Wesson Building Medical Air Compressor

Slides:



Advertisements
Similar presentations
David Capal, CEM, CHFM, SASHE David Womack 1.5 Contact Hours /0.15 CEU AHA/ASHE.
Advertisements

1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
Anesthesia Apparatus Checkout Recommendations
UTILITIES MANAGEMENT. UTILITIES SYSTEMS FALL WITHIN THE FOLLOWING CATEGORIES: ELECTRICAL SYSTEM STEAM SYSTEM HVAC SYSTEM VERTICAL AND HORIZONTAL TRANSPORT.
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
Oxygen Concentrators.
GO ORDNANCE !!! ORDNANCECORPS 1 Antenna Mast Group We will now trace the electrical circuits of the antenna mast mast group. Be fore we get started you.
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Super Storm Sandy 2012 Robin Haag Coney Island Hospital Infection Control Department.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Emergency Oxygen Assembly and Administration By Alexa Keenan Assembling and Administering Emergency Oxygen.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
RHEA Phase 1 Storyboard. Purpose This provides a high level overview of the solution, in a simple story format.
How To Replace Your Fuel Filter On a 1998 Mustang GT.
Low Pressure, Continuous Flow Breathing Air System.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
HVAC523 Basic Subsystems.
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Welcome to. 2 Information Rich Event On around 1330 hours, facility workers smelled smoke Stopped work and called the Emergency Service Dispatch.
PERSONAL PROTECTIVE EQUIPMENT State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Med Gas Survey: Top Items Found Presented By: Larry Schutt, ASSE 6020,6030,6035,6040 Medical Gas Technical Services.
Printed by BabyView: Real Time Monitoring of Neonatal Intensive Care Patients Erin L Scott *, Dr. Bill Walsh +, Dr. Paul King * *Department.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
XAS 375 CD6 Compressors Committed to sustainable productivity
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f Strategic Risk.
Office of Railroad, Pipeline & Hazardous Materials Investigations Smoke and Ventilation Issues Nancy B. McAtee Office of Research and Engineering.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Case study Two fatalities in a toxic cloud Frank Verschueren Process Safety Inspector Belgium Case Study Toxic cloud F.Verschueren MAHB JRC ISPRA 05/11/2015.
CASE STUDIES * System Engineering, 9th Edition Sommerville.
POSITIVE CRANKCASE VENTILATION AND SECONDARY AIR-INJECTION SYSTEMS
Piped gas supply Description
14 Refrigerant Recovery, Recycling, and Recharging.
MACS CPAP System Self Guided Tour.
SAFE WORK INSTRUCTIONS
TOT SPOT proposal.
East Africa / 12 April 2012 Smoke and Fumes in Sleeping Area
Grade 7 Trip to Washington D.C.
RHEA Phase 1 Storyboard.
Chapter 9 Safety Permit Systems
Presented by Katie Dillon, BSN, RN, CPN & Kelsi Kliment, BSN, RN, CPN
Christmas & New Year Opening Times
Training for New District Test Coordinators
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Cryo stop of P8 on 1st of November
Intro to First Aid and CPR
FEATURED TEAM: General and Plastic Surgery, Fontana Medical Center Wait times irritating members? Here's a solution WHAT THEY DO: To keep patients informed.
M3 LOTTERY SCHEDULE – CLASS OF 2019
University Medical Center
Sewer Infrastructure Watuppa Plantations Development
SAFE WORK INSTRUCTIONS
Overarching Commissioning Plan
Tuttleman Counseling Services
Got Gas? A Planned Oxygen Shutdown
Instructions: Adding refrigerant fluid to system
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
2nd Year Intern Presentation
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Monday, January 15th MLK Day No School Fill in Agenda with:
Aware Senior Care In-Service:
NICU and OR Handoff Starting 2/25/19.
Compressor Operating Instructions
Presentation transcript:

Wesson Building Medical Air Compressor Failure, Replacement, and Next Steps Emily Bonazelli Clinical Engineer

Overview Wesson Building One Medical Air Compressor Neurology and Sleep Center Wound Care Hyperbaric Medicine Labor and Delivery NICU One Medical Air Compressor

