Cruz Bay Waterfront Plan

Slides:



Advertisements
Similar presentations
Check in / Parking / Camp Set-Up MATHEWS PRESERVE WEBELOS WOODS Camping will be on the West side of the open field area against the tree line. No camping.
Advertisements

Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Part 1 Lot 7 Concession 14 Southeast corner of Furnival Road + Gray Line 9.69 ac (3.92 ha) Adjacent to Port Glasgow TP Baxley TP Lakewood Trailer Estates.
5 Insurance Coverages Every Harbor Master Should Know.
Residential Building Codes and Preferences For the Designer Sleeping Area Architectural Design.
JUNO BEACH PEACE GARDEN PROPOSAL April 15, 2011 Presented by Terron & Megan.
BELLA LAGO Ft. Myers Beach,Florida. The following pictures on this presentation are photos taken of the apartment and the surrounding area. The following.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
March 2012 Radnor High School Parking & Circulation Improvement Opportunities.
Architectural Design Copyright Texas Education Agency (TEA) 1.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Pythagorean theorem PROBLEM SOLVING.
Where is RiverStone?. Most of Southeast within 500 mile radius Overnight truck shipping to significant portion of eastern US.
SPLOST (Special Purpose Local Option Sales Tax) Public Hearing August 12, :00 PM City Hall.
Fire Tax Remains at.505 Mills 2013 Fire Tax Remains at.505 Mills 2014 Fire Tax Increases to.655 Mills Increase of.15 Mills on the Fire Tax ($15.
Airport Procedures 101. #1 Arrive to the airport Many people take a taxi or get a friend to drop them off to avoid having to pay to park at the airport.
HunterMaclean A T T O R N E Y S A T L A W. Hutchinson Island Chatham County- Savannahs Public- Private Partnership.
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
Dauphin Island in Crisis A Proposal for Restoration of the P&BB Fishing Pier & Interim Shoreline Stabilization Working to Restore the Public Pier & the.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
1 Residential Design by the Rosellini Group, llc, copyright © 2007, all rights reserved THE WATERFRONT at FIDALGO BAY A Planned Mixed-Unit Development.
Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.
REPLACING EAST SIDE OF BRIDGE in WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here HOOD CANAL.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
Central-Wan Chai Reclamation
SEA RAY BOATS, FLAGLER MARINE CENTER ECONOMIC DEVELOPMENT INCENTIVES.
Driftwood Key Club Financial Presentation.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Mark Blaisdell TDJ 4M.  Rural or Urban?  Choosing a neighborhood – consider: Schools Parks and recreation Shopping Roads nearby – to and from work,
Tampa Bay Area Devin Taylor – s/v Moosetracks SSCA 2012 Florida West Coast Gam Isles Yacht Club October 23, 2010.
Fax: (01253) Tel: (01253) The Former Boococks Premises Coleridge Road off Talbot Road Blackpool.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Parking Instructors: Dr. Yahya Sarraj Dr. Essam Almasri.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
Fax: (01253) Tel: (01253) TO LET First Floor Offices 22 PLYMOUTH ROAD BLACKPOOL LANCS FY3.
Co-op Charting – Akron Power Squadron 2008 USPS – NOS Coop Charting Program - Chart Position Data Worksheet Method – DGPS(WAAS) Datum – WGS 84 Manufacturer.
2010 Akron Power Squadron Cruise Presque Isle Erie, Pennsylvania July 16 th thru 18th.
A NEW STORAGE OPTION FOR SMALL BOATS BOAT CENTRAL DRY STACK STORAGE MARINA DEL REY, BASIN H California Coastal Commission Hearing (January 9, 2015) Item.
Purpose of Meeting December 16, 2010  To update CBJ’s Auke Bay harbor users on status of master plan implementation for CBJ’s Auke Bay properties UPDATED.
Waterfront & Boating Access Summit Marina Projects October 14, 2006.
LUAS Cross City Brendan O’Brien Roads & Traffic Department.
Reuben E. Lee Restaurant (now removed) Island Prime Restaurant.
E X P E R I E N C E Y O U R A M E R I C A Relocation of the Bodie Island U.S. Coast Guard Station Complex at Cape Hatteras National Seashore Environmental.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
OPERATION TOMODACHI HA/DR 18 MARCH N 14154E N 14054E N E N 14015E – 3948N 13940E N 14001E N 14130E N.
1 Update on Economic Analysis for Cape Hatteras National Seashore P.O. Box · 3040 Cornwallis Road · Research Triangle Park, NC Phone:
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
Agenda Item F 16a Moriarty Dock Replacement 2782 Bayshore Drive, Newport Beach.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
Rebuilding the chimney next to the large group shelter.
Downtown Marina and Promenade January 8, 2008 Agenda Items 6.05 & 6.09.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
2017 Public Works Budget September 6, 2016 Donald J. Theisen, P.E. Director.
VIRGIN ISLANDS PORT AUTHORITY
Charlotte County, Florida
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
FCommerce A Perspective on Water Transportation For the NCR
National Defense University Fort Lesley J McNair, Washington D.C.
Crescent City Harbor District Solar Project Proposal
Marine Park Red Bank, New Jersey
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Campus Ministry Accessibility
10 TREK TRAILS North Walk-in-Water Creek North Walk-in-Water Creek
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Math Task Challenge   1. Frank Rd and James Rd. make a perpendicular intersection. The state wants to build a new road. The new road will intersect 3 miles.
Presentation transcript:

