ACRP 07-09: Apron Planning and Design Guidebook

Slides:



Advertisements
Similar presentations
TRB SESSION 761--CURRENT RESEARCH IN AIRPORT TERMINALS AND GROUND ACCESS Common Use Facilities and Equipment at Airports (P )
Advertisements

Modeling Airport Capacity
Airport Planning and Design
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Weather Impacts to Columbia Metropolitan Airport Operations Doug Anderson – Ops 12
Introduction to TransportationSystems. PART III: TRAVELER TRANSPORTATION.
Airport considerations and airport solutions Session 5 Presentation 3.
Airport planning.
Airport Sustainability Planning Charlie McDermott, LEED AP Planning Department Manager C&S Companies.
Air Traffic Management
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
The airport operator’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 3.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Continuous Climb Operations (CCO) Saulo Da Silva
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Current Research in Airport Ground Transportation Prepared by Peter B. Mandle Jacobs Consultancy Prepared for Airport Ground Transportation Association.
SMS and Safety Risk Management in Airport Planning and Development Presented by Rusty Chapman, P.E. Delta Airport Consultants, Inc. March 3, 2011.
Air Transportation A Management Perspective
Aerodrome Certification Exercise The Process
Textbook Reviews By Aj.Weerawit Lertthaitrakul Logistics & Supply chain management Business Administration Air Transportation A Management Perspective.
The IMPACT of the DOT REGULATIONS as to TARMAC DELAYS on AIR CARRIERS AND AIRPORTS Katherine Staton Jackson Walker L.L.P.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Smith Reynolds Airport. 1. Purpose 2. Definitions 3. Vehicle Control Line 4. Vehicle Drive Lanes 5. Foreign Object Debris 6. Basic Rules for Driving in.
CHAPTER-10 AIRPORT PLANNING.
ICRAT 2004 IMPACT OF FUTURE GENERATION AIRCRAFT IN AIRPORT OPERATIVITY
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Working Paper One/ Study Committee Meeting May 2015.
Valkaria Airport Master Plan Update Public Information Meeting February 25, 2015 Viera Government Center.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Lecture 3: Air Traffic Control Tower
ICAO Requirements on Certification of Aerodromes Module - 2
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Airport Markings & Signs
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
Airport Noise Compatibility Study Group Navigation Committee AIRPORT NOISE COMPATIBILITY PROGRAM Louisville and Jefferson County FINDINGS AND RECOMMENDATIONS.
An Introduction to Transportation Systems
Scenario on airport works Session 5 Presentation 1.
LECTURE 4: ICAO CHART requirements
FUTURE OF AIRPORT MANAGEMENT 1. Though, we cannot predict precisely what airport management be in next 100 years, but it will evolve with changes in technologies,
Click to edit Master title style Click to edit Master text styles Second level TOOLBOX TALK MANAGING AIRSIDE SAFETY.
COLLABORATIVE DECISION MAKING
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
1© 2009 by Nelson Education Ltd.. 2 The Airline Industry Chapter 6.
Airport Groundside Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP Aviation Operational Measures for.
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
Sally Lyon and Staff August 26, OPERATING REVENUES AND OTHER INCOME BUDGET FY 2016.
Circulation, Control, Safety, and Security 12 chapter.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Airport In come and Expenses Forecast
Agenda ACRP Project What is NextGen?
Software Project Configuration Management
MGMT 203 Airports, Airspace, and Air Traffic Control Management
Continuous Climb Operations (CCO) Saulo Da Silva
Airport Planning.
Introduction To Vehicle Movement
Transportation and Traffic Engineering Ch 1 Introduction 10/10/2017
Draft Transportation Element September 6, 2017
Planning for a New Airport in Thessaloniki, Greece
Continuous Climb Operations (CCO) Saulo Da Silva
Current Research in Airport Ground Transportation
Pierre Regional Airport Master Plan Update
Non-Movement Area Training
Project/program update
Presentation transcript:

ACRP 07-09: Apron Planning and Design Guidebook  

ACRP 07-09: Apron Planning and Design Guidebook Research Team: Ricondo & Associates, Inc. Airport Development Group, Inc. Aviation Safety and Security Education Training, LLC Kimley-Horn and Associates, Inc. Two Hundred, Inc.

