AESO Update to PCC July 16, 2015.

Slides:



Advertisements
Similar presentations
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Advertisements

Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am.
Sales for the full year ended 31 December January 2010 Jean-Pierre Souchet - CFO Stéphane Bisseuil - Investors Relations.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
1 Status of Global Wind Power World Energy Solutions Conference Sao Paulo 23 November 2007 Steve Sawyer Secretary General Global Wind Energy Council.
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
AESO Update to PCC October 7, AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
GLOBAL CHANGES CUTTING DEEP Economics of energy changing based on external global dynamics, particularly with OPEC Oil prices have fallen by more than.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Climate Change Policy Gordon Harvey. 2 The extent of the challenge Global emissions need to peak no later than 2030 and be lower in 2050 than they are.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
AESO Update to PCC March, AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
Johnthescone The IPCC Special Report on Renewable Energy Sources and Climate Change Mitigation.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Renewable Energy: DTI’s Role John Thorpe Renewable Energy Industry Development Eastern Region Renewable Energy Conference, 5 June 2003.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
The Challenges of Regional Climate Policy Cooperation – A Canadian Perspective David McLaughlin President and CEO NRTEE.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Climate Policy and Green Tax Reform in Denmark Some conclusions from the 2009 report to the Danish Council of Environmental Economics Presentation to the.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
REDUCING GHG EMISSIONS. FUNDING A WAY FORWARD. Climate Change and Emissions Management Corporation.
Climate Action Climate and Energy: EU perspective Madrid, Universidad Pontificia Comillas 18 May 2015 Jos DELBEKE Director General for Climate Action European.
Chapter 1: Roles and Opportunities for Information Technology in Meeting Sustainability Challenges Helynranta Viola Parkkila Vilma
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Power Transmission Components Market Share & Industry Analysis, 2016 –
© 2016 Global Market Insights. All Rights Reserved Enhanced Oil Recovery Market Share and Forecast Enhanced Oil Recovery Market.
© 2016 Global Market Insights. All Rights Reserved Low Voltage Cable Market Trend and Forecast Low Voltage Cable Market Size,
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Gas Turbine Market Price, Packaging Trends, Industry Outlook & Forecast.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Power Transformer Market share research by applications and regions for.
Future Energy Consumption: Economic Growth and Climate Policy
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
B.C.’s Forthcoming Climate Leadership Plan
Global, National and Provincial Climate Change Commitments
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Sebacic Acid Market Growth by Sebacic Acid Market Size By Application.
Insights into New South Wales greenhouse gas emissions: sources, trends and projections The Future of Energy in the Hunter: a seminar exploring the energy.
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Power Transformer Market share research by applications and regions for.
Provincial – Territorial Federal – International Jul Jan 2017
2017 Integrated Resource Plan
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Geothermal Energy Market share research by applications and regions for.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Hybrid Solar Wind Energy Storage Market to grow at 9%+ CAGR from :
Robert Fabek Energy Institute Hrvoje Požar, Zagreb
Greenhouse Gas Reduction Targets Act
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
EVP, Chief Administrative Officer
Updated Oil & Gas Emissions Projections for 2023 and Aug. 11, 2016
RE Grid Integration Study with India
Wind & Transmission: The Clean Energy Superhighway
Special MRC – Fuel Security
New England Electricity Restructuring Roundtable September 18, 2009
Status Report on 2007–2016 Long-Term Reliability Assessment
Energy Management and Planning MSJ0210
Byron Woertz, Manager—System Adequacy Planning
Input Development for SPSG Scenarios
Byron Woertz, Manager—System Adequacy Planning
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Creating Benefits for New England: Putting the Pieces Together
AESO Update to PCC October 7, 2014.
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

AESO Update to PCC July 16, 2015

AESO July 2015 Update The AESO has published 20-year regional plans on its website Forecasting 2.4% overall load growth over the planning horizon, 3.5% in the oilsands region Currently developing 2015 Long-term Plan Exploring low growth scenario corresponding to diminished oil prices The two HVDC transmission lines are expected to be in service towards the end of 2015 Recent provincial climate change announcement will not affect reliability of the grid going forward. As we observed when SGER was first introduced, it is likely we may see an increased interest in wind, particularly starting in the 2020 timeframe when additional supply is expected to be needed in the market, and we will factor this into our future forecasting. We do not expect to see a significant impact to the pool price due to this change. We will watch for further developments on the Province’s climate change strategy and plan. We look forward to engaging with the government to support this work going forward. For Ata’s reference: AB Greenhouse Gas Reduction program The price of carbon (SGER) In 2015, $15 for every tonne over a facility’s reduction target. In 2016, $20 for every tonne over a facility’s reduction target. In 2017, $30 for every tonne over a facility’s reduction target. Source: http://esrd.alberta.ca/focus/alberta-and-climate-change/climate-change-and-emissions-management-fund.aspx

AESO July 2015 Update Alberta PowerLine Limited Partnership has been selected to build, own and operate the FMM West line. The in service date of the line is 2019 Deferring launch of Fort McMurray East competition Chapel Rock 500/240 kV Substation TFO preparing the facilities application Anticipated in service date is now 2018 WECC Path Rating process for Path 1 will be initiated later this year