BSM S. Grishin (installation manager),

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

Bunch Compressor 3 Torsten Limberg for Frank Stulle et al.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
ESS DTL beam commissioning
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Refurbished Booster RF John Reid October 24, 2012.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS Front End diagnostic
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ELENA installation progress F. Butin / ELENA collaboration.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
ESS Program Plan and Schedule Update
ESS licensing process and Readiness Reviews
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Sub-system integration for the VBOX
Updated with comments 22 may 2017 Updated again 29 June 2017
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
10/month is the present production rate 2 FTE + sporadic contributions
Proton Source and LEBT Luigi Celona & Lorenzo Neri
UK RFD Pre-Series cryomodule
Tom Shea Front End Meeting Catania
Teleconference ACS – FREIA 20th February 2018
Project planning and status (February 2018)
Advanced Research Electron Accelerator Laboratory
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
ESS Bilbao RF Systems Overview Pedro J. González
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Undulator System Components Status Dean Walters
Risk, Schedule, Deliveries
THE STATE OF BEAM DIAGNOSTICS
Overall time schedule of SRF activities
Testing Coordination at ESS
NC Accelerator Structures
Double-Spoke Cavities
Extraction Michael Bevins May 17, 2007
Teleconference ACS – FREIA 19th June 2017
High Level Readiness Reviews
Accelerator NCFE Liaison Officer
Status of the ESS High Power RF Systems
LCLS Control System Personnel Linac & BC2 Controls progress
Overview of the TARGET Monolith Rough Vacuum
Procedure for MEBT installation in the accelerator tunnel at ESS
22-SAR MEBT Vacuum test Aitor Zugazaga Zamudio, 27 March 2019.
Project Support Meeting January 9, 2019
Presentation transcript:

BSM S. Grishin (installation manager), I. Dolenc Kittelmann (BSM system lead) BI Forum, ESS, Lund, Sweden, 20-22/11/2018

BSMs @ ESS Longitudinal Bunch Shape Monitoring (LBM) Originally foreseen 4 LBM devices along the ESS linac LBM1: MEBT LBM2: End of DTL (LEDP) LBM3 & LBM4: After Frequency jump (MB), at the end of HB – now both cancelled MEBT & DTL LBM: Bunch Shape Monitor (BSM) – “Feschenko device” 2 year contract with INR, Moscow (S. Feschenko, S. Gavrilov) Design and production of 2 BSMs Modernize RF deflector design Resolution improved from 1o to 0.7o

BSMs @ ESS April 2018: 2 BSM devices arrive to ESS: MEBT & DTL BSM On schedule "On Monday, 23. April, 2018, two Bunch Shape Monitor (BSM) devices arrived to ESS, following a 2 year long design and fabrication period without any delay. The BSMs were designed and fabricated by a team of experts from INR, Moscow, Russia, lead by S. Gavrilov and A. Feschenko. The two devices, which were prior to shipment disassembled and packed in 11 boxes, are currently stored in the RATS space in Lund. They will be installed in the MEBT and LEDP sections of the ESS linac and will provide valuable information about the average time structure of the proton bunch as measured during the commissioning and start-up periods of the ESS linac.” May 2018: Working meeting with S. Feschenko and S. Gavrilov Discussing installation plans, commissioning, DAQ

List of additional equipment According to the contract with INR Certain items provided by ESS Procurement close to final (Clement) Orders: all in place Received: all items apart from one (rack mountable PC)

BSM cleaning (MEBT) Done BSM cleaning: necessary minimum to cross-check BSM-MEBT mechanical integration at Bilbao Done INR: ”ESS can open Box#1 (number one) to clean vacuum parts.  You will need to disassemble them, because it was packed as one part ready for installation”.

BSM cleaning at ESS vacuum facility

"big" BSM parts for UHV-cleaning

BSM cleaning : small lesson After UHV cleaning, the next step was a leak check. Assembling the BSM-MEBT with UHV blank flanges on one DN 63 CF flange – it doesn’t fit It is a standard DN75CF (4.625" OD) flange (and gasket)

Leak test