Proposed ACI Modifications

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0758r1 Submission Sep 2005 Kobayashi, Trachewsky, Victor, Broadcom CorpSlide 1 Garden Grove 05: Proposed Adjacent Channel Interference.
Advertisements

Doc.: IEEE /xxxxr0 Submission March 2007 M. Kobayashi, Broadcom CorpSlide 1 Proposed ACI Modifications Notice: This document has been prepared.
Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
San Francisco: Proposed Adjacent Channel Interference Test Methodology
Motions Date: Authors: January 2006
IEEE White Space Radio Contribution Title
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Descriptive Language Usage in TGv
JTC1 Chair’s Closing Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
Quick Beacon Impacts on LB 92
November Opening Report
JTC1 Ad Hoc Mid-week Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE WG Opening Report – July 2008
ADS Study Group Mid-week Report
IEEE P Wireless RANs Date:
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
PHY CID 3242 Date: Authors: September 2007 September 2007
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
PHY CID 3242 Date: Authors: September 2007 September 2007
Draft P802.11s D1.03 WordConversion
January Opening Report
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
11k Public Awareness Program
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

Proposed ACI Modifications Month Year doc.: IEEE 802.11-07/0442r1 Month YearMarch 2007 Proposed ACI Modifications Date: 2007-03-12 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair stuart@ok-brit.com as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. M. Kobayashi, Broadcom Corp John Doe, Some Company

Month Year doc.: IEEE 802.11-07/0442r1 Month YearMarch 2007 Abstract Overview of proposed modifications to the P802.11.2 recommended practice to resolve task group comments numbers: 101,102,103,104,105,106,107,108,109,110, 118,170 M. Kobayashi, Broadcom Corp John Doe, Some Company

Original ACI Test Block Diagram Month YearMarch 2007 Original ACI Test Block Diagram ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator Attenuator mux AWG WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Terminator Directional coupler Circulator M. Kobayashi, Broadcom Corp

ACI Test Block Diagram with WLCP jammer Month YearMarch 2007 ACI Test Block Diagram with WLCP jammer ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator Isolator M. Kobayashi, Broadcom Corp

ACI Test Block Diagram with AWG jammer Month YearMarch 2007 ACI Test Block Diagram with AWG jammer ACI block diagram Conducted version Based roughly on conducted environment as specified in the draft but with modifications specific to ACI performance measurements Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter WLCP (Inband) Attenuator DUT (client) Attenuator AWG Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator M. Kobayashi, Broadcom Corp

Original Calibration Month YearMarch 2007 Calibration Procedure PM A B Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, C to A, D to A and E to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, C to PM, D to PM and E to PM Measure path loss from C to B with attenuator set to 0 Basic idea is to measure power at point A given input from any source. PM Power Meter A WLCP (Inband) Attenuator DUT (client) Attenuator B Attenuator D mux AWG C WLCP (jammer) Attenuator WLCP (client jammer) E Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Terminator Directional coupler Circulator M. Kobayashi, Broadcom Corp

Calibration of ACI setup with WLCP jammer Month YearMarch 2007 Calibration of ACI setup with WLCP jammer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, C to A, and D to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, C to PM, and D to PM Basic idea is to measure power at point A given input from any source. Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter PM A WLCP (Inband) Attenuator DUT (client) Attenuator B D C WLCP (jammer) Attenuator WLCP (client jammer) Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator Isolator M. Kobayashi, Broadcom Corp

Calibration of ACI setup with AWG jammer Month YearMarch 2007 Calibration of ACI setup with AWG jammer Calibration Procedure Measure path loss from every point to point A enumerated as B to A, and C to A Measure path loss from every point to powermeter (PM) enumerated as B to PM, and C to PM Basic idea is to measure power at point A given input from any source. Test Controller Control of Attenuators Control of Traffic Generator and Analyzer Control of Power Meter Traffic Generator Traffic Analyzer Power Meter PM A WLCP (Inband) Attenuator DUT (client) Attenuator B C AWG Legend: ______ RF cables ______ Non-RF data paths ______ Control Cables Splitter/Combiner Directional coupler Shielded box Terminator M. Kobayashi, Broadcom Corp