TGad Editor Report Date: Authors: March 2011 April 2007

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0275r1 Submission March 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report March 2008 Date: Authors:
Advertisements

Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0648r5 Submission July 2007 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2007 Date: Authors:
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
IEEE aj January 2016 Closing Report
TGax March 2017 Closing Report
IEEE P Working Group for Wireless Personal Area Networks
TGad September 2010 Closing Report
Submission Title: TG4m 4TV Closing Report for May 2013
doc.: IEEE <doc#>
Guidelines for Internal TGad Comment Submission and Resolution
doc.: IEEE <doc#>
802.11REVmc Editor’s Report – July 2014
TGad July 2009 Closing Report
TGaf Waikoloa Closing Report
Guidelines for Internal TGad Comment Submission and Resolution
doc.: IEEE <doc#>
doc.: IEEE <doc#>
802.11REVmc Editor’s Report – Nov 2013
802.11REVmc Editor’s Report – March 2013
doc.: IEEE <doc#>
802.11REVmc Editor’s Report – May 2013
802.11REVmc Editor’s Report – July 2013
TGad November 2009 Closing Report
doc.: IEEE <doc#>
802.11REVmc Editor’s Report – May 2014
IEEE TGaf Waikoloa Closing Report
802.11REVmc Editor’s Report – Aug 2013
doc.: IEEE <doc#>
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGad July 2010 Editor Report
doc.: IEEE <doc#>
TGaf San Antonio Closing Report
doc.: IEEE <doc#>
July 2014 doc.: IEEE /18/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGaf Waikoloa Closing Report
TGad September 2010 Report Date: Authors: September 2010
TGaj Editor Report for CC22
TGaj Editor Report for CC22
TGad September 2010 Report Date: Authors: September 2010
TGad Editor Report Date: Authors: May 2011 April 2007
doc.: IEEE <doc#>
TGad Editor Report Date: Authors: July 2011 April 2007
TGn Editor Report March 2007
Submission Title: [WG-TG3 Opening Report Nov02]
TGad March 2011 Closing Report
TGad May 2011 Closing Report
802.11REVmc Editor’s Report – March 2014
TGaj Editor Report for LB220
TGmb Editor Report - May 2010
TGaf Nanjing Closing Report
TGaj Editor Report for LB226
TGn Editor Report March 2007
TGad Task Group Document Open Items
TGmd July 2017 Closing Report
TGaf San Antonio Closing Report
Submission Title: [WG-TG3 closing Report Sept02]
TGaj editor report for Sponsor Ballot
TGn Editor Report Sept 2007 Date: Authors: Sept 2007
IEEE aj May Closing Report
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
November 2016 TG1a Closing Report
September 2008 doc.: IEEE /1003r0 Sep 2010
TGax November 2017 Closing Report
TGaj editor report for Sponsor Ballot
Presentation transcript:

TGad Editor Report Date: 2011-03-13 Authors: March 2011 April 2007 doc.: IEEE 802.11-07/0570r0 March 2011 TGad Editor Report Date: 2011-03-13 Authors: Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation

Draft update and next steps March 2011 Draft update and next steps TGad draft D1.2 released on March 01, 2011 D1.2 = D1.1 + speculative implementation of all technical and editorial comments resolved since the January/11 mtg All comments as part of LB168 have now been resolved and implemented into D1.2 D1.2 has gone has gone through an editorial review by TGad’s editorial panel before its release Goals for this mtg with respect to the draft Approve creation of D2.0 on the basis of D1.2 Start a recirculation LB on D2.0 Carlos Cordeiro, Intel Corporation

March 2011 LB168 update (10/1220r21) Editorial comments were resolved by Editor and reviewed by the editorial panel The latest comment database is 802.11-10/1220r21, and contains the resolution to all comments Technical Editorial Totals Resolved Open PHY 42 23 65 MAC 509 406 915 BF 24 34 58 Others 95 96 191 670 559 1229 Carlos Cordeiro, Intel Corporation

Report for January 2011 January 2011 Carlos Cordeiro, Intel Corporation

Draft update and schedule January 2011 Draft update and schedule TGad draft D1.1 released on January 16, 2011 Speculative implementation of all technical, and some editorial, comments resolved to date (10/1220r12) Targeting March/11 session to conclude LB168 comment resolution TGad draft D2.0 will be generated weeks later, which will trigger the start of a recirculation LB Carlos Cordeiro, Intel Corporation

January 2011 LB168 update (10/1220r12) Editorial comments will be resolved by Editor after all technical comments are resolved Some technical comments will resolve editorials Contact the Editor if you want to volunteer to resolve Open CIDs Technical Editorial Totals Resolved Open PHY 38 4 6 17 65 MAC 315 194 30 376 915 BF 20 34 58 Others 78 92 191 451 219 40 519 1299 Carlos Cordeiro, Intel Corporation

Report for November 2010 September 2010 Carlos Cordeiro, Intel Corporation

TGad draft specification update November 2010 TGad draft specification update Draft 1.0 was released on September 24, 2010 Implements the approved comments indicated in the D0.1 comment database (10/717r15) Following the release of D1.0, a 30-day WG letter ballot (LB168) was initiated on D1.0 LB168 closed on October 24, 2010 Carlos Cordeiro, Intel Corporation

