INSTALLATION OF THE STAR MACHINE TWIN MOTOR EVP AND BATTERY

Slides:



Advertisements
Similar presentations
Modern Automotive Technology PowerPoint for by Russell Krick
Advertisements

J.P. Langston Brake Retrofit
Unit Seven: Pumps and Compressors
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Service Training PV Series 42 PVplus
ModICE Modular Integrated Connector Enclosure
Installation. Indoor Unit Installation Typical Installation.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Yamaha oil pump rebuild
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Engine Removal and Disassembly
PISTON ENGINES Part 1 Introduction.
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
© 2012 Delmar, Cengage Learning Ordering Parts, Short and Long Blocks, and Engine Assembly Chapter 55.
INSTALLATION OF THE STAR MACHINE EVP AND BATTERY
Steering Columns.
Diesel Engine 4 Stroke Cycle model
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
REASSEMBLY and INSTALLATION u Chapter 12 u Classroom Manual u Page 325 CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman IN-VEHICLE ENGINE SERVICE 27.
Installation. Indoor Unit Installation Typical Installation.
I.C. ENGINES Practical No: 1 (17 Mar, 2014). Measurement of Cylinder Pressure If your vehicle has been running roughly or losing power, there may be a.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Diesel Engine Components
Automotive Engines Theory and Servicing
CANTY QUICKPORTS™ “How they work”
Automotive Heating And Air Conditioning
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Clutch Fundamentals.
ModICE Modular Integrated Connector Enclosure
Bilge Pump Service Project Model Service Kit
IN-VEHICLE ENGINE SERVICE
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
INSTALLATION OF THE STAR MACHINE TWIN MOTOR EVP AND BATTERY
Diesel Engine 4 Stroke Cycle model
Engine Removal and Replacement
Delphi Fuel pump. Overshoot protection screw. No load throttle adjust
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
4000B (M3) ½”-2”.
4D-100, 4D-600 2½”- 10”.
C400, C400N, C400Z 21/2”-10”.
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
375DA 2½”-10”.
M400, M400N, M400Z 21/2”-10”.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Replacing TrueAir Thermostat with Ecobee SI
450DA 4”-10”.
709 2½ ”-10”.
Automotive Engines Theory and Servicing
Presentation transcript:

INSTALLATION OF THE STAR MACHINE TWIN MOTOR EVP AND BATTERY PAGE 1: VACUUM PUMP DESCRIPTION AND OPERATION PAGE 2 : OVERALL DIMENSIONS OF VACUUM PUMP PAGES 3 THRU 8: INSTALLATION PAGES 9: REGULAR MAINTENANCE PAGES 10 THRU 13: DYNAMIC SEAL REPLACEMENT PAGE 14: INTAKE AND EXHAUST TUBE REPOSITIONING PAGE 15: TWIN MOTOR WIRING PAGE 16: TWIN MOTOR DRIVE INSTALL STAR MACHINE PHONE: 667.210.3874 7810 OAK AVENUE FAX: 410.661.2467 PARKVILLE, MARYLAND 21234 EMAIL: STARVACUUMPUMPS@GMAIL.COM

The Star Machine Electric Vacuum Pump (EVP) is representative of our continued efforts to provide racers with the latest vacuum pump technology. The EVP is a DC electric, reciprocating piston vacuum pump. It incorporates two dynamic seal pistons, coupled to a common yoke that is eccentrically driven in a common bore. The EVP offers the distinct advantage of ALL the HP gains, thru increased crank case vacuum, with ZERO HP lost to driving a mechanical vacuum pump. Originally designed for Pro Stock Motorcycle to comply with the one pump rule it is also currently used in Pro Stock Car as a vacuum assist pump. In PSB applications it is equal to 5 times the capacity of the most commonly used pump to produce crank case vacuum. In PSB it is producing vacuum levels of 25” Hg.(wire to wire). In PS Car applications it has shown a 15 - 20% increase over existing crank case vacuum readings. At Star Machine we realize that you don’t get something for nothing. The electric motor driven EVP adds the requirement of between round battery maintenance (recharging). This will be considered, by some racers as a burden (one more between round headache). Other racers, looking for that last .01 second advantage, will view the additional maintenance as part of the game. The EVP Kit is sold (complete) with two 24 VDC rechargeable batteries, and charger, quick change (battery) holder, wiring harness and vacuum hose. The EVP operates (completely) separate from your existing (12/16 VDC) electrical system. To complete the EVP installation one 12V-40A normally open switch is required to operate the pump. (We recommend switching the positive side) Activating the pump is presently (and recommended) done when the vehicle is pre-staged. In most cases at the same time the data recorder is switched on. This will guarantee the pump motor will receive the maximum available battery power. The vacuum line connection to the engine is critical to the operation of the EVP. Drawing oil into the EVP may result in damage to the reeds. Care must be taken to baffle and/or separate the engine oil from the air drawn by the pump. More important to the performance of the pump is the sealing of the engine, the better the seal the higher the potential vacuum. We also recommend that a check valve be installed in the vacuum line, at the pump inlet. 1

