Project Nexus Workgroup

Slides:



Advertisements
Similar presentations
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
PN UNC Workgroup Settlement topic 4 th October 2011.
PN UNC Workgroup Read Validation 4 th October 2011.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
PN UNC Workgroup Settlement Issues 1 st November 2011.
DM Elective Transfer Scenarios 29 January Principles  Incoming Shipper or Read Provider responsible for obtaining read at Start of GFD – i.e.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Exit Capacity Release Methodology Statement
Review of Demand Estimation Times for Modification Proposal 461
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Project Nexus Workgroup (Settlement)
PN UNC Workgroup Invoicing 4th October 2011.
Meter Status Table Providing timely opening reads is an obligation to the confirming shippers. However where the confirming shipper fails to meet this.
PAF Risk Register and PARR mapping
DM Elective Transfer Scenarios 26 February 2009
PN UNC Workgroup iGT Services
Assignment Workshop 2 16th September 09, Solihull.
Project Nexus Workgroup
Project Nexus Workgroup
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
UNC Modification 0531 Provision of Industry Testing System
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
0630R Review Group meeting 21 February 2018 Settlement Data topic
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
Project Nexus Workgroup
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
PN UNC Workgroup Settlement Overview
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PN UNC AMR Topic Workgroup
Non Functional Topic 6th December 2011
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Generic Revenue Driver Methodology
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
PN UNC Workgroup iGT Services
Project Nexus Workgroup
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
UNC Modification Performance Assurance Framework Incentive Regime
Project Nexus Workgroup
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Invoicing Proposals 20th May 2013
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Nexus Workgroup Read Validation Scenarios
Project Nexus Workgroup
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
0688 Workgroup Xoserve Actions
Presentation transcript:

Project Nexus Workgroup Settlement Issues 3rd July 2012 21/05/2019

Introduction Xoserve is developing internal requirements based on the BRDs developed at PN UNC. During the internal workshops issues / questions / clarifications are raised These need to be discussed and conclusion agreed by PN UNC The transfer read issues discussed in the slides were originally raised at May PN UNC Worgroup requested time to consider the option proposed

Shipper Transfers Settlement BRD requirements for the Shipper transfer process & transfer reading have been reviewed Couple of issues around the transfer read have been identified; If transferring from Product 2 to 4 a read is required by GFD+5 to close out the period for the Outgoing Shipper Outgoing Shipper can submit reads for their period of ownership upto GFD+5 for Products 1 & 2 and upto 25/40 days for Products 3 & 4. What if the reads submitted do not align with the transfer read?

Transfer Read Principles These principles are a clarification of those detailed in the Settlement BRD; Incoming Shippers responsibility to load the transfer read Xoserve will generate an estimated read if not submitted within the transfer read window Shipper can replace the estimated read within the transfer read window SAR process to continue for challenges outside the window ‘Cyclic’ (normal) reads will not be accepted until the transfer read has loaded (applies to Products 3 & 4 only) The prevailing Product type estimation methodology will be applied (e.g. Product 2 to 4: D-7 estimate) Key proposal: Where there is a transfer to or from Product 1 or 2 a transfer read must be submitted by GFD+5.

Proposal for submission of the Transfer Read