LB168 update (10/1220r1) LB168 received 1229 comments November 2010 LB168 update (10/1220r1) LB168 received 1229 comments Resolution to CID1162 was presented on Oct 14th conf call (802.11-10/1200r1) Approximately another 160 T/TR CIDs already have proposed resolutions to be presented and are indicated 1220r1 Contact me if you want to volunteer to resolve CIDs TR T ER E Totals PHY 28 9 19 65 MAC 278 237 192 208 915 BF 13 10 26 58 Others 80 15 71 25 191 399 271 281 1299 Carlos Cordeiro, Intel Corporation

Report for September 2010 September 2010 Carlos Cordeiro, Intel Corporation

TGad draft specification update September 2010 TGad draft specification update Draft 0.2 was released on August 05, 2010 Implements editorial comments and technical comments that passed motion at the July/10 TGad mtg (10/777r0) Draft 0.3 was released on September 02, 2010 Speculative draft that implements comments that received no objection during conference calls held after the July/10 TGad mtg Draft 0.4 was released on September 10, 2010 Implements corrections identified by the editorial panel Drafts are publicly available at http://www.ieee802.org/11/TGad/index.html Carlos Cordeiro, Intel Corporation

Comment resolution update (10/717r14) September 2010 Comment resolution update (10/717r14) TGad come out of the July/10 mtg with 120 (out of a total of 513) open comments Since then, 94 comments had resolutions proposed and received no objections (see list in next slide) As a result, TGad starts the Sept/10 mtg with 26 open comments MAC: 1 CID (CID91) MIB: 16 CIDs Security: 7 CIDs Beamforming: 2 CIDs (CID98 and CID292) Carlos Cordeiro, Intel Corporation

CIDs with proposed resolutions which received no objection September 2010 CIDs with proposed resolutions which received no objection Discussed in San Diego, but not motioned: 320, 330, 331 (BF): 10/717r11 Conference calls: 3, 405, 406, 407, 408, 412, 414, 416, 417, 56, 418, 346 (PHY): 10/944r1 447, 448, 449, 316, 58, 59, 317, 318, 319, 461, 438, 386, 413 (PHY): 10/894r1 112, 113, 141, 232, 247, 378 (MAC): 10/947r1 382, 384, 385, 387, 388, 435, 439, 454, 465, 466, 471, 472, 473, 475, 476, 479, 480 (MAC): 10/948r2 323, 422, 445, 326, 328, 332, 333, 375, 433, 13, 100, 288, 289, 290, 291, 314, 340, 312, 374, 381, 427, 434, 452, 453, 464, 481, 482 (MAC/BF): 10/977r5 159, 256, 225 (MAC): 10/983r0 371, 372 (MAC): 10/946r0 321, 477 (MAC): 10/1010r0 84, 88, 89, 90 (MAC): 10/1007r2 175 (MAC): 10/999r0 389 (MAC): 10/1014r0 368 (MAC): 10/995r5 345 (PHY): 10/1029r0 487 (General): 10/1004r0, 10/1002r0, 10/1005r0, 10/1013r0, 10/1012r0, 10/1019r0, 10/1026r0, 10/1031r1, 10/1023r1 348 (PICS): 10/978r1 Carlos Cordeiro, Intel Corporation

September 2010 Editorial panel Email sent to TGad reflector on September 03, 2010, soliciting volunteers for an editorial panel responsible to: Review drafts for: Mistakes made by the editor when implementing contributions; and Editorials Report those to editor, so that they can be fixed before the TG approves a new draft Typically, there will be an editorial review for a few days before a new draft is intended to be posted Volunteers so far: B. Lynch, J. Barr, J. Yee, S. Trainin, S. Grandhi, P. Loc, S. Shankar, T. Derham, L. Chu and I. Toyoda (?) Contact the editor if you’d like to volunteer Carlos Cordeiro, Intel Corporation

July 2010 Report for July 2010 Carlos Cordeiro, Intel Corporation

TGad draft specification update July 2010 TGad draft specification update Draft 0.1 was released on May 28, 2010 Draft is publicly available at http://www.ieee802.org/11/TGad/index.html Carlos Cordeiro, Intel Corporation

July 2010 Comment submission Following the release of D0.1, a 3 week commenting period was opened on D0.1 A total of 513 comments were received – comment database is document 802.11-10/717 Comments were reviewed during the July 1st conference call and classified into (sub)groups: 236 editorial comments (ER) = handled directly by the Editor 277 technical comments (TR) = resolutions to be proposed by volunteers 2 in the General comment group 24 in the Beamforming comment group 207 in the MAC comment group 41 in the PHY comment group 3 in the Coexistence comment group Carlos Cordeiro, Intel Corporation

April 2007 doc.: IEEE 802.11-07/0570r0 July 2010 Comment resolution Comment resolution will take place starting at the July/10 session Via submissions Via proposed resolutions suggested by assignees Via comment review sessions led by the Editor As per the TGad timeline, goal is to complete comment resolution at the September/10 session and enter WG letter ballot Any motions to approve comment resolutions should be done by September/10 Carlos Cordeiro, Intel Corporation Eldad Perahia, Intel Corporation