Keep away from “Line of Fire”

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
Always use the correct lifting equipment
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Always stay out of the line of fire
Never place yourself in line of fire
Ensure all safety covers and guards are secured and in place
Maintain 3 point contact when you climb Ladder
PDO Second Alert Date: Incident title: Fall from Height
PDO Incident First Alert - Galfar Engineering
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Always stay out of the line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
If in doubt – stop the job
Pay attention to your footing
Unsecured pup joint falling
PDO Second Alert Date: Incident: LTI What happened?
Always report Near Misses
Always use secondary retention
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
Check equipment prior to start the job
Always be vigilant while moving across well site location
Seek assistance of Banksman while reversing the vehicle
Always intervene an unsafe act
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
SHORTCUT ROAD DRIVING IS DANGEROUS
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Use hands-off where possible
Presentation transcript:

Keep away from “Line of Fire” PDO Second Alert Date: 13.08.2017 Incident title: LTI What happened? During fabrication of a shade, a rigger was fitting a sling around a beam for lifting when the beam became unbalanced causing it to fall over onto his left foot fracturing two of his toes. Your learning from this incident.. Always ensure the load is stable and free from any entanglement Encourage peers to intervene in unsafe actions Always comply with the ten point lifting check list Discuss line of fire in TRC sessions before start of job Keep away from “Line of Fire”

Management self audit Date: 13.08.2017 Incident: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below: Confirm the following: Do you always use the correct lifting method? Do you ensure that staff are trained to identify safe place during lifting operations? Do you ensure your permit holder identify and document the dynamic risk ? Do you ensure you are out of the “Line of fire”? Does the crew discuss about potential “line of fire” during TRIC sessions? Do all tool box talks include discussion on hazards identified for the task? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.