Linac Coherent Light Source Project Update Budget Project Organization, Activities Far Hall
LCLS - Estimated Cost, Schedule $273M Total Estimated Cost $315M Total Project Cost FY2005 Long-lead purchases for injector, undulator FY2006 Construction begins FY2007 FEL Commissioning begins September 2008 Construction complete – operations begins XFEL Commissioning Title I Design Complete CD-0 CD-1 CD-2a CD-2b CD-3b FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 2002 2003 2004 2005 2006 FY2008 FY2009 Project Engineering Design Long-Lead Procurement Construction Operation CD-3a CD-4
LCLS - Estimated Cost, Schedule $315M Total Estimated Cost $379M Total Project Cost FY2005 Long-lead purchases for injector, undulator FY2006 Construction begins FY2008 FEL Commissioning begins March 2009 Construction complete – operations begins XFEL Commissioning Title I Design Complete CD-0 CD-1 CD-2a CD-2b CD-3a CD-3b FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 2002 2003 2004 2005 2006 FY2008 FY2009 Project Engineering Design Long-Lead Procurement Construction Operation CD-3a CD-4
FY2005 – Start Long-Lead Procurements Authorized FY2005 President’s Budget FY2006
LCLS Peoplepower / System / Lab Critical Slots: Laser Group Leader Physics Team Leader Electron Systems Photon Systems SLAC/ANL Liaison Engineer Procurement Lead FY05 is key ramp-up year
LCLS a Division of SLAC 8/2004 Linac Coherent Light Source Division Associate director J. Galayda Chief Engineer M. Reichanadter
Inside LCLS LLNL
Staffing Hires ES&H Coordinator - Done – M. Scharfenstein QA Coordinator – Interviews done Database managers – Interviews started laser group leader – Interviews done e-beam systems manager – Interviews done Accel Physics Group Lead – to be announced ANL Undulator Systems Chief Engineer – Done- G. Pile, ANL
1.4 Undulator Systems
Long-Lead Procurements, FY2005 - Undulator Systems Undulator Hardware Magnet Blocks Magnet Poles Awarded Strongback Awarded Undulator Measurement Lab design complete, bid package in preparation for room On track for complete delivery of undulators by June 2007
Straight Ahead Spectrometer LCLS Injector 10/2005 Shutdown RF Gun Load Lock L0-1 & L0-2 3-m SLAC Sections Gun Diagnostics Laser Heater Transverse RF Cavity DL1 Bend Straight Ahead Spectrometer
Undulator Magnet Measurement – Bldg 81 Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical
Long-Lead Procurements, FY2005 - Linac Selected Linac Systems X-band RF system – underway Klystron construction >50% Chicane Magnets vendor survey
Injector Building out for bid Laser bids in Gun in fabrication at SLAC Preparations for October shutdown vacuum connection to linac Elev -35’-0” Elev 0’-0” Sector 20 Laser Facility
1.5 X-ray Transport, Optics, and Diagnostics Layout FEH NEH Flipper Mirror FEE Tunnel Experiments: Atomic Physics Front End Enclosure Fast Close Valve Slits Attenuators Shielding Experiments Optics Structural Bio Nano-scale Femtochem FEL Measurements & Experiments: Low Power Imaging High Power Imaging Spectrometer Calorimeter FEH Optics: Pulse-Split-&-Delay Monochromator Experiments: Optics Warm Dense Matter
1.9 Conventional Facilities Title-II Kickoff 29-30 March 2005 Undulator Hall (175m) Beam Dump (40M) Front End (29m) X-ray Transport (250m) Far Expt. Hall Near Expt. Hall Linac-to-Undulator (227m) Far Expt. Hall 2nd Undulator Line 3rd Undulator Line Near Experiment Hall
1.9 Conventional Facilities Construction Manager Out for Bids Undulator Hall (175m) Beam Dump (40M) Front End (29m) X-ray Transport (250m) Far Expt. Hall Near Expt. Hall Linac-to-Undulator (227m) Central Lab Office Complex (CLOC) Capacity ~300 72,000 GSF Total 150-Seat Conference Room
Alternate Far Hall Layout 14.6m 10-meter hutch length
LCLS Facility Advisory Committee Membership Kem Robinson, Lawrence Berkeley National Laboratory (LBNL), Chair Harry Carter, Fermi National Accelerator Laboratory (FNAL) John Cleary, Stanford University (SU) John Corlett, Lawrence Berkeley National Laboratory (LBNL) Roger Falcone, UC Berkeley Josef Feldhaus, Deutsches Elektronen-Synchrotron (DESY) Paul Fouss, Argonne National Laboratory (ANL) Thomas Himel, Stanford Linear Accelerator Center (SLAC) Vim Leemans, Lawrence Berkeley National Laboratory (LBNL) Pat O'Shea, University of Maryland (UMD) Joachim Pflueger, Deutsches Elektronen-Synchrotron (DESY) Thomas Rabedeau, Stanford Linear Accelerator Center (SLAC) Jörg Rossbach, Deutsches Elektronen-Synchrotron (DESY) Keith Schuh, Fermi National Accelerator Laboratory (FNAL) Peter Siddons, Brookhaven National Laboratory (BNL) Thomas Tschentscher, Deutsches Elektronen-Synchrotron (DESY) Karen White, Thomas Jefferson National Accelerator Facility (TJNAF) Meetings 29-30 April 2004 12-13 October 2004 7-8 April 2005 DOE (Lehman) Review 10-12 May will cover PIXEL
What’s Next Events Calendar DESY XFEL Undulators 6-8 June Hamburg DESY XFEL Commiss. 17-22 April Zeuthen DESY XFEL Undulators 6-8 June Hamburg FEL2005 21-26 August Stanford
What’s Next Review Calendar FAC 7-8 April 2005 SAC 5-6 May 2005 Lehman 10-12 May 2005
FFTB/SPPS Schedule Must preserve funds for FY boundary BUT Acceleration of 2006 procurements considered Conventional construction – SPPS/FFTB schedule LCLS draft schedule shows May 2006 Shutdown SLAC “draft” schedule shows July 2006 Shutdown Linac Complete by end of 2006-2007 shutdown FFTB shutdown pushes LCLS Commssioning Start May 2008 at this time Exploring possibility of an earlier start
George Carlin We have written a check to DOE with our Mouths… Time to cash the check
With DOE support, LCLS design has Summary With DOE support, LCLS design has More extensive research infrastructure Greater flexibility for the future LCLS is underway
End of Presentation
Near Experimental Hall by 2012 Soft X-ray Station AMO Physics Magnetic imaging Hard X-ray Imaging Station Coherent imaging Hard X-ray Diffraction Station Pump-probe dynamics Hard X-ray Diffraction Station XPCS Hard X-ray Station Extreme states of matter (assumes funding found) Far Experimental Hall
Near Experimental Hall 2008-9 Soft X-ray Station AMO Physics (funded by LCLS) Hard X-ray Imaging Station Coherent imaging (funded by PIXEL) Extreme states of matter (funding?) Hard X-ray Diffraction Station Pump-probe dynamics (funded by PIXEL) XPCS (funded by PIXEL) Green applications do not have full capability, but can do preliminary experiments Far Experimental Hall