2

MOUNTING THE VACUUM PUMP AND BATTERY HOLDER THE PUMP CAN BE MOUNTED IN ANY POSITION HOWEVER WE RECOMMEND THAT THE CHOSEN POSITION HAS THE EXHAUST (RED) TUBE LOWER THAN THE INTAKE (BLUE) TUBE OR THE RED TUBE IS BELOW THE PUMP BODY PHOTO 2 SHOWS THE THREE MOUNTING HOLES OF THE PUMP PHOTO 1 SHOWS THE SHOWS THE TWO MOUNTING HOLES FOR THE BATTERY HOLDER PG. 4; PHOTOS 3 & 4 SHOW UNAPPROVED MOUNTING POSITIONS FOR THE BATTERY HOLDER (IN THESE CASES IF THE LATCH IS NOT ENGAGED THE BATTERY MAY SLIDE OUT OF THE HOLDER UNDER DECELERATION) PG. 4; PHOTOS 5 & 6 SHOW APPROVED MOUNTING POSITIONS (PHOTO 6 SHOWS THE BEST POSITION) (APPROVED POSITIONS ARE WHERE THE BATTERY INSTALL/REMOVAL DIRECTION IS PERPENDICULAR TO THE DIRECTION OF VEHICLE TRAVEL) * * WITH ONE EXCEPTION, WHERE THE BATTERY IS PULLED DOWNWARD FOR REMOVAL ** BATTERY MOUNTING CONTAINS (2) 5/16”-18 TAPPED HOLES ON 2.375’ CENTERS EVP MOUNTING PLATE CONTAINS (3) ¼”-20 TAPPED HOLES ON 1.75” CENTERS 1 2 3

FRONT OF VEHICLE 3 4 6 5 4

WIRING THE VACUUM PUMP PHOTO 7: EVP CONNECTORS; THE FEMALE END IS CONNECTED TO THE BATTERY BLOCK, USE A NORMALLY OPEN SWITCH RATED FOR 12 VDC @ 40 AMPS (MINIMUM CONTINUOUS) AND 80A INRUSH TO ACTIVATE THE PUMP. WE RECOMMEND SWITCHING THE POSITIVE LEAD PHOTO 8: SHOWS THE CONNECTION TO THE BATTERY HOLDER BLOCK NOTE: THE TWIN MOTOR EVP’S ARE POLARITY SENSITIVE ! THE EVP HAS A PREWIRED LOCKING MOISTURE RESISTANT CONNECTOR (MALE) THE EVP IS SOLD WITH MATING PREWIRED CONNECTOR (FEMALE) WITH 14” LEADS 7 8 5

WIRING THE VACUUM PUMP _ + + PHOTOS 9 AND 10 DETAIL THE BATTERY CONNECTION, USE 12 AWG (19 STRAND THHN) WIRE SECURE LEADS WITH PROVIDED SHCS (7/64” HEX KEY) INSERT STRIPPED LEAD FULLY INTO CONNECTOR _ + + STRIP LEADS BACK 0.5” 9 10 6

PLUMBING THE VACUUM PUMP THE PUMP IS SUPPLIED WITH -12 AN MALE FITTINGS (¾” SLIP ON FITTINGS ARE SPECIAL ORDER) CONNECT THE HOSE FROM THE ENGINE TO THE BLUE TUBE CONNECT A HOSE FROM THE RED TUBE TO A CATCH CAN. THE CATCH VENT MUST BE CAPABLE OF FLOWING A MINIMUM OF 16 SCFM THE POSITION OF THE INTAKE AND EXHAUST TUBES CAN BE CHANGED. AS SHOWN IN THE PHOTO; BLUE TUBE IS ON THE RIGHT AND THE RED ON THE LEFT. HOWEVER THEY CAN BE POSITIONED BOTH TO THE RIGHT OR BOTH TO THE LEFT OR BLUE-LEFT AND RED- RIGHT (SEE PAGE 14 FOR REPOSITIONING THE INT/EXH TUBES) ONCE INSTALLED THEY CAN BE ROTATED ABOUT THEIR LENGTH (AXIS) AS WELL WHEN MOUNTED THE RED (EXHAUST) TUBE MUST BE BELOW THE BLUE (INTAKE) OR BOTH TUBES BELOW THE BLACK MOTOR COVER AS SHOWN 7

+ LOADING BATTERY INTO HOLDER RETRACT BATTERY RETAINING PIN (PHOTO 1) SLIDE BATTERY OUT OF HOLDER SLIDE FULLY CHARGED BATTERY INTO HOLDER DO NOT FORCE BATTERY! CHECK THE GAP IN THE CONTACT(S). SEE: REGULAR MAINTENANCE (PG. 9 ) PULL BACK ON BATTERY TO INSURE THAT RETAINING PIN HAS ENGAGED BATTERY RETAINING PIN CONTACTS 1 8

