Preliminary Analysis of April 24, 2006 CESR Bunch Measurements

Slides:



Advertisements
Similar presentations
June 14, 2007Pauli Kehayias1 Fast Ion Instability in CesrTA/ILC -Project extent –To study simulations of fast ion instability with CesrTA in mind -Progress.
Advertisements

Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
1 POSINTS Simulations of e-cloud induced coherent tuneshifts for Cesr-TA Regular Bends (exact input parameters as in Gerry runs). Positron beam M. Venturini.
ElectronsdFud Simulation Work at Cornell Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
Space Charge Electric-Field Calculations for Coherent Tune Shift Estimations using the Electron-cloud Modelling Algorithm ECLOUD Jim Crittenden Cornell.
Ivan Bazarov, New Tool for Beam Break-up Simulations, SRF mtg, 9 April CHESS / LEPP New tool for beam break-up analysis y z y x EB injected beam.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
TE Wave Measurements Of Electron Cloud At CesrTA J. Byrd, M. Billing, S. De Santis,M. Palmer, J. Sikora ILC08 November 17 th, 2008.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Feedback for CESR TA Michael Billing May 17, 2007.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
Global Design Effort 1 Damping Ring Activities at Cornell Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education ILC2007.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
November 18, 2011David L. Rubin1 CESR Test Accelerator – Investigation of the physics of charged particle beams Circumference = 768m - Beam energy
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
Jim Crittenden CHESS Simulation Working Group 30 March 2015
Operating Experience with Electron Cloud Clearing Electrodes at DAFNE
Electron Cloud Measurement Summary for the April 2014 Run
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Failure analysis at BEPCII
Linac possibilities for a Super-B
e- Cloud Machine Studies-Tune Shift Studies
CesrTA Status and Planning
Electron Cloud Studies at CESR-c and CesrTA
Beam Optics Set-Up at SLAC End Station A
Recent Electron Cloud Studies at CESR and Future Plans
Top-Up Injection for PEP-II and Applications to a Higgs Factory
E-cloud instability at CESR TA
The Effect of Poisson Data Weighting on Streak Camera Diagnostics
A Head-Tail Simulation Code for Electron Cloud
Positron vs. Electron Beam Behavior
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CesrTA Experimental Schedule and Priorities
e+ Vertical Beam Size during CESR-c Collisions
e+/e- Vertical Beam Size during CESR-c Collisions
Electron cloud studies at CESR
Study of Fast Ions in CESR
e-/e+ Vertical Beam Dynamics with 6 and 12Wigglers On
ICFA Mini-Workshop, IHEP, 2017
e+ Vertical Beam Size during CESR-c Collisions
G. Codner, E. Tanke, M. Palmer Cornell University
e- Cloud Studies-Tune Studies with 45 Bunch Trains
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Beam Size Flip-Flop Measurements
e+/e- Vertical Beam Size during CESR-c Collisions
Proposal for a CESR Damping Ring Test Facility
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
CHESS energy, 9x6 electrons and positrons, coupling tests
Presentation transcript:

Preliminary Analysis of April 24, 2006 CESR Bunch Measurements M. Billing, G. Codner, R. Holtzapple, M. Palmer, D. Rice, E. Tanke, M. Watkins

CESR Machine Studies Meeting Measurement Overview April 24, 2006 BSM 23E (e+) setup 2 GeV e- e+ Cloud Studies 1x45 positrons vs bunch current Bunch tunes (BPM 6W1) Bunch sizes (BSM 23W) 1x45 electrons vs bunch current Bunch sizes (BSM 23E) 5 GeV e- Cloud Studies CHESS positron pattern (on-axis) CHESS electron pattern (on-axis) May 19, 2006 CESR Machine Studies Meeting

2.08 GeV 0.5 mA e+ Stable Beam ~1 kHz tune variation from start to end of train Minimal variation size Vertical Units: PMT Channel = mm May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting 2.08 GeV e+ 0.75 mA ~1.5 kHz Spread Unstable Current Why is width stable longer? 1.0 mA ~2-3 kHz Spread May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting 2.08 GeV e- Tunes 1.5 mA Unstable 0.5 mA Unstable 1.0 mA Unstable May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting 2.08 GeV e- Beamsize 1.5 mA Unstable 0.5 mA Unstable 1.0 mA Unstable Appears that we didn’t have stable conditions from the outset Not a valid electron cloud measurement Will need to repeat more carefully Set conditions at max bunch current and then make measurements vs current without changing machine setup May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting 5 GeV e+ 1x45 Tunes 0.5 mA ~0.5 kHz Spread 1.0 mA ~1.25 kHz Spread 0.75 mA ~0.75 kHz Spread 1.25 mA ~1.5 kHz Spread May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting 5 GeV e+ 1x45 Beamsize Onset of instability Need to take some turn-by-turn data to understand fully (separate centroid motion from width) 0.5 mA ~0.5 kHz Spread 1.0 mA ~1.25 kHz Spread 0.75 mA ~0.75 kHz Spread 1.25 mA ~1.5 kHz Spread May 19, 2006 CESR Machine Studies Meeting

CESR Machine Studies Meeting Septum Analysis In Progress … May 19, 2006 CESR Machine Studies Meeting