Rack Placement Chopper Workshop

Slides:



Advertisements
Similar presentations
P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
Advertisements

F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
EPFL, Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch.
Measuring Motion Chapter 10.1.
Position and Motion Section 1.1.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Operational and Technical Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
TEMPLE CHANDELIER HOIST SUPPORT SYSTEM BYU Capstone Nick Barnwell, Andrew Marshall, Matt Steward April 15, 2014.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
NMX Instrument Layout and End-station Giuseppe Aprigliano Lead Instrument Engineer NMX IKON 7 September 15 th, 2014.
The notes about length of HV cables for the aerogel detector Page 1 A.Litvinenko.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
1 Building Design Progress Dan Wilcox March 2012.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Teleconf ACS – FREIA 28th March 2017
CBETA Technical Review
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
E4 hall technical specifications
Principles of a Grid Reference
Rail Profiles.
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Cooling pipes and Space for Services
Integration issues at IHEP
Principles of a Grid Reference
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Chapter 5 Section 1 Motion.
Question & Suggestions March 17th
TEC Services Status 30/12/2018 Nick Lumb.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Operations, Risks & Hazards
Secondary Spectrometer, Motion Control, Infrastructure
1-2 Grounding Principles and CF Infrastructure in Instruments Halls
Roof design Bunker Project CDR
Roof PSS Bunker Project CDR
MET Session workshop Job description Integration Engineer
Senad Kudumovic Design engineer
Imaging & Engineering STAP Meeting 12th-13th of April 2018
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
NSS integrated installation plan workshop Introduction
Bunker Project Operation aspects
BEER cave design and shielding
Target Safety System Interfaces
Position and speed as a function of time
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Rack Placement Chopper Workshop Gabor Laszlo NSS Lead Instrument Engineer www.europeanspallationsource.se 14.02.2019

Rack properties (PSS Rack Size : 1000mmx600mm) Power distribution: 1200mmx800mm (?) Motion Control Rack Size: 800mmx600mm (?) Detector (beam monitor) Rack Size: 800mmx600mm (?) Chopper Rack Size: 800mmx800mm Turbo Pump: 800mmx800mm Backing Pump:? Cooling Skid: 1000mmx1000mm (Access to PSS Rack : 1000mm both sides) Access to Power distribution Rack : 600mm both sides (?) Access to Motion Control Rack: 800mm front side(?) Access to Detector Rack: 800mm front side(?) Access to Chopper Rack: 800mm both sides Minimum path width for traffic: 900mm

Constrains Constrains on rack placement: Cable length limitations (?) Floorspace Distance from sensitive components Blocking of trafic routes including cranes The cabinets should be outide of the shielding (If the racks are on the top of the shielding, we need safety features (rails, stairs). If the shielding has to be removed, we shall avoid the re-connection of all the cables.)

West Sector From: Markus Olsson

West Sector

West Sector

South Sector

South Sector

East Sector

North Sector

Thank you!