MC production plans : 1/08/ /03/2001

Slides:



Advertisements
Similar presentations
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
Advertisements

LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001.
The LHCb DAQ and Trigger Systems: recent updates Ricardo Graciani XXXIV International Meeting on Fundamental Physics.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
Marco Cattaneo, 23rd February Status of the software migration  Migration strategy: Where we should be  Status: Where we are  Plans.
LHCb Applications and GRID Integration Domenico Galli Catania, April 9, st INFN-GRID Workshop.
LHCb computing in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, October 2005.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
April 21st 2010Jacques Lefrancois1 UPGRADE NEWS Scope of upgrade presented by Andrei in upgrade meeting April 16th Role of trigger presented by Hans in.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Preliminary studies on Muon System software alignment LHCb week CERN May 29-th, June 2-nd 2006 Stefania Vecchi INFN Bologna Wander Baldini INFN Ferrara.
March 13, 2002 Daniel Whiteson L3 tracking - muons! Daniel Whiteson LBL.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
LHCb Lausanne Workshop, 21st March /12 Tracking Software for DC’06 E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop  To do list, and done.
The LHCb CERN R. Graciani (U. de Barcelona, Spain) for the LHCb Collaboration International ICFA Workshop on Digital Divide Mexico City, October.
LHCb production experience with Geant4 LCG Applications Area Meeting October F.Ranjard/ CERN.
RICH upgrade simulation: updates S.Easo RICH upgrade-mechanics meeting 1.
June 29, 2000DOE/NSF USCMS Computing and Software Report. HLT Studies D. Acosta1 High-Level Trigger Studies Darin Acosta University of Florida DOE/NSF.
Report to Worldwide Analysis Review Panel J. Harvey 23 March 2000 Slide 1 LHCb Processing requirements Focus on the first year of data-taking Report to.
W/Z Plan For Winter Conferences Tom Diehl Saclay 12/2001.
Status of the Bologna Computing Farm and GRID related activities Vincenzo M. Vagnoni Thursday, 7 March 2002.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
April 6, 2000 LHCb Event Data Model Pavel Binko, Gloria Corti LHCb / CERN 1 LHCb Software week LHCb Event Data Model Pavel Binko Gloria Corti LHCb / CERN.
1 Occupancy, Rate Effects & Combinatorial Background By Rusty Towell January 8, 2009.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Web Data Quality Analysis 1 WEB DATA QUALITY ANALYSIS Jonathan Levell (Summer Student) Working with:
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Alignment in real-time in current detector and upgrade 6th LHCb Computing Workshop 18 November 2015 Beat Jost / Cern.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
LHCb GRID Meeting 11/12 Sept Sept LHCb-GRID T. Bowcock 2 AGENDA 9:30 LHCb MC Production –Points SICB Processing Req. Data Storage Data Transfer.
CLRC Grid Team Glenn Patrick LHCb GRID Plans Glenn Patrick LHCb has formed a GRID technical working group to co-ordinate practical Grid.
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
Calo Software: Urgent tasks and resources Ivan Belyaev LHCb, CERN & ITEP/Moscow.
M. Brooks, 28-Mar-02 Heavy/Light meeting 1 Muon Analysis Work Getting Code ready for first data pass - DONE Get ready for second pass on DSTs - muon identification.
Living Long At the LHC G. WATTS (UW/SEATTLE/MARSEILLE) WG3: EXOTIC HIGGS FERMILAB MAY 21, 2015.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
Extending the PHENIX physics reach Physics beyond the baseline accessible at RHIC II Capabilities needed to address the new physics Detector upgrades to.
Marco Cattaneo, Milano, 27th September Brunel status and plans Status of commissioning Forthcoming improvements Conventions.
LHCb Simulation LHCC Computing Manpower Review 3 September 2003 F.Ranjard / CERN.
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
L0 Bandwidth Division for the TDR Eduardo Rodrigues, CERN
The LHCb Installation Story
Migration of reconstruction and analysis software to C++
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Physics Software Towards first Physics data Reconstruction Alignment
The LHCb Software and Computing NSS/IEEE workshop Ph. Charpentier, CERN B00le.
Particle detection and reconstruction at the LHC (IV)
LHCb computing in Russia
Status of Brunel team and next steps
ATLAS B-physics important periods
T. Bowcock University of Liverpool For the LHCb Collaboration
Mini Tower Preliminary Results
LHCb Alignment Strategy
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Muon Group Software Report
2 Getting Started.
And plan for SICBDST retirement
Summary Computing Model SICb Event Model Detector Description
LHCb Data Quality Check web. cern
Agenda SICb Session Status of SICb software migration F.Ranjard
First attempt at using WIRED
The LHCb Front-end Electronics System Status and Future Development
Joel Closier Eric van Herwijnen Agnieszka Jacholkowska
Presentation transcript:

MC production plans : 1/08/2000 - 31/03/2001 Agnieszka Jacholkowska 05/07/2000 A. Jacholkowska

A. Jacholkowska LHCb SoftwareWeek TDRs (1) End July 2000 : CALOs 280k events on RAWH, DST1 RICH 230k events on RAWH, DST1 Muons (TDR end 2000+) new version SICBMC and SICBDST - August 2000 detailed geometry, x-talk, timing, ...  Test Data 50k - 100k events RAWH and DST1 (mostly mbias and B   X) final production - October 2000 50k - 100k events RAWH and DST2 (mbias, B   X, B  J/(  ) K0s ) 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

A. Jacholkowska LHCb SoftwareWeek TDRs (2) Trigger (TDR 2002) L0 CALOs no production foreseen with present software (no noise,…) Muons comprised in the Muon TDR sample L1 - Autumn 2000 request from F. Fiedler (April 2000), for CERN and Lyon, 500k events with DST2 output - channels and mbias Comments on latest calculations on trigger samples (O. Schneider) obviously for later period calculations driven by 0.1% bandwidth for photons (?) before : we have to clarify running conditions for luminosity and trigger thresholds  discussion needed - Milano meeting ? 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

A. Jacholkowska LHCb SoftwareWeek TDRs (3) Tracking (TDR outer tracker - March 2001) new SICBMC (tracking part) will need 60k events in RAWH and DST format reconstructed by BRUNEL, (see BRUNEL meeting) n x specialized samples of 1000 events before end 2000 Vertex Detector (TDR - April 2001) 05/07/2000 A. Jacholkowska LHCb SoftwareWeek

A. Jacholkowska LHCb SoftwareWeek Physics Channels all channels in TP and SM Workshop will be provided on request from analysers , many already exist in RICH TDR sample b inclusive background 500k events (RAWH format) from RAL, reconstructed at CERN ? production of 1 - 2 M events after L0/L1 triggers in MiniDST format at Liverpool farm is under discussion 05/07/2000 A. Jacholkowska LHCb SoftwareWeek