Linac Coherent Light Source (LCLS) Low Level RF Status

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Ron Akre, Dayle Kotturi LCLS LLRF September 19, 2006.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
LLRF for PXIE Brian Chase For the Project X LLRF Collaboration 1 PX Collaboration Meeting, April 2012 Berkeley - B. Chase.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
LCLS_II High Rep Rate Operation and Femtosecond Timing
ILC LLRF Status Ruben Carcagno, Brian Chase
Timing and synchronization at SPARC
RF Synchronisation Issues
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
LLRF and Beam-based Longitudinal Feedback Readiness
A Portion of the SCP RF Control System LCLS Related
CEPC RF Power Sources System
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
BESIII EMC electronics
LLRF Control System Outline Scope Requirements Design Considerations
LCLS Longitudinal Feedback and Stability Requirements
RF Pulse Shaping.
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Undulator Cavity BPM System Status
Breakout Session SC5 – Control Systems
Operational Experience with LCLS RF systems
Undulator Cavity BPM Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Breakout Session SC3 – Undulator
Presentation transcript:

Linac Coherent Light Source (LCLS) Low Level RF Status

Safety First and Second and Third…..to Infinity Hazards in the LLRF system RF 1kW at 120Hz at 5uS = 0.6 Watts average, 2 Watt average amps at 2856MHz, 60W average amps at 476MHz Hazards – RF Burns / Cataracts Mitigation – Avoid contact with center conductor of energized connectors. All employees working with LLRF systems are required to have the proper training. 110VAC Connector Hazards - Shock Mitigation - Don’t touch conductors when plugging into outlet. All chassis are inspected by UL trained inspector.

Status of Hardware for Injector Turn-on Linac Sector 0 RF Upgrade All 3 RF Chassis completed and Installed (Master Oscillator, Master Amp, PEP phase Shifter Control Module ready for test – higher phase noise levels if not installed Sector 20 RF distribution system Phase and Amplitude Controllers (PAC) – 5 units Phase and Amplitude Detectors (PAD) – 2 units Phased Locked Oscillator – Use SPPS unit for Turn On LO Generator – Complete - 75% tested – looks good so far Multiplier – 476MHz to 2856MHz – Complete 4 distribution chassis – Complete 102MHz, 2056MHz, 2830.5MHz Laser Phase Lock – Needs testing – Only high risk item Distribution Amplifiers – 10W, 2850MHz due Oct 25, 102MHz Amp being built LLRF Control and Monitor System 1 kW Solid State S-Band Amplifiers – 5 units – Design Complete, In Fab PAD – 12 units – 6 required for turn on PAC – 6 units Bunch Length Monitor Interface – Will use PAD to collect data Beam Phase Cavity Will use 2 channels of PAD Chassis Pill box cavity with 2 probes and 4 tuners – 2805MHz 3 units Complete

Status of Software for Injector Turn-on PAD Software Operational PAC Software Local Feedback (in VME) Data analysis shows simple feedback algorithm will work. Optimization of algorithm continues. Time measurement: measure time needed for data acq, for transfer to VME, for VME processing, for transfer to PAC. Time measurement: needed for multiple local loops. Eg. Measure scalability from 1 to N instances. RF Gun Temperature Feedback In Design Calibration and Test Host Applications In progress (This means we are working on specifications.) Storing of boot params, serial numbers, etc in flash or on the board for PAD and PAC

Status of Documentation + Reviews LLRF Control Design Specification This Engineering Specification Document was signed off by Project Office on 9/27/2006. LLRF Final Design Review This review was held on 9/19/2006. The scope of the review covered: RF Distribution Reference System for Injector Commissioning RF System for Injector Commissioning PAD PAC VME The goals of the review were: Injector RF turn on is January 3, 2007. The designs of the prototype PADs and PACs have been built and tested. Fabrication is scheduled for October, 2006. Please review analysis of test data and the proposed design and comment on the proposed systems' ability to meet LCLS specifications. Review our test plans and suggest improvements

LCLS Layout P. Emma

LCLS RF Jitter Tolerance Budget Lowest Noise Floor Requirement 0.5deg X-Band = 125fS Structure Fill time = 100nS Noise floor = -111dBc/Hz @ 11GHz 10MHz BW -134dBc/Hz @ 476MHz X-band X- 0.50 RMS tolerance budget for <12% rms peak-current jitter or <0.1% rms final e− energy jitter. All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac. P. Emma

Slow Drift Tolerance Limits (Top 4 rows for De/e < 5%, bottom 4 limited by feedback dynamic range) Gun-Laser Timing 2.4* deg-S Bunch Charge 3.2 % Gun RF Phase 2.3 Gun Relative Voltage 0.6 L0,1,X,2,3 RF Phase (approx.) 5 L0,1,X,2,3 RF Voltage (approx.) (Tolerances are peak values, not rms) P. Emma, J, Wu * for synchronization, this tolerance might be set to 1 ps (without arrival-time measurement)

Linac Sector 0 RF Upgrade LCLS must be compatible with the existing linac operation including PEP timing shifts Master Oscillator is located 1.3 miles from LCLS Injector 1.3 Miles to LCLS Injector Measurements on January 20, 2006 at Sector 21 show 30fS rms jitter in a bandwidth from 10Hz to 10MHz PEP PHASE SHIFT ON MAIN DRIVE LINE MDL RF with TIMING Pulse – Sync to DR

RF Distribution Lab vs. MDL Measurements Existing Linac MDL Sector 0 126fS rms Jitter 10Hz to 10MHz LCLS Reference System Lab Measurements 20fS rms Jitter 10Hz to 10MHz If PEP IQPAU Chassis is not commissioned we may not meet LCLS specifications John Byrd LBNL

Sector 20 RF Distribution MDL from Sector 0 LO and 102MHz resync by adjusting 2856MHz PAC while monitoring S21 2856MHz Laser resync with laser PAC while monitoring difference in 119MHz laser and FIDO out

Lab Test Setup Reference, PAC, PAD The LCLS RF system duplicated in the lab and used for testing of PADs and PACs. At least two of each frequency generation chassis is built to measure phase noise levels. Most components will have development chassis which can be used as a spare. There is only one Dayle, spare is not in the budget.

