Stakeholder consultation meeting on the CAFE baseline scenario Welcome 30 April, 2004 CAFE BASELINE SCENARIO STAKEHOLDER MEETING, 30 April, 2003
Details of main technical tasks of CAFE Assessment of health and environmental effects Selection of health and environmental targets for optimisation Selection of alternative scenarios Selection of indicators Ready by July 2004 Ready by early 2005 Identification of potential measures Integrated Assessment Modelling Assessment of measures, ceilings, proposed targets or commitments Policy guidance Cost curves Baseline emissions scenario Analysis of costs and benefits Source-receptor functions, regional and urban scale Interaction throughout Monitoring and atmos-pheric modelling 30 April 2004 Implementation, peer review, stakeholder participation, public information
Purpose of meeting Have checked that the comments have been included into the development of the CAFE baseline to the extent this has been possible Have the overall conclusions of the CAFE baseline understood also by non-technical experts Be a “sounding board” before CAFE Steering Group CAFE BASELINE SCENARIO STAKEHOLDER MEETING, 30 April, 2003
AGENDA 9.15 Opening (Vainio) 9.30 Summary of the bilateral discussions (Amann) 9.50 Energy (Mantzos) 10.10 Agriculture (Klimont) 10.30 Transport (Delsalle chairs, Cofala presents, Proost comments) 11.00 Café 11.15 CAFE baseline emissions (Amann) 11.45 Discussion and comments 13.00 Lunch 15.20 Air quality and deposition (Amann, Watkiss comments) 15.40 Discussion and comments 16.40 Conclusions and next steps (Vainio) 17.00 Close CAFE BASELINE SCENARIO STAKEHOLDER MEETING, 30 April, 2003
Do emission projections reflect national thinking? Questions Do emission projections reflect national thinking? What can be done by 18 May? Any wishes before closing stakeholder consultation of the baseline for Thematic Strategy for Air Pollution? CAFE BASELINE SCENARIO STAKEHOLDER MEETING, 30 April, 2003