Huntsville High School Sports Lighting Upgrades

Slides:



Advertisements
Similar presentations
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Advertisements

Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
LED Sports Lighting at Duke University Case Study: Williams Field at Jack Katz Stadium Casey A. Collins, PE, CEM Duke University Facilities Management.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Facilities and Construction: Did you know your GPO can help?
Inverters. What is an inverter? Inverters change Direct Current (DC) to Alternating Current (AC). Stand-Alone inverters can be used to convert DC from.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
College Station ISD Planning for Growth December 12, 2006.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Hospital Facility Managers Association of Delaware Valley.
Welcome Mr. Garcia A r c h i t e c t u r a l D e s i g n.
Monterey Model: Strategies for an Efficient Public-Public Partnership Case Studies toward Success George Helms General Services Superintendent.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
 Electric service = 600 kilowatts  Facility demand = 560 kilowatts  Generator capacity = 180 kilowatts  Emergency generator is only capable of powering.
Indiana Subcontractor Association (ISA) and TURNER Butler Hinkle Fieldhouse Renovation project rollout Thursday, at Hinkle Fieldhouse.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Operation & Maintenance Construction & Logistics 4D/5D Construction Fabrication Documentation Analysis Detail Design Conceptual Design Programming Renovation.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CONSTRUCTION MANAGERS MANUAL
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
AS DOT&PF is responsible for the planning and construction of public works, expect court facilities. Public Facilities or Public Works include.
1.ARCHITECT 2. ATHLETE 3.TEACHER. ARCHITECT FAST LOOK Salary * * * * * excellent Occupation size * * above average Job stability * * above average ARCHITECT.
Air conditioning Repair Companies in Greenville, NC
2010 Environmental Change Orders. Tom Harris, PE Field Engineer Division of Construction Management.
Get Electrical Services for Home & Business in Thornleigh
Get Electrical Services for Home & Business in Gordon
Find the Reliable Electrical Services in Macquarie Park
Solar Water heating System information card
Western Michigan University Central Power Plant
Bond Oversight Committee
Robinson Park Recreation Center Renovation
2018 – 2020 Budget| Presented by: Cameron Prince
Electrical Contractors in Anaheim
February 12 – 19, 2018.
Anaheim Electrician. Pool Lights Ceiling Lights.
Huntsville City Schools Huntsville High School Softball
By: Miss Kelsey.
Joint Base Langley – Eustis Overview
POWER FOR WATER: Meeting Infrastructure Needs
Facilities Modernization Program
UPGRADE MOORING FACILITIES JETTY NUSTAR TERMINAL GRAYS (LONDON) DESIGN, TENDER AND RISK MEETING DD 25 JANUARY 2017.
ચાલો માટી વિશે જાણીએ All About Soil.
Brencal Contractors Inc.
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Operations Directorate Update
Rucker Elementary School

Towle Stadium C-4632 Facility is utilized for: Ultimate Frisbee, 4 on 4 Flag Football Tournament, Unit Level Soccer, Unit Level Flag Football, Turkey Bowls,
M/S KASHTRONICA A comprehensive solution to your automation requirements.
Chapter 6 Site Construction.
Huntsville High School Softball Program Upgrades
IT Lobby Renovation at Merts
Columbia High School Exterior Lighting Upgrade
Steps To Prepare Site For Site Work Construction Calhoun GA.
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Pole Position Student Points Time
A B C D.
Street Lighting and Electric System Undergrounding
Presentation transcript:

Huntsville High School Sports Lighting Upgrades Jeff Gattis Construction and Renovation Coordinator February 7, 2019

Huntsville High School Sports Lighting Upgrades Project: Huntsville High School Sports Lighting Upgrades Architect: Engineering Design Technologies, Inc. Contractor: S & G Waldrop Electric, Inc. Contract Amount: $155,817.00 This project is part of the larger project “Huntsville High School Softball Program Upgrades”

Project Description Install field lighting for the softball field and football field Remove existing light poles and lights – Save existing lights for use at another location Install 4 Muscco light poles at the softball field and 4 Muscco light poles at the football field Upgrade power to accommodate new lights and run underground to new locations Provide soils testing at each pole location New lights will have a 25 year Maintenance Warranty