LCLS New Reference System Lab Measurements Lab Tests Show Reference System Noise Levels Meet All LCLS Requirements 2856MHz = 70fSrms 2830.5MHz = 70fSrms 25.5MHz = 2pSrms 102MHz = 2pSrms 2856MHz : 22fSrms 10Hz to 10MHz 2830.5MHz : 22fSrms 10Hz to 10MHz John Byrd - LBNL 25.5MHz : 152fSrms 10Hz to 1MHz 102MHz : 281fSrms 10Hz to 10MHz

RF Cable Routing All cables are routed from devices in temperature stabilized area to the centrally located, temperature stabilized, RF Hut in the linac gallery. RFHUT Cables run down through penetration 20-17 which is enclosed by the RF Hut Picture taken from Carl Rago’s Talk

RF System Cables / Specifications LCLS Specifications: Laser, RF Gun – 2.3pS L0A, L0B, L1S, L1X, L2, L3 – 5pS

SLAC Linac RF – New Control The new control system will tie in to the IPA Chassis with 800W of drive power available. The RF Reference will be from the new RF reference system. Solid State Sub-Booster PAC I and Q will be controlled by the PAC chassis, running 16bit DACs at 102MHz. Waveforms to the DACs will be set in an FPGA through a microcontroller running EPICS on RTEMS. Existing System

Linac Station 21-1 Tests (Aug.18, 2006)

Linac 21-1 Test Set-up Power Coupled out from 476MHz MDL drives a 476MHz Amplifier which feeds a 6X Multiplier from 476MHz to 2856MHz. The 2856MHz out drives both the LO generator and the PAC. The 2830.5MHz LO and 102MHz CLK Generator supplies the LO and CLK to the PAD. A CLK output of the PAD drives the PAC CLK. The PAC output drives the SSSB. The SSSB drives the existing IPA chassis The klystron output coupler is used to measure phase and amplitude with the new PAD.

Linac 21-1 Test Results Tests were done in the gallery with no temperature regulation on cables. Average RMS value of 2 second sliding average is 0.068 degrees. Exponential Smoothing Yields the Following Results. Lowest noise is with a time constant of about 2 points.

LLRF Commissioning – no high power RF, no beam Low Level Lab Tests and Calibration PACs and PADs Set at Operational Temperature PAC Tests and Calibration – SSB Modulator : Set offsets and gain PAD Tests ADC Board – SNR Cross Talk – Sine Wave histogram Chassis – Two Tone or Single Tone - SNR, Noise Floor, IP3 Installation of PACs and PADs – Other systems required to be complete LLRF Racks - installed Water System Trigger system AC Rack power Test RF Cables - Measure Attenuation and Phase Stability Installation of Solid State Sub-Boosters (SSSB) Installation of RF VME Crate Installation of network switches Get devices booting from afsnfs2 Test VME connectivity to PAD by sending I and Q avgs. Connection of PADs, PACs, and VME IOCs to network Initial Set-up of PAC triggers Align 119MHz trig to 102MHZ clocks for PACs and PADs PAD Calibrations Enter channel calibration factors (APCs, Power Scale Factors – coupler ratios…) PAC Calibration Calibration with spectrum analyzer Calibration with PAD channel Phase Noise Measurements 102MHz Clock : 2830.5MHz LO : 2856MHz RF : Laser Lock to RF

LLRF Commissioning - high power RF, no beam Timing System setup Line up PAC and PAD triggers to existing modulator triggers Adjust PAC waveforms for 6 Klystron stations Adjust PAD window length and offset to fit waveform Commission local Feedback loops Gun Tune Gun Phase Gun Amplitude L0A Phase L0A Amplitude L0B Phase L0B Amplitude Tcav Phase Tcav Amplitude L1S Phase L1S Amplitude L1X Phase L1X Amplitude Test Standby Timing and BCS functions

LLRF Commissioning - high power RF, with beam Timing System setup Adjust PAC and PAD triggers to align waveforms to beam time 119MHz PAD/PAC triggers must move in increments of 14 ticks to keep all phases aligned (~117.6nS). PAD window must move in increments of four 102MHz cycles to keep phase reading the same. (~39.2nS). Increments of 9.8nS will cause 90 degree phase shifts in readings. Commission local Feedback loops Gun Phase - Phase to beam (Rotate phase to get max beam energy) Gun Amplitude - Check Cal (RF power to maximum energy gain) L0A Phase - Phase to beam L0A Amplitude - Check Cal L0B Phase - Phase to beam L0B Amplitude - Check Cal Tcav Phase - Phase to Beam Tcav Amplitude - Check Cal L1S Phase - Phase to Beam L1S Amplitude - Check Cal L1X Phase - Phase to Beam L1X Amplitude - Check Cal

Host Applications Generic Distribution System PAC PAD Testing Correlation plots Calibration of power levels using beam energy Distribution System Rotate Phase 360 degrees Monitor Phase Errors in Dividers Correct Divider Phase Errors PAC Calibration Mode Operation Generate and Load Waveforms Panels for Phase and Amplitude Adjustment PAD Testing Crosstalk, SNR, Noise Floor Sine Wave Histogram Panels for Phase and Amplitude Monitoring Local Feedback Control Panels

END of TALK