Pavement Rehabilitation Method

Slides:



Advertisements
Similar presentations
Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
Advertisements

LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
Sub-Grade Preparation-Equipment Caterpillar Paving Products
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
Research | consulting | technology safety and efficiency in transport through knowledge TT1825 Mix design and field evaluation.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Project TX Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian - Imad Abdallah Project Duration September.
Full-Depth Reclamation with Cement Metropolitan Government Pavement Engineers Council.
Chemical Stabilization of Subgrades Section Engineers ’ Meeting Lake Cumberland State Resort Park March 5-7, 2013.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
NDDOT/LTAP Assistance Conference Mandan, North Dakota November 30, 2011.
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Long-Term Durability of Full-Depth Reclamation using Portland Cement
Full Depth Reclamation Current Practice Testing Variability Presented To: Canadian User Group for Asphalt Sunday, November 15, 2009 Delta Beausejour Hotel.
PRESENTATION TO 34 TH ANNUAL AIRPORTS CONFERENCE 3/02/11 By: Casimir J. Bognacki, PE, FACI Chief of Materials Engineering.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Inverted Pavements Project: CSSTP (292)01 Troup County “South LaGrange Loop” Georgia Construction Aggregates Associations 2009 Management Workshops.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
An Introduction To Chemical Soil Stabilization Presented by: Marco Silvestre, P.EGary Dukewits.
Chemically Treated Subgrade Stabilization. ODOT Geo/Hydro/HazMat Conference Chemically Treated Subgrade Stabilization ODOT Pavement Services Rene’ A.
Proctor Compaction Test for Maximum Dry Density
An – Najah National University Faculty of Engineering Civil Engineering Department.
ENCI 5791 Compaction In-situ soils used as: –Bases for the construction of highway pavements –embankments or leveling material for construction projects.
Soil Stabilization By: Monica Acosta.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Caltrans Specifications - Changes and Implementation Scott Dmytrow Telfer Oil Telfer Highway Technologies.
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Campbell & Paris Engineers, 35.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Sustainability Specifications and Implementation February 26, 2015 Affan Habib, P.E. Pavement Program Manager.
Quality Control Testing
Pavement Maintenance II
Eng. Malek Abuwarda Lecture 11 P1P1 Construction Methods Lecture 11 Compaction Equipment and Procedures.
October 9, 2008 Spokane, Washington Fundamentals of Design and Construction of Full-Depth Reclamation Pavements The Washington State County Road Administration.
Pavement Distresses Flexible Pavement
Field Compaction Equipment and Procedures
Performance of Pervious Concrete Pavements Marty Wanielista, Manoj Chopra, Matt Offenberg Joshua Spence and Craig Ballock Stormwater Management Academy.
Excavation Below Subgrade (EBS)
Developing a Mixture-Based Specification for Flexible Base.
Field Compaction Equipment and Procedures
Road Engineering Todays lecture Introduction Pavement design Project - Road 34.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.
 The objective of this task is to develop a mix design procedure for the various types of FDR  Determine what works and what does not work  Each.
HIGH TIRE PRESSURE AND TEMPERATURE EFFECTS ON HOT MIX ASPHALT CONCRETE PERMANENT DEFORMATION USING CUSTOMIZED ASPHALT PAVEMENT ANALYZER April 22, 2010.
Problem No. 5 Problem No. 5 p.38 A 100’ 1000’ FILL ROADWAY 1.0’ Dry clay fill 100% density Use table p minutes for calculation Volume to be trucked.
Civil Engineering Department College of Engineering Course: Soil and Rock Mechanics (CE 260) Lecturer: Dr. Frederick Owusu-Nimo.
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
Soil cement   1 1.
Full Depth Reclamation
Highway Network System
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Marshall & Superpave Mix Design
Introduction Old asphalt pavements Increase demand in landfill areas and landfill costs Landfill areas.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Geotechnical Investigation
Design and Control of Concrete Mixtures CHAPTER 2
Barriers to Implementation of In-Place Recycling
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
2018 Pavement Workshop May 23-24, 2018
Deterioration and Failure Mechanisms
Concrete Pavement Analyst 1 ADTT / 2.25 SN
Pavement Structural Analysis
Pavement Structural Analysis
Louisiana Accelerated Pavement Research Facility
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Pavement Rehabilitation Method Full-Depth Reclamation Pavement Rehabilitation Method existing asphalt, CABC and a pre-determined depth of the subgrade soils are uniformly pulverized and blended Chemical additive (cement) and water are added, material is mixed and compacted “Reclaimed” material acts as a new base material for the placement of a new asphalt course

Full-Depth Reclamation Referenced by NCDOT Section 541 Flexible Pavement Reclamation Using Portland Cement - on NCDOT Geotechnical Engineering Unit website www.ncdot.org/doh/preconstruct/highway/ geotech/supportserv/geopavement/ Then choose “FDRwithcement.pdf”

Recently Performed for 2 S&ME Projects Full-Depth Reclamation Recently Performed for 2 S&ME Projects Trinity Industrial Park Roadways (documented with photos herein) Forsyth Technical Community College Greene Hall Parking Lot

Trinity Industrial Park Roadway Prior to Improvement – Subjected to Relatively Heavy Truck Traffic Volume

Full-Depth Reclamation Asphalt pavement had moderate to severe distress with cracking, potholes, and rutting 14 cores encountered 1.25“ to 3.25“ asphalt and 2.25” to 9.75” of aggregate base course Borings encountered variably compacted, high plasticity clay fill to depths of 2 to 4.5 feet Trinity Industrial Park Roadway Prior to Improvement – Subjected to Relatively Heavy Truck Traffic Volume

Trinity Industrial Park Roadways Full-Depth Reclamation Trinity Industrial Park Roadways Obtained bulk sample of asphalt, base course, soils and performed LABORATORY MIX DESIGN Mix design for cement contents of 3%, 6% and 9% by weight Performed standard Proctor test for each cement content Compressive strength specimen were molded at each cement content – compressive strength testing performed A target compressive strength between 300 and 400 psi is recommended by research and industry literature for the reclaimed materials Laboratory test results indicated a compressive strength of 350 psi for approx. 6.5% cement by weight

Trinity Industrial Park Roadways Full-Depth Reclamation Trinity Industrial Park Roadways New pavement section – 4 inches asphalt / 12 inches of reclaimed material was recommended as option to conventional remove/replace Full-Depth Reclamation was bid as well as conventional remove/replace pavement construction Full-Depth Reclamation was lowest cost

Cement placed on existing asphalt Trinity Industrial Park Roadways

Materials Pulverized & Mixed - 12 inches deep Trinity Industrial Park Roadways

Trinity Industrial Park Roadways After Dry Mixing Trinity Industrial Park Roadways

Adding Water & Mixing Again Trinity Industrial Park Roadways

Adding Water & Mixing Again Trinity Industrial Park Roadways

Trinity Industrial Park Roadways Reclaimed material was compacted and then proofrolled prior to placement of new asphalt Reclaimed material was stable during proofroll evaluation No undercutting was necessary prior to, during, or after FDR was performed Trinity Industrial Park Roadways

Trinity Industrial Park Roadways

Trinity Industrial Park Roadways