REGULAR MAINTENANCE BATTERY CHARGING IS THE MOST IMPORTANT PART OF EVP PERFORMANCE AND MAINTENANCE. FOLLOW THE MANUFACTURERS INSTRUCTIONS FOR CHARGING THE BATTERY. A FULLY CHARGED BATTERY WILL RUN THE PUMP FOR 3 MINUTES THE BATTERY MOUNTING BLOCK CONTACTS WILL NEED TO BE CHECKED FOR GAP (.017”). THE O-RING WILL MAINTAIN THE GAP, HOWEVER IF A BATTERY TERMINAL IS BENT, IT WILL SPRING THE CONTACT OPEN OR MAY FOLD IT OVER. IF THE BATTERY DOES NOT “SLIDE” INTO PLACE THE GAP IS TOO SMALL OR THE BATTERY TERMINAL(S) MAY BE BENT. THE GAP IS EASILY OPENED WITH A SCREW DRIVER OR CLOSED WITH PLIERS. + 9

DYNAMIC SEAL REPLACEMENT THE RUBBER QUATRO RING SEAL IS OBSOLETE THE REPLACEMENT IS UHMW, PN STR.18.02.124 REPLACE ONE SEAL AT A TIME (REMOVE ONE HEAD ONLY) REMOVE THE THREE #10-24 SHCS (5/32” ALLEN) MOUNTING THE HEAD (PG. 11, PHOTO 1) ROTATE THE PUMP GEAR TO POSITION THE YOKE (PIN) IN THE CENTER OF STROKE (PG. 11, PHOTO 2) REMOVE THE PISTON ¼-20 SHFH (5/32” ALLEN) , PUSH ON ONE SIDE OF THE PISTON, ROTATING IT 90 DEGS. PULL THE PISTON OUT (PG. 11, PHOTO 4) REMOVE THE SEAL AND CLEAN THE PISTON GROOVE. PLACE WTH THE NEW UHMW SEAL ON PISTON.(PG. 12, PHOTOS 7 & 8. PLACE PISTON INTO BORE (PG. 12, PHOTO 9) PUSH ON EDGE TO ROTATE PISTON SQUARE IN BORE (PG. 12, PHOTO 10) USE 5/32” ALLEN WRENCH TO ALIGN BOLT HOLE IN PISTON TO TAPPED HOLE IN YOKE (PG. 12, PHOTO 11) INSTALL SCREW (DO NOT TIGHTEN) ROTATE GEAR TO PUT THE PISTON (PIN) TO END OF STOKE (PG. 11, PHOTO 2) BEFORE TIGHTENING THE SCREW, BE SURE THAT THE PISTON HUB (PG. 11 PHOTO 6) IS SEATED INTO THE YOKE COUNTER BORE (PG. 11 PHOTO 5) THIS IS EVIDENT (PG. 11 PHOTO 3) WHEN THE PISTON IS AT END OF IT’S STROKE, SQUARE TO THE CYLINDER AND .030” DOWN FROM THE CYLINDER LIP. LUBRICATE THE HEAD O-RING AND THE TUBE BORES WITH ENGINE OIL. (PG. 13 PHOTO 13) REPLACE THE HEAD (PG. 13. PHOTOS 14 & 15) REPEAT THE STEPS ABOVE TO REPLACE THE OTHER SEAL 10

DYNAMIC SEAL REPLACEMENT PISTON SCREW REMOVE END OF STROKE REMOVE REMOVE CENTER OF STROKE 1 2 3 REMOVE YOKE COUNTER BORE PISTON HUB 4 5 6 11

DYNAMIC SEAL REPLACEMENT DISCARD RUBBER SEAL INSTALL NEW UHMW RING STR.18.02.124 CLEAN SEAL GROOVE 7 8 9 10 11 12 12

DYNAMIC SEAL REPLACEMENT TUBE BORE CYLINDER O-RING 13 15 14 13

INTAKE/EXHAUST TUBE REPOSITIONING FOLLOW THE INSTRUCTIONS ON PG. 11, PHOTO 1 MOVE THE TUBES, ALWAYS KEEP THE BLUE TUBE HIGH AS THE MOTOR LUBE THE O-RINGS. REINSTALL THE HEAD 14

NOTE: THE TWIN MOTORS ARE POLARITY SENSITIVE ! TWIN MOTOR WIRING NOTE: THE TWIN MOTORS ARE POLARITY SENSITIVE ! ALWAYS MAINTAIN POSITIVE TO POSITIVE AND NEGATIVE TO NEGATIVE BETWEEN MOTORS, CONNECTORS AND TO THE BATTERY NEGATIVE MOTOR LEADS POSITIVE LEAD OF CONNECTOR NEGATIVE JUMPER POSITIVE JUMPER POSITIVE LEAD OF CONNECTOR POSITIVE MOTOR LEADS 15

REMOVE 4 SCREWS INDICATED (5/32” HEX) REMOVE ENTIRE DRIVE ASSEMBLY SAVE SPARES BE SURE CAM FOLLOWER ENTERS SLOT OF YOKE INSTALL NEW DRIVE ASSEMBLY NEW DRIVE ASSEMBLY STR.18.09.025 = HEAT TREATED 4130 GEAR