WP16 Water cooling systems

Slides:



Advertisements
Similar presentations
Orthogonal Projection
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Pipe Supports and Hangers
The Scope: Relocation of offices from Adrian to Ann Arbor, MI 3 Floors 450 Answer workstations, 9 EE6 Executive Offices The Challenges: Highly competitive.
2/27/2013DSA - PROJECT CERTIFICATION1 STREAMLINING PROJECT CERTIFICATION CHANGING CULTURE AND CHANGING PROCESSES DSA: CHANGING CULTURE & CHANGING PROCESSES.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
James Moir Senior Lawyer JS Mueller & Co
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
1 1. Some recent views ( ) 2 Linac tunnel
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Sign Structures Updates: Helpful Tips for Inspectors
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Sprinkler Loads on Trusses
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS Grounding System Concept Fundamentals and Requirements
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
Overview of the ESS Linac Cryogenic Distribution System
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
InstalSystem 5.
WP High Beta Cavities Delivery
Final team building Presentation
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Front End Test Stand (F.E.T.S.)
LBNF CAD models, Drawings and Component list
NZS 4219:2009 Seismic Performance of Engineering Systems in Buildings
Update of MVD services and requests
Technical Scope of Work
Test box for ProtoDUNE SP – Integration Test
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Technical Scope of Work
Chemical Engineering Explained
Andreas Jansson, Lali Tchelidze
Fusion 360 Pac Man Tutorial
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Perspective.
Jaroslaw Fydrych SHC Lead Engineer
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
RF Distribution for Warm Linac
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
Bunker Wall Design Wall
FIVE PROJECT PHASES.
Bunker Wall Design Wall ESS
Bunker Project Schedule/Budget
High Level Readiness Reviews
RF introduction Anders Sunesson RF group leader
Acc Collaboration board Trieste
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

WP16 Water cooling systems Tender scope overview of LOT 1 Piping installation & design of pipe supports WP16 Water cooling systems www.europeanspallationsource.se February 27, 2017

Tender Scope of LOT1 Intention of this document is to use it with the 3D model XML file distributed along with the tender and Isometric drawings for increased understanding of the Tender scope of Lot 1. Front End Building (FEB) and the Accelerator Tunnel (G01) tender scope LOT1 limits. Any information presented in the 3D XML model file is for info only and intended to increase the overall understanding. Detail engineering on mainly some of the pipe supports is still ongoing while tendering. The Navisworks file used for the making of some of the screenshots in this document is a subject of regular updates, screenshots may therefore appear outdated at a direct comparison to the 3D XML model file. The 3D XML file in tender version should reflect the actual isometric drawings. Accelerator tunnel Level 90 HVAC room Level 100 FEB Level 100 FEB Level 90

Tender Scope of LOT1 Front End Building (FEB) and the Accelerator Tunnel (G01) tender scope LOT1 building sections overview. FEB Level 100 HVAC room Level 100 FEB Level 90 Accelerator tunnel Level 90 Accelerator tunnel Level 90 Dogleg section

Scope of LOT1 The Accelerator Tunnel (G01) LOT1 scope limit at the dogleg section Main piping limit of CWS02 ESS.ACC.E02.E02.WP0002 ESS.ACC.E02.E02.WP0004 LOT 1 limit at flanges

Scope of LOT1 CWS01 skid delimiter CWS02 skid delimiter Piping to and from the cooling skids in the FEB level 100 for the CWS01 /ESS.ACC.E02.E01, CWS02 /ESS.ACC.E02.E02, CWS03 (RFQ) /ESS.ACC.E02.E03 CWS04 (DTL) /ESS.ACC.E02.E04 Current Pipe supports for FEB level 100 are conceptual only. CWS02 skid delimiter ESS.ACC.E02.E02 CWS01 skid delimiter ESS.ACC.E02.E01 DTL Skid delimiter ESS.ACC.E02.E04 RFQ skid delimiter ESS.ACC.E02.E04

Scope of LOT1 LOT 1 limit to/from external piping in FEB level 100, system limit for ESS.ACC.E02. Lot1 External Delimiter to/from ESS.ACC.E02

Scope of LOT1 Piping overview to and from the cooling skids of the CWS01 -ESS.ACC.E02.E01, CWS02 -ESS.ACC.E02.E02, CWS03 -ESS.ACC.E02.E03), and CWS04 -ESS.ACC.E02.E04. ESS.ACC.E02.WP0001-WP005 ESS.ACC.E02.E02.WP0001 ESS.ACC.E02.E02.WP0003 ESS.ACC.E02.E04.WP0001-WP0010 Piping to/from ESS.ACC.E02.E01.xx ESS.ACC.E02.E03.xx

Scope of LOT1 Piping overview to and from the cooling skids of the CWS01 -ESS.ACC.E02.E01, CWS02 -ESS.ACC.E02.E02, CWS03 -ESS.ACC.E02.E03), and CWS04 -ESS.ACC.E02.E04. ESS.ACC.E02.E02.WP0001 ESS.ACC.E02.E02.WP0003 Piping to/from ESS.ACC.E02.E01.xx ESS.ACC.E02.E03.xx LOT 1 limit ESS.ACC.E02.E04.WP0001-WP0010

