City Managers Neighborhood Impact Initiative Impact Initiative Acre & Pawtucketville.

Slides:



Advertisements
Similar presentations
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Advertisements

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows.
Public Works: Building Sustainable Communities
Project Background and Objectives
Titusville to Edgewater Bike Loop PD&E Study
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
City of Modesto FY Proposed Budget Community & Economic Development Proposed Budget Fiscal Year FY Proposed Budget.
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Tackling Sprawl and Transportation Issues Produced by Amanda Lawson Delaware Geographic Alliance – University of Delaware Funded by Space Grant.
Capital Improvement Program City of Warren, Ohio April 2012.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
City/University Projects Fund Calendar Year 2012 Budget Request.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Kären Haley Director, Office of Sustainability City of Indianapolis Great Lakes Regional Pollution Prevention Roundtable/ Region 7 Conference June 4, 2009.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
City of Salem Streets and Bridges 539 miles of paved streets 53 bridges 263 signalized intersections 195 school zone flashers 7,100 street lights 125,000.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
King Street Cycle Track Project Update Department of Transportation Services City & County of Honolulu.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
APWA Management & Public Administration Committee Creating Complete Streets to Accommodate All Users May 23, 2012.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
“So You Want a Grocery Store...” Florida Redevelopment Association 2011 Annual Conference Don Paight Fort Myers CRA Executive Director.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
The Main Street Bike Lane Project LADOT Bike Program.
Xiaoyue (Cathy) Liu Wenjuan Zhao Barrett Taylor Department of Civil & Environmental Engineering University of Washington.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Ocean Springs. Hazard Mitigation Plan Comprehensive Plan Zoning Floodplain Management Building Codes Land Acquisition Front Beach Master Plan Tree and.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
Rock Creek East II Livability Study
Sheldon (Maple to Library) Preferred Design Meeting
PROPOSED DISCOUNT TIRE 10 GARDEN STREET PALM COAST, FL
Cycling infrastructure spending 2017
Tackling Sprawl and Transportation Issues
Early Voting Starts Oct. 20 | Election Day Nov
COACT ODOT Update September 13, 2018.
City of Wilmington Bike Plan Update
State of Fredonia Address February 6, 2019
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Commissioners Presentation
New Urbanism Concepts for Community Redevelopment Nicholas Zaferatos
Presentation transcript:

City Managers Neighborhood Impact Initiative Impact Initiative Acre & Pawtucketville

Public Meeting September 15, 2012 Introduction: City Managers Neighborhood Initiative for the Acre/Pawtucketville Infrastructure Improvements General Improvements Grant Programs Code Enforcement Safety Discussion

City Managers Neighborhood Initiative - Acre & Pawtucketville MAP

Acre & Pawtucketville

Infrastructure Improvements New University Ave Bridge is under construction. Upgrade the two signals at University Avenue & Riverside Street, and Pawtucket Street at School Street. These will be constructed next year. Bike lane and sharrows have been installed on Merrimack Street, Pawtucket Street and Fletcher Street. Father Morissette is still planned for a bike lane, but funding is not available yet. The sharrows mean share the road. Bikes can use the full lane on any road, not just the ones with sharrow markings. Bike lanes mean cars can not use that section of the road, but bikes can still use any part of the road. We will be doing an educational effort on the bike lanes and sharrows soon.

Infrastructure Improvements

New landscaped public spaces will be created as part of the Bridge project. The old bridge stub will become an overlook, and the corner of Salem and Pawtucket will be expanded with new curb, pavement, plantings, and trees.

Park Improvements Parks & Public Space Bourgeois Park- existing conditions Bourgeois Park- Proposed Improvements

Parks & Public Space Bourgeois Park- Proposed Improvements Park Improvements

Rain garden Improvements at North Common Park Improvements Lights at Amphitheater

Fels Park Park Improvements

Parking Areas Proposed landscaping- Public parking lot at University Ave and Gershom Ave Public Space Improvements

Street Trees Banners Enhancing Additional Greenspace

Sign & Façade Improvement Program Before After

Best Retail Practices Program Van Gogh's Gear Before After

Neighborhood Innovation Grant Program $2,000 Mini-Grants for Collaborative, Community-Driven Projects Community Gardens on Vacant Lots Free Public Wifi Vermi-Composting Workshops

Code Enforcement

Safety

Discussion