

Box incident The strategy that was devised to cope with this was to: 1. Start with the operation of opening/closing of the magnet. 2. Repeat all complete measurements of the magnets. 3. Deliver an updated complete data package for each magnet. ESS (JS) was informed and participated in all Skype meetings between ESS-Bilbao and Danfysik

Box incident 17034 17035 17036 17040 17043 17044 Just after box incident Before opening After opening After 1st opening After 2nd opening time

Box incident Some correction was needed for magnet #17035. The foot was re-machined and this has corrected the mechanical problems. After receiving all mechanical and magnetic measurements, we have found that all magnets are within specifications and that there is no significant difference between magnets before and after the incident. Anyway, this delayed quite a bit the magnets delivery to Bilbao

Simulations Extensive simulations activities have also been done

Power Supplies

Conclusions 11 magnets were build and tested All magnets are within L4 requirements All mechanical restrictions (BPM, length, etc) are also met Fabrication has suffered several delays and incidents All the documentation has been collected and sent