ACRP 07-09 Project Panel Jorge E. Panteli, McFarland-Johnson, Inc. (Chair) Mark B. Gibbs, City and County of Denver Stacy L. Jansen, PE, LEED, Burns & McDonnell Engineering Co. James McCluskie, Reno-Tahoe Airport Authority Kiran Merchant, Port Authority of New York and New Jersey Kenneth P. Stevens, University of Westminster Michael A Meyers, PE, FAA Liaison Stephen F. Maher, PE, TRB Liaison

Agenda Introduction and Research Purpose Planning and Design Process Understanding the Apron Apron and Planning Design Guidance

Introduction Aprons are among the most congested areas at an airport: Aircraft movements Passengers and cargo Ground service equipment Airline/supplier personnel CHALLENGE: Lack of comprehensive and complete guidance in a readily accessible form OPPORTUNITY: Consolidate guidance without presenting a prescriptive approach

Research Objectives Develop a guidebook to describe best practices for comprehensive apron planning and design that enhances operational efficiency and safety The Guidebook is intended to assist planners, designers, airport operators and other stakeholders in enhancing the operational efficiency, safety, and flexibility of aprons It does not relieve the user of the need to thoroughly understand the specific operating environment at the project area Provide a conduit to other apron planning and design information

Research Approach Conducted literature search to identify existing apron planning and design guidance Evaluated literature to identify limitations and enhancements of existing guidance and to inform site visits Performed apron observations at a variety of airports to explore best practices for planning and operating apron facilities + Observations & Research =

Guidebook Organization Chapter 1, Introduction Presents background on the research project. Chapter 2, Apron Planning and Design Process Describes the general apron planning and design process including stakeholder and agency involvement. Chapter 3, Understanding the Apron Environment Summarizes the different types of aprons, activities (aircraft, passengers, employees, vehicles) that occur in apron environments, and GSE used to support these activities. Chapter 4, Apron Planning and Design Provides detailed guidance on various apron planning considerations, design implications, and related regulations/guidance.

Apron Planning and Design Process Level of planning detail will influence which steps are completed Master planning requires conceptual planning Development program and design projects require very detailed planning

Stakeholder & Agency Involvement Stakeholder and agency involvement helps ensure the needs and requirements of these parties are considered throughout the planning process Provides broader perspective and informs planners and designers of relevant operational, environmental, and design factors Enhances support for an apron project Airport Tenants Air Quality Airport Management and Staff State Wildlife Third-party Service Providers Historical Agencies FAA Wastewater/Water Quality/Wetlands TSA U.S CBP Local Police and Fire

Understanding the Apron Environment Critical to responsive and effective planning and design It is the responsibility of the planner or designer to understand the physical and operational environment of the specific airport apron area before Engage stakeholders in understanding the environment The Guidebook provides information on the activities, vehicles, and equipment utilized on the different apron types: Terminal Deicing Cargo Maintenance Remote General Aviation Helipads

Planning Considerations Functional Apron Capacity Accommodate anticipated demand, irregular operations, new users or tenants, and/or future aviation demand Operational Efficiency A measure of how an apron supports day-to-day operations Minimize dependencies in operations, aircraft parking, taxi flows, aircraft servicing Flexibility Accommodate diverse fleets, changing operating characteristics, and irregular operations Plan aprons for multiple purposes (e.g., single apron for deicing, remote overnight parking, aircraft holding)

