UNC 224 User Pays Charging Phil Broom 29 January 2009.

Slides:



Advertisements
Similar presentations
School Direct Information and discussion
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
FP7 EC Rules – Groupe recherche 16 January 2006Megan Richards European Community FP7 Participation Rules (Commission proposal adopted )
Copyright © 2015 Open iT, Inc. All rights reserved. A Chargeback Methodology for Cutting Costs & Increasing Asset Efficiency Linda Cole Director of Sales,
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Contribution to Indirect Costs Nilda Bullain European Center for Not-for-Profit Law (ECNL) January 31, 2011.
The RQF Explained Adrian Burton, Australian Partnership for Sustainable Repositories.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Custody, client funds and premium Disclosure requirements Managing transparency and conflict of interest Ethical conduct in Financial Services Complaints.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
Future Funding Allocation for Change Development  Action came about during discussions on BSC panel  The analysis of change and development of potential.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Provisional FP-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 1. The Rules of the Programme.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Capital for Enterprise Limited 1 Business Angel Co-investment Fund Rory Earley CFEL.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
1 REVIEW OF THE CODE OF BANKING PRACTICE 15 November 2001.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Central Section Member Survey Results. How long have you been a member? Identified the spread of the membership within the section.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
What is NIJAC Established in June 2005 under the Justice Northern Ireland Acts 2002 and 2004 as an independent public body –to bring about a new system.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
Wholesale Electricity Spot Market (WESM)
Needs Assessment Instrument Purpose & Elements of Design.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1. Marketing incentives for participation is a great way for credit unions to earn non-interest income Effective tool to promote the added-value of membership.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
IGT and Shipper Workgroup meeting 28 th February 2011.
Revisions to WPP Stewardship Plan Steward Webinar August 12, 2015.
Accounting and Reporting on an Accrual Accounting Basis
Role of Parties involved in JI-projects: Sweden
Ch. 14 Know the criteria for effective taxes
CGR2 Summary Proposals UNC Panel 18 October 2012.
Internet Traffic Management and Accounting Workshop
MERITS & DEMERITS OF CREDIT SALES. WORKSHOP ON SALES MANAGEMENTS.
Shaun Hewitt CPA, CMA Director of Operations Support Region of Peel
An Introduction to Balancing Services Use of System Charging (BSUOS)
The Access to Justice Foundation
Comprehensive Rate Study & Cost Allocation Analysis
Presentation by Daniel B Edds, MBA, PMP Council Presentation
Potential Nexus Topic: Universal Single Meter Point Supply Points
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
UNC Modification Proposal 0362
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
User Pays Agency Charging Statement
Berkswell Parish Council
UNC 224 User Pays Charging arrangements
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Modification 421 – Updates and Benefits Case
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Overview of RbD Risk Modelling 31 March 2008
Reconciliation Volume Impacts 25 January 2008
Commercial Arrangements For Gas Quality Service – Introduction
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

UNC 224 User Pays Charging Phil Broom 29 January 2009

User Pays charging principles for UNC 224 23/05/2019 User Pays charging principles for UNC 224 UNC 224 will create user pays services and user pays charges which will be published in the Agency Charging Statement (ACS) High level principles: Cost reflective – ensure charges recover actual costs Targeted – are the costs fair to all parties? Transparent – easy to understand and administer Encourage confidence – No hidden charges or unknowns

Charging Methodology for UNC 224 development costs 23/05/2019 Charging Methodology for UNC 224 development costs Two potential models (and variants) developed: “Membership fee” 1a) Flat 1b) Banded “Availability fee” 2a) Flat 2b) Banded

1. Membership fee model Joining fee paid on confirmation as DME 23/05/2019 1. Membership fee model Joining fee paid on confirmation as DME Costs targeted only at those who participate Fee is based on forecast take-up (demand) Risk of under/over recovery Risk of reconciliation fees if under-recovery 1a) Flat fee – all users pay the same regardless of which EUC band 1b) Banded fee eg. EUC band 6-8 multiplier = 2 EUC band 5 multiplier = 1.5 EUC band 4 multiplier = 1

Example of model 1b – Banded membership fee 23/05/2019 Example of model 1b – Banded membership fee Assume fee = £10 per eligible meter point MPR snapshot determines which band at start of UNC 224 rollout EUC 6-8 would pay: £10*1 (phase 1) + £10*0.5 (phase 2) +£10*0.5 (phase 3) = £20 total EUC 5 would pay: £10*1 (phase 2) + £10*0.5 (phase 3) = £15 total EUC 4 would pay: £10*1 (phase 3) = £10 total Fees set to forecast demand under/over recovery reconciled from all members or all eligible users.

2. Availability fee model 23/05/2019 2. Availability fee model All eligible meter points pay towards the development cost DME is made available to all users where EUC 4 and above (subject to rollout) Costs targeted only at those who participate Fee is not based on forecast take-up (demand) No risk of under/over recovery No risk of reconciliation fees if under-recovery 1a) Flat fee – all users pay the same regardless of which EUC band 1b) Banded fee eg. EUC band 6-8 multiplier = 2 EUC band 5 multiplier = 1.5 EUC band 4 multiplier = 1

Example of model 2b – Banded Availability fee 23/05/2019 Example of model 2b – Banded Availability fee Assume fee = £10 per eligible meter point MPR snapshot determines which band at start of UNC 224 rollout EUC 6-8 would pay £10*2 (multiplier) = £20 EUC 5 would pay £10*1.5 (multiplier) =£15 EUC 4 would pay £10*1 (multiplier) =£10 All development costs recovered immediately, no under/over recovery or reconciliation charges for users.

Relative merits Membership fee – Model 1 Availability fee – Model 2 23/05/2019 Relative merits Membership fee – Model 1 Availability fee – Model 2 Objectives 1a Flat 1b Banded 2a 2b Cost reflective Targeted Transparent Confidence