Cruz Bay Waterfront Plan Ferry Dock Alterations Main Parking Area Alterations Creek Alterations Enighed Pond Alterations Presented By Paul Devine Overview of Plan

Existing Waterfront View of Cruz Bay waterfront from the air

Areas Affected Alterations To Include Ferry Dock, Area Along Existing Parking Area Near Ferry Dock and Creek Area Ferry Docks, Creek and Enighed Pond Enighed Pond

Approximate Dimensions of Existing Dock Existing Ferry Dock-Approximately 150 ft X 50 ft Existing Dinghy Docks Ferry Boats Existing conditions Ticket/Waiting

Extended Dock and Building Extended Dinghy Dock Charter Boats New Marina Area-Overnight, short and long-term slips Dinghies General idea of new ferry dock area Enlarged Building All Ferries Moved To North Side of Dock

Alterations To Ferry Dock Area Extend existing ferry dock to twice its length Remove and re-install existing south dinghy dock to twice its length Remove north dinghy dock completely Install slips on north side of new dock Install new marina-type metered shore power with water Install new dumping station at far west end of extended dock Allows new marina and more space for ferries Double width of existing ticket/waiting area and install Customs/ Harbor Master/public bathroom addition Install Additional lighting at dock and dinghy dock areas Provides income to PA through hook-up fees

Extended Dock and Building Approximately 300 ft X 50 ft Existing retail area Extended dinghy dock/charter boat space approx 150 ft Optional dock Extended dock Slips Slips shoreline Optional Dock Shore Power/water for each slip Marina with optional dock Enlarged ticket/waiting/customs building Extended room for additional ferry boats

New Dock At Ferry Area Existing Ferry Dock The “Battery” Area Existing Ticket/Waiting Area New Dock w/Vendor and Fish Market areas Allows for new St. John Fish Market Existing Parking area Existing Roadway

New Dock At Ferry Area Extends the length of the existing parking area and is at least 35 ft wide Is well lit and has provisions for electric and water/sewer hookups for vendors and fish market Provides immediate access to vendors upon arrival of visitors Allows Park to be used for intended purpose-beautiful grounds, rest and relaxation Provides a better visitor first experience Provides vendor area and better visitor experience Provides income to PA through vendor space rental fees

Main Parking Area Outline To “Creek” Existing bathrooms and Customs areas Existing vendor areas Existing area Existing Openings

Alterations to Main Parking Area Remove existing bathroom entirely Remove Customs and Harbor Master building Remove existing vendor buildings, build new vendor area at corner Infill existing boat ramp Install parking area lighting Install new bulkhead from infill area to Creek bulkhead to create continuous waterfront break Provides a dedicated taxi parking area close to ferries (waterfront parking to remain) Provides more parking and dedicated taxi area Provides 40 additional Parking spaces Provides a larger Carnival area Provides PA with income from vendors

Renovated Main Parking Area Adjoins “Creek” Area Renovated Main Parking Area The “Battery” Area Taxi Parking Area only New opening Public parking New opening In-filled ramp Relocated Vendor Area Existing opening to remain Waterfront Roadways Existing P.O.

The “Creek” Area Add new dock- 200 ft X 20 ft (NTS) Slips New dinghy dock Main Parking Area Parking Parking New possible marina with TSA incorporated New Public Bathrooms, Customs, Harbor Master Building Continuous access to Main Parking Area NPS Area All fencing removed

Creek Renovations Provides a new dock with provisions for a 40 boat marina Provides new Customs, Harbor Master Building (TSA requirements remain intact) Provides bathroom facilities for public and boaters Provides additional 20 parking spaces PA collects fees from overnight and short-term boats Allows continuous parking to Main Parking area Provides additional revenues to local businesses Advantages Allows greater access to NPS facility

Enighed Pond Barge Area Secondary Barge Docking Proposed Harbor Master Bldg. Optional Area For International Ferries Road Primary Barge Docking Area Mangrove Alternate Ferry area Spoils Area Entrance Road

Alternative Enighed Barge Area Line of old break/dike New Dock w/ticketing Contant Area Buoys arranged for Barge and Ferry Traffic Road Enlarged view Mangrove

Alternative Enighed Barge Area Optional ferry docking Line of old break/dike New Dock w/Ticketing Contant Area Buoys arranged for Barge and Ferry Traffic Road Enlarged view Mangrove

New Enighed Dock Provides new dock and ticketing area for international travel Frees Creek area of large boat traffic, allowing for marina Proposed new Enighed Harbor Master building could also be Customs The new dock can be up to 250 long

Proposed Enighed Parking Area Barge Area Relocated Harbor Master/Customs w/Public Bathrooms General location of spoils area Dedicated Taxi Area 150 Parking Spaces Proposed entrance/exits

Alternate Proposed Enighed Parking Area Fenced walkway to ferry dock Barge Area Customs/TSA/Ticketing Relocated Harbor Master w/Public Bathrooms General location of spoils area Dedicated Taxi Area 150 Parking Spaces Proposed entrance/exits

Enighed Pond Area Parking/Buildings Re-locating Harbor Master/Bathrooms would provide public facilities. (The public cannot enter a TSA area) Grouping Customs/Ticketing would provide a secure TSA area International travelers can purchase tickets and go through Customs Dedicated taxi area would provide immediate transportation New parking area would allow short and long-term parking for international travelers and local parking Customs close by would allow greater ease of checking of imports

Questions and Answers