Linac Coherent Light Source Transition to Operations 11 July 2007

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
LCLS User Access Policy
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
LTU/Undulator Installation Status
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
WBS 5.0 LCLS Strategic Projects Division
LINAC OPS Budget Review
e-Beams Systems Update
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
John N. Galayda – Director, LCLS Construction May 13, 2009
CONVENTIONAL FACILITIES LCLS Office Space
LCLS Project Management
X-Ray Endstations Update
Details supporting the increase
LCLS User Access Policy
Project Management Issues John N. Galayda, SLAC April 24, 2002
Project Status Review May 13-15, 2008.
Synchrotron Science and User Program at SSRL A Brief Overview for the Context of LCLS Presented to the DOE Review of the LCLS Project Keith O. Hodgson,
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Project Transition to Operations 14 May 2008
Coherent X-ray Imaging Instrument WBS 1.3
LCLS Injector Commissioning P
Conventional Facilities Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Operation in 2009 Roger A. Erickson
Linac Coherent Light Source Project Update
Installation Status & Operational Readiness Process
Conventional Facilities
X-Ray Endstation Design & Management/Commissioning
CF Scope, Management & Organization
e-Beams Systems Update
X-Ray Endstation Systems (XES) 2006 Schedule
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Linac Coherent Light Source Transition to Operations 11 July 2007 Commissioning and first operation Budget Initial Operations Organization

LCLS Modifications to SLAC Linac Compete January 2008 Apr-Aug

LCLS Installation and Commissioning Time-Line X-Ray tunnel/FEH Install X-Rays in FEH LTU/Und/Dump FEE/NEH Install First Spont. Light CF Early Occupancy X-Ray Systems Checkout - Commission e- beam & Photon Systems Checkout CD-4b CD-4a S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2007 2008 2009 PPS PPS 2010 Photon Flux Measurements Controls checkout Re-commission Inj/BC2 to SL2 Operations LTU/Und/FEE Commissioning NEH Operations Linac/BC2 Commissioning linac/BC2 Install FEL Commissioning

LCLS Science Program Begins in 2009 Instrument teams will participate in first use of instruments Terms of access discussed at last Team Leader Meeting, 22-23 June X-Ray beam parameters in early operations Cumulative time limit on early access Transition to open access as soon as practical Learning from FLASH experience Facility mgmt actively encourages formation of collaborations among competing groups which have submitted similar proposals

LCLS Operations FY 2009 post-CD-4a(7/2009): FY 2010: Near Hall Operations AMO FY 2010: NEH AMO through 2/2010 (LUSI CD-4a milestone) AMO, XPP, CXI thereafter FEH available post-CD-4b(5/2010) CXI permanent home in FEH Schedule for relocation TBD

LCLS Parameters

“Conservative” Performance Forecast for Operations in 2009 – a basis for planning

Linac Ops Budget Proposed $96.7M In 2009

LCLS Construction at SLAC

LCLS Construction Organization

Matrix Support from SLAC: Klystron Instrumentation/Controls Power Conversion Radiation Physics Purchasing Accelerator Operations Service Center Support from SLAC: Mechanical Fabrication Design/Drafting LCLS Dedicated Staff Project Management ESH Conventional Facilities Mechanical Engineering End Station Systems Accelerator Physics Laser

User Facility – Basic Functions Operations Accelerator Experiments Plant facilities Science Program User Liaison Proposal review Laying the foundation for long range planning Identifying new opportunities Experiment technique FEL performance Planning Run/Maintenance Schedule and Budget Improvements & upgrades (<5 year horizon) Long range planning: improvements & upgrades

User Facility – Options for Connecting Resources to Basic Functions Prospective/incoming users Training/orientation Proposal review User database Performance monitoring Accelerator Operations Accelerator operators Accelerator/FEL Physics Hi-level software applications Engineering Mechanical Electrical RF Diagnostics Controls Experiment Operations On-Site User Logistical Support Beam line Scientist Support Instrumentation & Data Aq.

LCLS Operations Organization ASD + LCLS e-beam Systems provide template X-Ray Endstation Systems & LUSI provide template SSRL provides template

LCLS Commissioning is integrated with ASD LCLS Project

Matrix Support vs. Stand-Alone Operations Organization APS, NSLS are approximately stand-alone SNS is embedded in Neutron Science Directorate, sharing parts of organization Accelerator operations/maintenance/upgrade is all dedicated to SNS ALS has matrix support from LBNL for engineering and accelerator physics Stable and predictable

SLAC Undergoing a Transition Management Systems Analysis (McCallum-Turner) Lab Director Search Managing Contract Evolving LCLS Organization embedded in an Evolving SLAC

End Of Presentation