Planning Considerations Operational Factors Reflect unique characteristics of airport Consider types of operations (cargo, deicing, general aviation), aircraft turn times, fleets, lease types, airline operation (hubbing/origin-destination, international/domestic) Site Constraints Understand specific site constraints Consider both physical and operational (aircraft ground flows, aeronautical surfaces, clearance areas, tower line of sight, and environmental considerations)

Determining Apron Demand Methodology depends on type of apron project Defining apron requirements to support master planning is different from forecasting demand for reconfiguration of an existing apron. Sources Direction from airport operator, tenant or lessee Historical relationships FAA or national forecasts Aircraft fleet orders Planned developments/leases Based/itinerant aircraft Air service marketing

Fleet Evolution Changes in fleet may require changes to physical layout and operational needs Wingtip devices New large aircraft (A380, 747-8) Trend of increasing wingspans Equipment needs Increased ground power unit capacity Data / internet connections Phasing out of models or sizes of aircraft

Aircraft Clearances FAA provides guidance on nose-to-building clearances, but not on wingtip clearances in apron areas ICAO provides planning criteria for wingtip clearances Wingtip clearances usually determined by airport or apron lessee In some cases reduced horizontal wingtip clearance or vertical clearance may be allowed during a gate entry/exit maneuver Airport may set clearance standards on all aircraft parking positions or, at a minimum, between leaseholds Allow space for maneuvering of GSE and emergency vehicle access and servicing aircraft

Apron Markings Apron-related Airfield Marking Apron Markings Taxiways, taxilanes, holding positions, non-movement area boundaries, and roadways Standards established by FAA Apron Markings No guidance currently published by FAA Industry guidance is available and summarized in Guidebook Markings vary among airports and aprons, influenced by operation and size of apron Determined by airport operators and/or apron lessees

Apron Configuration Ensure that aprons comply with aeronautical surfaces and runway/taxiway areas Incorporation of pushback areas may reduce taxi congestion Vehicle service roads can be placed in front of (head-of-stand) or behind (tail stand) aircraft Ensure there is sufficient space for GSE storage and staging, either locally or remotely Aprons may need to be visible from ATCT or ramp towers

Technology/Planning Tools Computer-aided design (CAD) allows for analysis of different apron configurations Add-on programs allow for simulation of aircraft and vehicle movements and aircraft servicing Path tracking Jet blast velocity tracking Aircraft servicing layouts Passenger loading bridge analysis Pavement strength software FAARFIELD (FAA) assists with designing new and modifying airfield pavements

Design Implications Consider benefits of different pavement types Drainage: follow regulations and consider long-term expansion potentials Construction impacts: pavement replacement may require operational plans to route aircraft around construction and accommodate weather-related limitations Hydrant fueling systems: need to follow NFPA requirements and consider aircraft parking positions and loading bridge operational ranges Paint and reflective materials vary and selection should consider durability, weather conditions, and cost. Lighting should follow Illuminating Engineering Society guidelines.

Management/Operational Policies Airports use management and operational policies to enhance safety and manage the utilization of aprons. Examples: Lease stipulations requiring minimum utilization of aprons Require vehicle and aircraft parking and flow plans Varying lease types (exclusive, preferential, common use) Establishing wingtip clearances between parking positions or between leaseholds Enforce required aircraft parking apron for apron to building or lease area Deicing and fueling consortiums

Related Regulations/ Guidance/References FAA Advisory circulars and orders provide guidance SMS May become part of apron planning process as guidance matures Sustainability Initiatives can be incorporated that support airport operator goals VALE Program Provides funding for electrification projects to improve air quality Environmental Regulations NEPA process and state environmental planning requirements NFPA Published codes and standard to minimize the risk of fires in the apron environment ICAO As the FAA increases harmonization with ICAO guidance, it is anticipated to be increasingly reflected in apron facilities

Additional Information ACRP Report 96 Apron Planning and Design Guidebook http://onlinepubs.trb.org/onlinepubs/acrp/acrp_rpt_096.pdf