Interconnector trading in SEM 7th June 2007

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
European Developments: Capacity Transmission Workgroup 6th October 2011.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
France, UK, Ireland Regional Initiative Stakeholders Meeting 3 rd December 2008 A Mutual Energy Company Working for Consumers Paddy.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
SEM – One Year On Liam Ryan, Market Operations Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
INTRA-DAY TRADING Modification Development 5 April 2011.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Trades and Transfers Workshop, 6 th November 2007.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
European Developments Transmission Workgroup 3 rd May 2012.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
ERCOT CRR Update to CMWG
France, UK, Ireland Regional Initiative SONI Commercial Manager
EU Tariffs Code Update Based on Refined Draft as of 30th October
Capacity Conversion – 616s
Moyle & East West Access Rules Approval
EU Implementation Programme
Transmission Workstream, 2nd March 06
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
26th February 2015 Teleconference
TRAINING SESSION I EU Market Intervention
24th January 2017 Teleconference
Capacity Methodology Statements: Impact of Mod 452
TSC Modifications Panel Meeting
26th February 2015 Teleconference
TSC Modifications Panel Meeting
Approach to Market Cutover - Draft for Discussion
Exit Capacity Substitution and Revision
DSC ChMC CSS update 6th July 2018
Update on Exit Capacity Substitution and Revision
Transmission Planning Code Review
Modification 501 slides for Workgroup
Proposed Transitional Gas Exit Arrangements
Entry Capacity Transfer and Trade
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Ofgem presentation to Gas Transmission Workstream
Optimisation of Entry Capacity Modification Proposal
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
PRISMA General Information
Modification 0043 – Limitation on offering for sale unsold capacity
Review Group Action November 2008.
Presentation transcript:

Interconnector trading in SEM 7th June 2007 Auctions/ Capacity Trading Access arrangements process Moyle Interconnector Capacity Framework Agreement Access Arrangements Proposals Capacity products Auction timing & process Other Indicative Auction programme Paddy Larkin – MD Moyle Interconnector Interconnector trading in SEM 7th June 2007

Access Arrangements Process Condition 17 Moyle licence Requirement to establish and operate relevant access arrangements in relation to Moyle interconnector Periodically review the arrangements in consultation with affected parties Drivers for review Nature of market changes with SEM Limited flexibility to change within existing arrangements Alignment with EU congestion management guidelines Process Q1 07 - Discussions with potential post SEM i/c users April 07 - Preparation of consultation documentation in consultation with SONI and NIAUR 4th to 28th May 07 – Public consultation on MAA, MICFA, MIFD 4th June 07 Proposal sent to Ofreg for approval 11th June 07 – Expected NIAUR approval 11th June + – ITB sent out as auctions arise Late June – possible first auction of annual capacity Interconnector trading in SEM 7th June 2007

Moyle Interconnector Capacity Framework Agreement (MICFA) Document under which capacity is contracted and forms part of the Access Arrangements New Agreement must be signed by all potential users (and bidders) Propose that once approved final version will be sent to all on SONI circulation list for completion if desired New agreement starts at SEM go live – old agreement falls away then Documents work if SEM go live moves Modifications Principally to allow for introduction of SEM Definitions added and revised Eg IA, TSC, IUN, SEM Preconditions for use of capacity expanded Registration of an Interconnector Unit Provision of required information to Moyle/ TSO/ IA Still have to comply with system documents – a use of system agreement may be introduced and would be a system document Notice of capacity assignment to be copied to IA MIFD now a schedule to MICFA – was previously part of ISC Modifications deal with introduction of SEM and new licences to participate in transmission Interconnector trading in SEM 7th June 2007

Access arrangements – proposed to NIAUR Consultation on Arrangements complete Consultation responses have been considered Still to be approved by NIAUR so only proposals presented here Significant changes summary Limit any optional changes to process until stakeholders get over workload associated with introducing SEM. Import Available Transfer Capacity subject only to availability of the interconnector and the GB system – consequently 410MW available all year round (no summer profiling), additional 40MW available November to March – still stated at Achencrosh PPB contract coincidentally finishes by SEM go live and no other capacity contracted yet therefore full capacity available for sale from 1st November North South interconnector constraint removed and therefore no direct cost to users for its use Note: Proposed access arrangements and auctions relate to capacity under SEM. If SEM go live is delayed then sales are void during the delay and new auctions will be held. Interconnector trading in SEM 7th June 2007

Access Arrangements proposal – Capacity products Longer term (23 month & 35 month term) Difficult to price due to uncertainty of SEM, suspect will be undervalued but there is a desire to meet demand High risk of collapsing price if supply exceeds demand Explicit auctions favoured in consultation responses Propose explicit option but limited supply – only release more product if price similar to annual product Annual (match potential customer contract terms) Anticipated that customer contracts will align with all island tariff year (Oct – Sep) however this is not at all certain Propose 11 month product offered from Nov 07, bidders elect for 11 or 12 months with no impact on their bid ranking Some 12 month product offered from Apr 08 Monthly Standard and non standard products offered Weekly To be introduced subject to development of satisfactory administrative arrangements Moyle determine exact quantities within boundaries Interconnector trading in SEM 7th June 2007

Access Arrangements proposal – Auction Timing and process Exact schedule of auctions to be set by Moyle subject to certain boundaries In order to maximise interconnector use and capacity sales revenue Expect early auction of annual product to offer an alternative to directed contracts, main annual auction iterations in September, further auction for Apr-Mar product held circa Feb 08. Process Little change to auction process Registration for each auction no longer required ITB will be posted on website and sent to circulation list as usual Bidders need only submit their bid but must ensure they are eligible to bid Sealed envelope bid process continues Likely to change with weekly product introduction, not feasible to change before this Interconnector trading in SEM 7th June 2007

Access Arrangements proposal – Other Reserve Price £2010/MW/month for standard product (inflationary increase) Considered low given no NS interconnector cost and new profiled CPM payments for flows Moyle may at their discretion set a lower reserve Expect this will primarily be by adjustment of minimum volumes on the non standard product Post gate closure capacity Tidies up existing arrangements Subject to commercial agreement unused capacity reverts to SONI after market gate closure Commercial arrangements to be approved by NIAUR if appropriate 10MW/min ramp rate will continue to be applied Losses procedure and values remains unchanged Following auctions SONI will inform successful bidders as soon as practically possible Interconnector trading in SEM 7th June 2007

Auction Programme - indicative Interconnector trading in SEM 7th June 2007