Pipe supports contractors scope WP16 Water cooling systems www.europeanspallationsource.se February 27, 2017

Scope of LOT1 Screen dumps presenting Front End Building (FEB) and the Accelerator Tunnel (G01) LOT1 pipe support scope limits Any information is presented for info only. Engineering is partly ongoing and finalized only after final piping and pipe support structural analyze report is completed by ESS at CDR. Pipe support design engineering scope of contractor is to model and draught the design on drawings with included BOM according to ESS directions. See pipe support list for known pipe supports. Type 1, Type 2 and Type 3 pipe supports expected to be as is except for minor modifications. Also included for contractor is to design, costumize and model any by ESS additionaly required pipe supports necessary and any modifications to the presented supports. This includes two pipe support pillars in the HVAC room level 100 and three pipe support plate designs on wall and floor penetrations. Important pre-condition on design of any pipe support in the accelerator tunnel G01 is that no drilling or anchoring is allowed on wall and ceiling. Precasted, every 3m, Hilti HAC-41 channels to be used instead of drilling.

Scope of LOT1 Firewall entry from HVAC room to FEB at level 100. Pipe supports on building pillars to be designed, preferably by Hilti system parts alt Stauff. Bolting instead of welding preferred to pillars. Pillars are Firewall painted. If welding is deemed required then any painting affected by welding on building pillars are to be refurbished according to firewall painting requirements. Pipe supports from roof trusses to be designed preferably by Hilti system parts. Customized bracket for Hilti MI system parts with correct angle towards roof trusses can be made available for purchase from Hilti, estimated lead time 5 weeks.

Scope of LOT1 Red sketched lines; pipe supports to be designed at HVAC room FEB level 100 by contractor in agreement with ESS. Any painting affected by welding on the building pillars are to be refurbished according to firewall painting requirements. Blue hatched area on wall is a firewall entry area for piping and an ESS scope. Blue area on floor is pipe support including firewall entry to FEB level 90. Firewall details are an ESS scope, pipe support to be designed and draughted by contractor in agreement with ESS. Current conceptual design is a 30mm plate with holes and a clamp or similar on the pipes. Stop brackets welded on pipes might show required. Firewall solution must be taken into account for the final design. Firewall solution is ESS scope but ongoing engineering at time of tender.

Scope of LOT1 Pipe supports to be designed Piping to and from the cooling skids of the CWS01, CWS02, CWS03 and CWS04 in the Front End Building (FEB) level 90 beneath the HVAC room. Only pipe support details and installation is scope of contractor. Firewall and Radiological wall engineering details and installation is ESS scope of work. Pipe support designs for penetrations and in the FEB level 90 and the tunnel side of FEB Level 90 to be made in agreement with ESS. See 3D XML model for updated piping of this area. Pipe supports to be designed Pipe support at Firewall EI60 & radiological wall Pipe support at firewall EI60 & radiological wall Pipe supports to be designed DTL manifolds MEBT section RFQ section LEBT &Ion section

Scope of LOT1 Vertical piping through (Firewall EI60) floor through HVAC room from/to FEB level 90 room to be final modeled and draughted by contractor in agreement with ESS. Firewall installation is not part of contractors scope.

Scope of LOT1 Any required horizontal piping supports at FEB level 90 to be modeled and draughted by contractor in agreement with ESS.

Scope of LOT1 Horizontal piping supports through Radiological walls through to the Accelerator tunnel to be final modeled and draughted by contractor in agreement with ESS.

Scope of LOT1 Any required Pipe supports at Accelerator Tunnel level 90 system for piping to be designed and draughted by contractor in agreement with ESS. See 3D XML file for updated piping of this area.

Scope of LOT1 Typical support for the DTL manifolds, (5 sections of green coloured manifold pipes) Basic design is made of 3 Hilti pillars each on a total of five DTL tanks. Support to be designed and draughted by contractor in agreement with ESS. DTL Manifolds will not be present, only ESS.ACC.E02.E01.WP0005 and ESS.ACC.E02.E01.WP0006 to be supported at this stage. See 3D XML file for updated piping showing flange connections at this area.

Scope of LOT1 Typical pipe support for the CWS02 beige colored pipes, and CWS04 (DTL) grey coloured pipes. TYPE 1 support consists of Hilti system details.

Scope of LOT1 Typical pipe support design of the Magnet piping DN150 and DN100. See support list for TYPE1. Design made of Hilti system details. NB! Hilti system rails available each 3 meter on ceiling and wall throughout the accelerator tunnel. Bolting/anchoring to the building not allowed except on floor. Bolt type and positions if required at all on the floor to be approved by ESS.

Scope of LOT1 Compensators and typical support structure for the Magnet main pipings. See Support list for TYPE 2. Design of support consists of Hilti system parts.

Scope of LOT1 Typical fix support structure for the Magnet main pipings, design of Hilti system details. See support list for TYPE 3.