2018 Environmental Trade Fair Shannon Gibson

Slides:



Advertisements
Similar presentations
NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
Advertisements

Metropolitan Council Environmental Services A Clean Water Agency Info Item: Waste Discharge Rules Presented to the Environment Committee September 14,
1 Effluent Guidelines for Construction Greg Davis USEPA
Treated Wastewater Reuse For Landscape Irrigation and Amenity Lake Evaporation Make-Up Presented to: Houston Land/Water Sustainability Forum May 13, 2008.
Eura DeHart Environmental Scientist Sewage Sludge Hauling Registration and Reporting Requirements.
Rules and Records for Generators Manifesting and Transporting Used and Scrap Tires Jaime Garza, Will Wyman, and Jonathan Diaz Texas Commission on Environmental.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
The Clean Water Act Objective: To restore and maintain the chemical, physical, and biological integrity of the nation’s waters PHOTO OF 2007 OUTFALL AT.
Mobile Washing Policy Florida Statutes Section contain the basic requirement for DEP regulation. Must be a stationary pollution source, such as.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Water Treatment Plant General Discharge Permit
Wastewater and Floor Drain Sludge 6-1 (a) Wastewater From Vehicle Maintenance Facilities n Vehicle and Floor Washwater –Wastewater contains soaps, grease,
Society depends on clean and safe water.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
The Role of Health Physicists in Uranium Site Cleanups Alisha Stallard, Environmental Health Physicist Radioactive Materials Division Texas Commission.
Susan Palachek TCEQ Pollution Prevention & Education.
| [Contractor Safety Training] 1 Environmental Policy for Contractors.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
Source Control Planning for Municipal Wastewater System Permit Compliance Environmental Trade Fair & Conference Austin, TX. May 6, 2015 David James Santiago.
Direct Nonpotable Water Reuse Feasibility Study Public Meeting October 2011.
TCEQ Environmental Trade Fair
Pressure Washing DEP Policy for Pressure Washing Buildings Side Walks Carpets.
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
ECan approaches to managing nutrient losses to groundwater.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
Susan Palachek TCEQ Pollution Prevention & Education.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Texas Commission on Environmental Quality
Reclaimed Water Control Regulation No. 84 Rulemaking Hearing
Oil & Gas Waste Stream Management and Permitting Options
Missouri Department of Natural Resources
Unit 4 Lesson 1 Human Impact on Water
Biosolids Public Workshop March 22, 2016
New Licensing and Renewal Requirements
2017 Environmental Trade Fair Shannon Gibson
Water Quality Division Updates
TCEQ Environmental Trade Fair
Wastewater Treatment.
WASTEWATER MANAGEMENT
Reuse “the action of using something again”
Westbrook Contractor Safety Training April 5, 2018
Resource Conservation and Recovery Act (RCRA)
Chapter 21 Water Pollution and Treatment
TCEQ, Occupational Licensing Wastewater Licensing Overview
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
DEEP Changes to Pretreatment Programs
Georgia Update Jeff Cown Land Protection Branch
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Van Wert, OH Water and Wastewater Element Training
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
Overview of US EPA & State Manure Management Regulations
TPDES Construction General Permit Compliance
Wastewater Permitting Updates
Update on TCEQ’s Role in Oil & Gas Waste Management
Exemptions From Industrial and Hazardous Waste Permitting Requirements
Bianca Cooper & David James May 17, 2017 Water Quality Division
2018 Environmental Trade Fair
Use of Domestic Reclaimed Water
Industrial Wastewater Permits
Chapter 312 Rule Revisions
Wastewater Permitting Updates
USES OF DOMESTIC RECLAIMED WATER
Jan Bates, P.E. Underground Injection Control Permits Section
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Presentation transcript:

Reuse of Industrial Reclaimed water 30 Texas Administrative Code Chapter 210, Subchapter E 2018 Environmental Trade Fair Shannon Gibson Environmental Permit Specialist (512) 239-4284

What is INDUSTRIAL RECLAIMED WATER? Non-domestic wastewater re-used for a beneficial purpose

Why re-use industrial wastewater? Conserves raw or potable water resources.

Where are the requirements for reuse of industrial reclaimed water? 30 Texas Administrative Code Chapter 210, Subchapter E Or ‘210E’ for short.

