SDD status E17 meeting 27/Aug./2009.

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
HLab meeting 10/14/08 K. Shirotori. Contents SksMinus status –SKS magnet trouble –Magnetic field study.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
8 th Aug 2009 ANL User Workshop Towards Nuclear Spectroscopy using a Position Sensitive Avalanche Photo Diode S. Lakshmi University of Massachusetts Lowell.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
A. Zoccoli - PRC open session 16-May-2002 HERA-B A. Zoccoli Università and INFN - Bologna PRC open session 16 th May 2002.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Recent progress in ultra-low noise, ultra-low background detectors V. Marian, M.O. Lampert, B. Pirard, P. Quirin CANBERRA France (Lingolsheim) Workshop.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
 A) Pulse Height Spectroscopy  Identify the equipment such as detector, electronics modules and NIM.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
New Development of Silicon Drift Detectors for the SIDDHARTA-2 experiment upgrade Carlo Fiorini, Riccardo Quaglia Politecnico di Milano, Dipartimento di.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Status of ULE-HPGe Experiment for WIMP Search in YangYang
Wireless Power Interface
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
RPC – status / results Blanco On behalf of HADES RPC Group
LKr status R. Fantechi.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
AIDA design review 12 May 2008 Davide Braga Steve Thomas
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Detectors and Preamplifiers
AGATA Detector Work Performed at Saclay in lessons learned -
Prototype activities update
Advances studies in the low-energy QCD in the strangeness sector
Barrel RPC Conditions Database
swingo XP Firmware, Service Tool & Error Codes
ScECAL+AHCAL+TCMT Combined Beam FNAL
Status of n-XYTER read-out chain at GSI
Latency measurements on the ALBA Electron units
RPC Detector Control System
BESIII EMC electronics
FFT analysis Goal : Energy calibration ( systematic error estimation)
ASIC Electronics development for CDEX PCGe detector
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
MPPC for T2K Fine-Grained Detector
B. Genolini for the IPNO detector dept.
MEG II実験 液体キセノン検出器の建設状況
PID meeting Mechanical implementation Electronics architecture
Xbar Chart By Farrokh Alemi Ph.D
RPC Detector Control System
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Presentation transcript:

SDD status E17 meeting 27/Aug./2009

New SDDs from SMI SDD w/ housing Mounted onto cooling finger 4 SDDs and 2 housing SDDs in KEK (5 in total) SDD ID preamp voltage remarks Brought to Japan in May 0 ±24 V 1 ~ 4 ±12 V Brought to Japan in July

Start R&D with test cryostat Installation into the test cryostat Cooling finger SDD housing Side view view from Mylar window Start measurement setting preamp outside of vacuum chamber

Start R&D with test cryostat Measurement setting preamp outside of vacuum chamber combination : SDD #1 and preamp #1 200 V @ HV supply SDD #0 setting Vth of trig. Vsub = -6.5V/ Vreset=1.0V/ T=140 K/ R1/RX/Back = -20.2/-130.2/-59.1 V (HVs = -200 V @ HV supply) Spectrum with low threshold  All events below threshold  Trigger rate < ~1 Hz Increase HV as a trial Mn Ka, Kb 205 V @ HV supply R1/RX/Back = -20.6/-133.2/-60.4 V (HVs = -205 V @ HV supply)  Trigger rate ~40 Hz Normal value  check HV dependence

Back voltage dependence Thousing = 140 K Back VS Resolution Ring 1 = -20 V Ring X = -130 V For -60 V, 211 eV Change Back V -60/-65/-70/-80 V original setting (-59.1V) New setting large dependence Set to be -70 V (original value is ~-60 V) More precise measurement : show later

Ring 1 voltage dependence Thousing = 140 K Ring 1 VS Resolution Ring X = -130 V Back = -70 V (Too noisy :V=-30V) Change Ring1 V ±10 V (5V step) original setting No dependence (or negligible dependence) New setting Set to be -20 V (original value)

Ring X voltage dependence Thousing = 140 K HV setting Ring1 = -20 V Back = -70 V Ring X VS Resolution Change Ring X voltage ±20 V (10 V step) original setting New setting No dependence Set to be -130 V (original value)

Spectrum with new SDD (#1) HV setting Ring 1 = ‐20 V Ring X = ‐130 V Back = ‐70 V Preamp setting Vsub = ‐ 6.5 V Vreset = 1.0 V SDD temperature Thousing = 140 K Resolution ~ 140 eV Check other dependence (V sub, SDD temperature)

V substrate dependence Thousing = 140 K HV setting Vsub X VS Resolution Ring1 = -20 V Ring X = -130 V Back = -70 V lower limit Cannot lower below –7.5V original setting (same situation w/ SDD 0) New setting Resolution is stable against Vsubstrate Set to be –6.5 V (original value) Tendency looks same with previous one

Temperature dependence setting Housing temperature VS Resolution Ring1 = -20 V Ring X = -130 V Back = -70 V Vsub = -6.5 V Stable > ~ 120 K Same tendency with previous one Optimum is around 130 ~ 150 K ( minimum effect to the target)

Switch to another SDD (#4) SDD # 1  #4 (the other one in the same housing) with same preamplifier (preamp #1) HV setting Ring 1 -20 V Ring X -130 V Back -70 V SDD temperature Counts Housing : 140 K Preamp setting V sub : -6.5 V V reset : 1 V Settings are same with SDD #1 Resolution ~ 140 eV Channel

VBACK dependence (SDD #4) To check whether VBACK dependence is peculiar for SDD #1 Back voltage VS Resolution spectrum shape VS VBACK -70 V R1/RX = -20/-130 V T= ~140 K -59.5 V Vsub = -6.5V -65 V -60 V -59.75 V -59.75 V -60 V -59.5 V -59.25 V Tendency is same with SDD #1 Channel Setting V = -70 V is OK

Ring 1/ Ring X dependence (SDD #4) Check Ring 1 and Ring X dependence (for confirmation) ±5 V for Ring 1 / ±10 V for Ring X Ring 1 VS Resolution Ring X VS Resolution No dependence (as same with SDD 1) -20/-130/-70 V (Same setting with SDD 1) looks fine

Check other 2 SDDs (SDD #2 and #3) Check w/ same preamplifier (preamp #1) HV : R1/RX/BK = -20/-130/-70 V, Vsub = -6.5 V Temperature = 140 K 2nd housing (SDD 2 & 3) SDD2 SDD3 FWHM =145.2 eV FWHM =142.5 eV Counts Counts Channel Channel All 4 SDDs are working w/ FWHM < 150 eV

Problem preamp #4 To switch to preamp #4 …. Cannot increase V reset value (typically ~+1 V) by potentiometer  ~0V +9 V line for mini reset-out board  -0.9V +9V for reset out Reset Replacing preamp with #2 works preamp #4 maybe broken. (+12 V line is suspect) +12 V input Reset out board For preamp #2 & #3, Vsub and Vreset are correctly supplied. to be tested with SDD

Summary for new SDD R&D @ test bench Checked SDD HV dependence high BACK voltage (>-60V) deform spectrum stable for R1 and RX Checked SDD Vsub and temperature dependence Almost same tendency with previous (SDD #0) Checked 4 SDDs (test bench / preamp (#1) outside) All SDDs are healthy (FWHM < 150 eV) One preamp (#4) is strange (maybe broken at +12V line) Possible to repair? (send back to SMI?) If we have only 8, need backup preamp (4?, 8?)