Medical Air Compressor Failure Event Saturday, January 28, 2017 7:45 PM Engineering made aware of no pressure alarms on the medical air compressor Low air pressure alarms on 6 ventilators in NICU All air/oxygen blenders alarm loss of air (<20 psi) NICU called security and CE on-Call

Medical Air Compressor Failure Event Saturday, January 28, 2017 8:30PM Engineering discovers the source of the leak and restores system pressure Ventilators reestablish air pressure CE on-call arrives at the Wesson Building CE on-call reaches out to Supervisors CE Supervisors reaches out to CE Respiratory specialist CE Supervisor reaches out to Respiratory Manager to identify possible air tanks and regulators

Medical Air Compressor Failure Event Saturday, January 28, 2017 9:30PM CE Supervisor and CE Respiratory Specialist arrive on scene CE and NICU staff begin disconnecting all ventilators and blenders not in use to help relieve stress on compressor Medical Air Compressor Vendor arrive on site 10:15PM CE discuss medical air compressor with Engineering CE reconnects ventilators and blenders to test compressor 11:30 PM CE checks with clinical staff before heading home

Root Cause Analysis (RCA) Timeline Leading up to the Event Project Title: Wesson Women and North Wing Medical Air System Date: 01/28/2017 Event Description On Saturday January 28th, 2017 at 7:51 PM the NICU staff observed a system air pressure alarm. Six ventilators alarmed indicating ‘Low Pressure’ and all air/oxygen blenders alarmed indicating a loss of air pressure at least 20psi less than oxygen. It was determined that there was a loss of medical air to the Wesson Women and North Wing buildings. Timeline Leading up to the Event Date 01/28/2017 Sequence of Events There was an air leak in tubing connecting the compressor to the pressure gauge The pressure gauge indicated that there was no pressure in the pump causing the system to over pressurize one compressor The pressure gauge continued to read zero pressure in the system causing the system to turn on all three compressors All three compressors over pressurized causing all three safety values to open in order to reduce pressure resulting in a massive air leak The air leak caused an actual loss of pressure in the system The loss of pressure caused the system to no longer deliver air to the air outlets throughout the Wesson Women and North Wing buildings Investigative Team Engineering Clinical Engineering

Replacement Planning Monday, January 30, 2017 – Thursday, February 2, 2017 Engineering, CE, and Clinical Staff worked to determine the following: Shutdown time frame NICU evacuation site Amount of medical air tanks needed to sustain NICU, LDRP, and Hyperbaric through the shutdown

Replacement Planning Shutdown time frame NICU evacuation site Tuesday, February 7th at 9 am Will take about 8 hours NICU evacuation site Dedicated four rooms on Infants and Children's unit Amount of medical air tanks needed to sustain NICU, LDRP, and Hyperbaric through the shutdown Medical air tanks were ordered to set up a tank farm to back fill medical air Location of tank farm

Replacement Planning Monday, February 6, 2017 CE and Clinical staff rounded in NICU to determine how many patients are on blenders and vents CE set up four rooms on Infants and Children’s including NICU code cart Engineering set up tank farm Hard stops included: baby needing or on an oscillator

Replacement Tuesday, February 7, 2017 7:30 AM 8:00 AM 9:00 AM 2:13 PM CE and Clinical staff rounded in NICU to determine how many patients are on blenders and vents 8:00 AM Emergency operations center opened 9:00 AM Shut down begins Running of tank farm 2:13 PM Switched to secondary tank farm 3:30 PM Medical Air Compressor replacement installed and functioning

Replacement Pressure checks every 2 hours Every step was communicated to the EOC

Concerns with Current State Wesson Building usage of Medical Air >6000 hours of runtime for all three compressors in 2 years HOF medical air compressor has a runtime of 500 hours in 6 years Replaced Medical Air Compressor with same model Needed a high pressure line for hyperbaric chamber Know single point of failure

Medical Air Usage Hyperbaric chambers were replaced and no longer needed a high pressure line 1 blender at every bedside in NICU 1-2 blenders in every LDRP room Blenders remain on at all times

Next Steps Continue to discuss blender usage in the Wesson building Add a second Triplex compressor Requires second medical air shutdown Currently scheduled for the end of April

Questions?