Parks Highway Reconstruction: Lucas Road to Big Lake Road

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Hot Springs Public Meeting Reconstruction of US 18 & US 385
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
New I-65 Interchange at Worthsville Road Welcome!.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
MED SR 18 Corridor Project MED PID October 13, 2015.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Moloto Road (R573) Safety Investigations
Pioneer Road Relocation and Reconstruction Project
2nd Street Drainage and Paving Improvements
Secor Road Reconstruction Project Public Meeting #2
Four Winds Condominium Association August 2, 2017
Downtown Valdosta Truck Traffic Mitigation Study
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Regional Roads Committee
Project Status & Right-of-Way Acquisition
North Lamar Boulevard Project
NGTA Halton Planning and Public Works Committee
Performance Measure Index
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
Pilot Project Evaluation
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
Public Information Meeting NW 100th Street Reconstruction Project
OR 99E Corridor Segment Plan
San Mateo Countywide Transportation Plan update
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
ROUNDABOUTS Improving Safety and Efficiency
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
HSM Applications to Multilane Rural Highways and Urban Suburban Streets Safety and Operational Effects of Geometric Design Features for Two-Lane Rural.
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Sarno Road Corridor Study
Geometric Design: General Concept CE331 Transportation Engineering.
Comprehensive Transportation Plan
Southern Bridge Project Brown County Executive
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
BORDER WAIT TIME WORKING GROUP Technology Evaluation and Deployment
Signal Operational Review Performance Monitor *
Intersection Sight Distance (ISD) – AASHTO Method
U.S. 20 at State Road 2 New Interchange
Dakota County Board Of Commissioners August 6, 2019
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
New Hanover Comprehensive Plan
Buckner Road Interchange at I-65 Public Meeting
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Parks Highway Reconstruction: Lucas Road to Big Lake Road Alaska Department of Transportation & Public Facilities Parks Highway Reconstruction: Lucas Road to Big Lake Road Project Status by Jim Amundsen, P.E. January 2013

Project Description West End: East End: Current average daily traffic: 14,000 Current average daily traffic: 21,000 Projected traffic by 2035: 27,000 Projected traffic by 2035: 41,000 6/8/2019 Integrity ∙ Excellence ∙ Respect

Parks Highway Project Extremely High Crash History Existing Road is at Capacity

Purpose and Need Purpose: Parks Highway is an NHS route whose primary function is moving goods and services with limited, safe, access. Need: Address the safety problems caused by uncontrolled access, while reducing congestion, and increasing travel efficiency. 6/8/2019 Integrity ∙ Excellence ∙ Respect

What is a 4-lane divided? 6/8/2019 Integrity ∙ Excellence ∙ Respect

5-Lane Section Allows full access to driveways and cross streets, from both directions, to both sides of the street

What Safety Problems? Ranked #1 in Alaska for head on crashes Ranked #1 corridor with the greatest risk of death and injury in the state 3 times the state average for fatalities 23 deaths in the last 10 years on this stretch 2 times the state average for major injury 86 injuries require hospitalization in last 10 years 6/8/2019 Integrity ∙ Excellence ∙ Respect

Improving Safety The 4‐lane divided was selected due to safety and efficiency advantages. Compared to a 5‐lane section; Nationally, reduces head‐on crashes by 21% Nationally, reduces sideswipe crashes by 47% In Alaska, overall crash rates for 5‐lane sections are about 45% higher than 4‐lane divided 6/8/2019 Integrity ∙ Excellence ∙ Respect

Improving System Efficiency Provide more efficient movement of traffic 5‐lane would be 45 mph 4‐lane divided will be 55 mph 5‐lane sections begin to fail operationally and in safety where AADT exceeds 24,000 to 28,000 Alaska experience on 5 lane roads reveals continued safety concerns High volume 5‐lane roadways in Anchorage are being converted to 4‐lanes 6/8/2019 Integrity ∙ Excellence ∙ Respect

Public Involvement EA Phase (2004‐2010) 8 Public meetings 27 Stakeholder interviews 5 Community Council and civic group presentations Design Phase (2011 and on) 7 Public meetings plus one planned for January 30, 2013 5 Stakeholder meetings to date 9 presentations to boards and commissions Communication and coordination with public ongoing 6/8/2019 Integrity ∙ Excellence ∙ Respect

Adopted Plans The 4‐lane divided section is consistent with the following local adopted plans: MSB Long Range Transportation MSB Comprehensive Development Plan Big Lake Comprehensive Plan Meadow Lakes Comprehensive Plan City of Wasilla Comprehensive Plan City of Wasilla Official Streets & Highways Plan 6/8/2019 Integrity ∙ Excellence ∙ Respect

Economic Impact “Studies to date indicate that median projects generally have little overall adverse impact on business activity. Business owner perceptions of potential impacts of access changes tend to be much worse than actual impacts.” Studies show that changes in access do not cause a change in the use of the abutting properties In surveys, Customer Service, Product Quality and Product Price are regularly ranked as more important than business accessibility Economic studies show that employment typically increases locally after access management is introduced (Source: Access Management Handbook, Center for Transportation Research and Education ) 6/8/2019 Integrity ∙ Excellence ∙ Respect

Economic Impact (continued) Increased road capacity results in increased traffic past businesses Increased travel speed along controlled access corridors actually reduces the travel time to access businesses, even with slightly longer routes Reduced safety of the roadway would discourage travelers from visiting businesses which they do not feel safe accessing 6/8/2019 Integrity ∙ Excellence ∙ Respect

Right of Way impacts ROW impacts shared with the public during every public meeting Federal process followed to compensate, relocate and make property/business owners whole Site specific issues will be addressed during ROW negotiations 6/8/2019 Integrity ∙ Excellence ∙ Respect

Right of Way Issues This figure is an example of how we are continuing to develop solutions for each property. 6/8/2019 Integrity ∙ Excellence ∙ Respect

Environmental Impact Higher travel speed, less conflicts, and reduced delay increases overall fuel economy of 4‐lane option over 5‐lane Access Management would responsibly protect the long term statewide right‐of‐way investment (Source: Access Management Handbook, Center for Transportation Research and Education) 6/8/2019 Integrity ∙ Excellence ∙ Respect

Questions For more information: Jim Amundsen, P.E., Project Manager DOT&PF 907‐269‐0595 Jim.Amundsen@alaska.gov www.parkshighway44‐52.info 6/8/2019 Integrity ∙ Excellence ∙ Respect

Schedule Phases 1 and 2: Lucas Road to Pittman Road Preliminary Design: December 2010 - July 2011 Final Design: Aug. 2011 – Sept. 2014 Right of way: March 2012 – March 2015 Construction: 2015-2016 Phase 3: Pittman Road to Big Lake Road Preliminary Design: April 2012 – Aug. 2013 Final Design: Sept. 2013 – Sept. 2016 Right of way: Oct. 2013 – Sept. 2016 Construction: 2017-2018 6/8/2019 Integrity ∙ Excellence ∙ Respect

ROW Impact of Signal at Lamont Way 6/8/2019 Integrity ∙ Excellence ∙ Respect

Conflict Points 6/8/2019 Integrity ∙ Excellence ∙ Respect

Access vs. Mobility 100% Mobility, No Access