Idle Setup Run Startup Process Wait Event Event Wait Answer Send

Slides:



Advertisements
Similar presentations
Version: :08 CET Trig (10 to 30 Hz) DAQ ready event Start event bunches End event 0 ms ~1 ms 15 ms ~1 ms 33 to 100 ms interrupt CPU DAQ/CC.
Advertisements

I/O Organization popo.
2014 Redrock Software Conference Configuring System Communications s and Text Alerts Iliana Ramos.
Implementing A Simple Storage Case Consider a simple case for distributed storage – I want to back up files from machine A on machine B Avoids many tricky.
Survey Monkey Surveymonkey.com By, Meghan and Amy.
Advanced Workgroup System. Printer Admin Utility Monitors printers over IP networks Views Sharp and non-Sharp SNMP Devices Provided Standard with Sharp.
Systems Programming Assignment 1 overview Due date: 23.11, 23:59 Rotem Golan, Carmel Bregman,
Systems Programming Assignment 3. Mission name Skill Time PreRequisites Items.
J. Linnemann, MSU 6/21/ Agenda L2 monitoring and readout Jim Linnemann 20 min Magic Bus Transceiver Dan Edmunds 20 min Plans for the GL2 Card Drew.
Experiment: Step by Step Author: Anna Bekkerman
This guide will show you how to... Assign a session Assign curriculum or material Approve/Deny training request Request to register an external collaborator.
Michigan State University 7/12/ The Standard L2 Crate James T. Linnemann Michigan State University FNAL L2 Workshop December 19, 1997.
Out-of-order Execution Divider Sanmukh Kuppannagari.
With Microsoft Windows 7© 2012 Pearson Education, Inc. Publishing as Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Windows 7.
Welcome To PTP Personal Transition Plan Advanced Guidance advancedguidance.webs.com.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
1 Process States (1) Possible process states –running –blocked –ready Transitions between states shown.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
1 How to Enroll in a PATHwise Course A Step-by-Step Tutorial.
Connecting and Configuring Clickers. InterWrite PRS - Clicker 2-line LCD Display See data entered Confirmation answer received Variety of question types.
Davos® Telecom Server All-In-One Solution (IVR,ACD,Billing) Architecture> Voice servers, database, disk array, redundancy, administration.
Testing the dynamic per-query scheduling (with a FIFO queue) Jan Iwaszkiewicz.
FNAL STT Meeting  H.Evans 8/9/99 Communication & Control H.EvansColumbia U. Overview of FRC Functions:  Road Info STCs,TFCs –Device Independent Data.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
ONCS Presentation Run control from user’s perspective Common Toolbox Interface to RHIC control C.Witzig PHENIX Core Week June 9, 1999
CMS ECAL DAQ Fiber data block format Magnus Hansen
L3 DAQ Doug Chapin for the L3DAQ group DAQShifters Meeting 10 Sep 2002 Overview of L3 DAQ uMon l3xqt l3xmon.
Module 8: Managing Software Distribution. Collections Packages Programs Advertisements Collections Packages Programs Advertisements How Software.
PIKA Technologies Inc. CAS Logger Application Sample August 2014.
Number your paper from 1 through 25.. Multiplication Facts Ready Set Begin.
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
Event 4: Mental Math 7 th /8 th Grade READY! 5 PENCILS DOWN.
Event 4: Mental Math 5 th & 6 th grade Math Meet 2015.
I/O Organization Competency – C6. Important facts to remember when I/O devices are to be connected to CPU There is a vast variety of I/O devices. Some.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v3.2—1-1 BGP Overview Monitoring and Troubleshooting BGP.
ADMISSION PROCEDURE FOR ATTENDING THE CAROBELL/SCE PRE-VOCATIONAL DAY PROGRAM (When you are ready to move to the next slide, please click your mouse any.
Dance the Difference Subtraction Energizer. Directions Find the answer to the subtraction problem as it comes up on each slide. After you figure out the.
Assessment Using Assessment to improve education Carroll County Schools: A Champion for Kids.
ITC250 Copyright 2008© ITC 1 Assessment -4- Choose the correct answer.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
State Diagrams Andrew Hoos Derek Swager. Server State Diagram Displaying (Single) Waiting (Single) Single Connecting Ready Send Question Receive Answer.
Event 4: Mental Math 5th/6th grade Math Meet ‘11.
Configuring ALSMS Remote Navigation
Error Handling – the Debug and Trace Classes
Welcome.
Key Terms By: Kelly, Jackson, & Merle
ASSIGNMENT NO.-2.
Multiply a Teens Number
Tips Need to Consider When Organizing a College Event
…….. PackML concept illustration Line Controller Unit #1 Unit #2
Communication & Control
AP/AR/GL Feed Setup Process
סדר דין פלילי – חקיקה ומהות ההליך הפלילי
ماجستير إدارة المعارض من بريطانيا
NETMOD IETF 103 Bangkok Nov , 2018
AP/AR/GL Feed Setup Process
Tomasulo Algorithm Example
Lesson 05: Iterations Today is FRIDAY! It's A Programming Day!
مديريت موثر جلسات Running a Meeting that Works

TER New User Setup Instructions for Medical Certifiers
服务外包概论 Basics of Service Outsourcing
Siebel 1C Part Order Requests.
VCC Hardware Production Status
You must show all steps of your working out.
Question 1.
Missing digits game.
G. Steinbrück STT meeting
State-Transition Diagrams

Presentation transcript:

Idle Setup Run Startup Process Wait Event Event Wait Answer Send Config Idle Ready Setup Run Startup Start Wait Event Process Event Filled Buffer End Wait Answer Worker Answer Send Answer Write Format L3 Data Ready for Event No Write Wait L2HWFW Formatted L2 SCL No L3 Buffer Manage Buffers L2 Busy Administrator States Assigned VBD Done Manage VME Monitor Data Collect Sent

Idle Setup Run Startup Process Wait Event Event Format L3 Data Wait Config Idle Ready Startup Start Wait Event Process Event Filled Buffer Write Format L3 Data No Write Ready for Event Wait Administrator Formatted Worker States