Comments of Stephen Ward, Maine Public Advocate October 28, 2004

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
FSR Training course Florence, October 10-14, 2011 REGULATION OF ENERGY UTILITIES Module 12 Electricity tariff design Ignacio J. Pérez-Arriaga Instituto.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
SM Policy Objectives for Energy Storage Procurement CPUC Energy Storage OIR January 14, 2013.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
Transmission Congestion on the Delmarva Peninsula December 17, 2003 PA
Midwest Demand Response Initiative Kick-off Meeting Bob Lieberman, Commissioner, Illinois Commerce Commission John Norris, Chairman Iowa Utilities Board.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
NASUCA 2015 MID-YEAR MEETING The Utility Push To Increase Customer Charge: What’s Wrong With It and How To Respond To It. Glenn A. Watkins, CRRA Senior.
An Overview of Our Regulatory Proposal
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Network Customer Meeting Access Metric Update November 16, 2006.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Transmission Pricing Methodology Presentation to the Electricity Commission Conference 26 April 2007.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
New Incentives for Pursuing Demand Response Scott Strauss and Sean Flynn Spiegel & McDiarmid APPA Legal Seminar San Francisco – November 2004.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
IMM Report on MISO South Integration Presented by: David B. Patton, Ph.D. Independent Market Monitor Presented to: Entergy Regional State Committee April.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Middle East Distribution Transformer Market Price, Packaging Trends, Industry.
Causer Pays Workshop 20 March 2017.
New Mexico Electricity An Industrial Perspective
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
FlorenceForum November 2008
Benefits of ICAP Reliability Economics
Transmission: the Critical Link
Massachusetts Electric Restructuring Roundtable
The Future of Demand Response in New England
Assessment of the GTAC: Nova’s perspective
Draft 2013 Energy-Efficiency Forecast
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
The Need for Compensatory Standby Rates
Locational Installed Capacity Restructuring Roundtable
Transmission As Enabler
Benefits of New England’s Proposed Capacity Market
New England Resource Adequacy
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Transmission Pricing & Regional Electric Markets
Energy Efficiency in New England: Resource Opportunities
Mary J. Healey CT Consumer Counsel NASUCA, President
ICAP Issues Massachusetts Roundtable February 16, 2001
Chapter 9 Section 1 I. Economic Impact of Taxes
New England Electricity Restructuring Roundtable September 18, 2009
Vice President, Markets Development
Alternative ICAP Proposal
What Does the Recent LICAP Settlement Mean for New England?
Creating Benefits for New England: Putting the Pieces Together
Gordon van Welie, President & Chief Executive Officer
Dr. Richard A. Rosen Tellus Institute – Boston, MA
Wholesale Electricity Costs
LICAP New England Joel S. Gordon PSEG Energy Resources & Trade, LLC
LICAP Settlement: Demand Resources
MA DG Collaborative – Year 1
Comments on New England Regional State Committee*
Winter Reliability Program Updated
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

Comments of Stephen Ward, Maine Public Advocate October 28, 2004 Restructuring Roundtable: “Should it be Commonplace to Pay in Common for Local Upgrades?” Comments of Stephen Ward, Maine Public Advocate October 28, 2004

1. The title for this panel points to one clear distinction between transmission projects: above ground/overhead and underground/ buried - significant cost differential between the two. 2. I do think it is critical to differentiate [as the current planning procedures and tariff do] between cost recovery for “plain vanilla” transmission projects and for “gold plated” underground projects. 3. I’ve yet to meet anyone who staunchly advocates gold plating when they themselves have to pay for it … but there is considerable interest in designating projects as reliability-related if in fact they have gold-plated components.

4. The obvious concern is that unnecessary project costs are spread region-wide to customers who derive no benefit from the gold plating. The additional wrinkle in the case of SW Connecticut is that customers in a state with the highest per-capita income in the U.S. (36% above the national average) can export T-related costs to customers elsewhere in NE who have lower per-capita income (in Maine, 9% below the national average). 5. This possibility reminds those of us with long memories about the debates within NEPOOL in the late 1980’s over whether to increase pool-wide reserve requirements to account for outages at 1150 MW nuclear units. Because Connecticut had 3 nuclear units and was bringing a 4th on line at the time, the new higher requirements imposed significant costs in parts of the region where load growth was not nearly so rapid as in Connecticut but where energy efficiency programs were higher on the regulatory agenda than in Connecticut.

6. The problem with a regional allocation of $1 billion for new transmission in SW Connecticut is a different problem from the 22% revenue requirement proposals in the 1980’s but it does recall the politics of that debate in the region. 7. The rationale for socializing T-upgrade costs across the region boils down to the contention: sooner or later, everyone’s project will get socialized; it’s just a matter of time. I disagree, I think rural states are much less likely to benefit because infrastructure upgrades occur more frequently in high-density areas. There is a question of fairness here due to the differing rates for upgrading. 8. As a party requesting FERC reconsideration of the current tariff, along with the Maine and Rhode Island PUCs, I think we should adopt the principle that cost causers should pay for T upgrades, without 100% region-wide socialization.

9. In fact, FERC has approved a “cost causer pays” methodology for energy prices. New England has adopted a LMP regime that seeks to elicit market responses in given sub-regions by conveying accurate price signals within those sub-regions. 10. Socializing all RTEP project costs essentially sends a contradictory message: transmission projects (unlike generation or demand response) will be treated as valuable irrespective of the sub-region in which they are located. 11. The result is that price signals that could stimulate cost-effective alternatives to a transmission upgrade are muffled – if not silenced altogether – if those costs are fully socalized.

12. The current rules also are hard to implement 12. The current rules also are hard to implement. How do you distinguish real-world economic or “gold-plated” investments from purely reliability-based ones. Not easy to do, except in the most egregious cases. In my view, virtually all underground T (except for submarine cable projects) should not qualify as economic or reliability-based, at least outside of urban centers. 13. The current definition of a reliability upgrade is so broad as to encompass just about every project identified in the RTEP process. The result will be socializing costs for projects that simply are not economically justified. In particular, if one state’s regulators assume a project’s costs will be socialized, they may be much more apt to approve uneconomic project components in that project.

14. The upshot is that we need to be very cautious about adopting a blanket assumption that all customers in the region will benefit from all RTEP projects. Some will, considerably. Some may not, at all. 15. Along with Rhode Island and Maine Regulators, we have requested reconsideration of FERC’s December 18, 2003 order approving transmission cost allocation amendments adopted by NEPOOL. Instead we have proposed a 75%/25% allocation of costs for reliability upgrades. That approach, we believe, will forestall the development of uneconomic projects and will better protect the most distant customers who derive the smallest identifiable benefit in subsidizing those most directly benefited.

I’m happy to respond to questions.