A 210E authorization is not needed for: Internal recycling systems Closed loop systems Use of industrial wastewater as makeup water within a facility

The following wastes are not eligible for a reuse authorization under 210E: Wastewater containing: Radioactive Materials Dioxins or furans Pesticides Wastewater classified as, or which is, hazardous as defined by 40 Code of Federal Regulations (CFR) Part 261

Additional wastes not eligible for reuse under 210E: Septic tank, chemical toilet, grit or grease trap waste Barge cleaning or air scrubber wastewater Any wastewater eligible for coverage under: Permit by rule (30 TAC Chapter 321), or Evaporation Pond General permit.

Additional wastes not eligible for reuse under 210E Cont.: Process Wastewater regulated under 40 CFR parts 400-471 (with some exceptions) Remediated or contaminated groundwater generated by facilities whose process wastewater is prohibited for authorization under 210E

Features of a 210E authorization: Authorizes reuse of industrial wastewater for beneficial land application – does not authorize discharge Issued to the producer of the wastewater to be reused. Does not require the producer to have a tpdes or tlap permit Does not expire / No need to renew Two levels of coverage available

Level I coverage is available under four conditions: Wastewater is one of the specific types listed at § 210.53(a)(1)-(9) Wastewater is reused on-site Reuse is for one of the specific end uses listed in § 210.56(b)(2) Producer has an authorized primary disposal method

Level I coverage – Wastewater types: Condensate – air conditioner, compressor, steam, or other condensate that forms on steam lines and is not considered a process wastewater. Washwater from whole fruit or vegetable washing. Cooling water – non-contact or once-through cooling water Filter backwash from water treatment processes (not RO reject) Washwater from routine washing of buildings conducted without the use of detergents or other chemicals

Level I coverage – Wastewater types cont.: Washwater from routing washing of pavement Conducted without the use of detergents or other chemicals Where spills or leaks of toxic or hazardous waste have not occurred (unless spilled material has been removed) Cooling tower blowdown with a total dissolved solids (TDS) concentration of less than 2,000 mg/L Other industrial wastewater With measured effluent concentrations at or below thresholds listed in Table 1 of 210E That is not a waste source prohibited by 210E

Threshold levels (§ 210.53, Table 1)

Level I coverage – location of reuse Wastewater must be reused on-site, which means within the boundaries of: The industrial facility, or Property that is contiguous to the facility and that is owned or operated by the producer of the industrial reclaimed water.

Level I coverage – end uses Irrigation Landscaping Non-food crops Pastures of milking animals Fire protection Dust suppression and soil compaction Maintenance of impoundments

Level I coverage – primary disposal methods Disposal under any TPDES or TLAP permit Authority to route wastewater to a publicly owned treatment works (POTW) , either by Discharge to the sanitary sewer system, or Use of a suitable hauler Ability to recycle in a manner that does not discharge into or adjacent to water in the state

Level I coverage does not require: Notifying the TCEQ Submitting an application Fees Approval from the TCEQ

Level II coverage is needed if any of the following are true: Industrial reclaimed water is not one of the specified wastes eligible for Level I coverage Industrial reclaimed water contains pollutant concentrations that exceed any of the table 1 thresholds Reuse will be off-site Reclaimed water contains any amount of domestic wastewater

Level II coverage requires the producer to: Have a primary disposal method Submit an application to the TCEQ using Form 20094 – usually processed within 60 days of receipt Pay a $100 fee (but no ongoing or other fees) Receive written authorization from the TCEQ prior to reusing the industrial wastewater.

Level II coverage requires the producer to (cont.): Sample and meet effluent limitations for Total organic carbon – 55 mg/L (1/month) pH – 6.0-9.0 standard units (1/week) Other pollutants as needed Use primary disposal method if any test results exceed permit limitations Maintain records of All notifications made to the TCEQ under 210E All monitoring activities Conduct annual testing of reclaimed water unless reusing only level I waste streams off-site

Level II coverage requires the user to: Maintain an operating log that records land application activities

Other requirements in Chapter 210 may apply If the end use is irrigation – see Subchapter B If any type of impoundment is used to store reclaimed water – see Subchapter B If reuse is off-site – see Subchapters A & B If any amount of domestic wastewater is commingled with the industrial reclaimed water – see Subchapters A, B, & C

What about Greywater? Reuse of greywater is subject to the requirements of 30 TAC Chapter 210, Subchapter F

Questions? Contacts: Shannon Gibson Shannon.Gibson@tceq.texas.gov (512) 239-4671 Shannon.Gibson@tceq.texas.gov Monica Baez (512) 239-5784 Monica.Baez@tceq.texas.gov Mailing address: Water Quality Division TCEQ, MC-148 P.O. Box 13087 Austin, Texas 78711-3087 TCEQ Website: https://www.tceq.texas.gov/