Capacity Market Code Modifications

Slides:



Advertisements
Similar presentations
Review of industry code governance 26 March 2010.
Advertisements

The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
CLOSURE OF THE EQUAL PROGRAMME - FINLAND Tommi Nordberg Warsaw EQUAL Baltic Sea Seminar.
T&SC Modification Proposal: Clarification of Outturn Availability
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Public Consultation : main conclusions (1/2)
Resource Cost Working Group
2017 Bankruptcy Rules Revisions
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Preparation for ITU Council 2016
New SEN Framework Presentation to the Joint Consultative Forum 17 May 2017 By Sharon Lawlor ED1/17/75799.
Transitional Exit Capacity Proposals -Update
EU Tariffs Code Update Based on Refined Draft as of 30th October
Proposer: Matthew Hatch Panel Date: 20/10/16
Exit Capacity Release Methodology Statement
Capacity Conversion – 616s
Annual Review of Shrinkage and Leakage Model
EU Implementation Programme
Transmission Workgroup 7th July 2011
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Introduction of Code Contingency Guidelines Document
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
CHALLENGES TO VOTER REGISTRATION APPLICATIONS AND REGISTERED VOTERS
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Financial Instruments under the ESF State of Play & Implementation
TSC Modifications Panel Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
Implementation Network Codes: status update
Practical Challenges and Remedies – Pre and Post Insolvency Resolution Process January 8, 2019.
MOD_09_18 Interim Credit Treatment for Participants with Trading Site Supplier Units 13th March 2018.
Code Administration Code of Practice
Procurement Planning Mani Ram Gelal
Modification 0117 – Additional Considerations
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Interim Suspension Delay Periods
Rebecca Hailes For 15 March 2018
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Introduction of Code Contingency Guidelines Document
Capacity Market Code Modifications
LTSEC Auction Timetable
Further Credit Modification Proposals
Protocol for submission: Deadline 1-APRIL-2019!
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Generic Revenue Driver Methodology
Capacity Market Code Modifications
The WTO-Agreement on Import Licensing
Optimisation of Entry Capacity Modification Proposal
Capacity Market Code Modifications
Modification 0043 – Limitation on offering for sale unsold capacity
Capacity Market Code Modifications
You must dial-in on a phone line for the webinar audio U. S
Modification Proposal 136
Capacity Market Code Modifications
Gas Customer Forum 28 July 2008
Appeal Code Changes Delynn Coldiron, City Clerk; Brad Yatabe, Legal
DSG Governance Group Recommendations.
Budget and Legislative Request
Capacity Market Code Modifications
Presentation transcript:

Capacity Market Code Modifications Working Group 6 23 May 2019

CMC_05_19 – Housekeeping Changes Trivial removal of cross-reference duplications, except for change to F.5.1.2(b) Lack of clarity between setting of exchange rates for FAIP between F.5.1.1 and F.5.1.2(b) raised by Monitor F.5.1.1 The System Operators shall calculate the final Annual Capacity Payment Exchange Rate […] to be included in the Final Auction Information Pack. F.5.1.2 The System Operators shall use reasonable endeavours to publish the Final Auction Information Pack for a Capacity Auction by the later of: a) […]; and b) two Working Days after the last of the date the Regulatory Authorities provide the Demand Curve and approval of the final Annual Capacity Payment Exchange Rate […]. Addition to the text (in red) clarifies that while SOs determine the Exchange Rate, it is approved by the RAs and this approval forms one of the triggers to publish the FAIP.

Modification Timetables Event Date 1 Modifications Proposal Submission Deadline 09/05/2019 2 Deadline for RA Rejection of Modification Proposals on the grounds of being Spurious. 16/05/2019 3 CMC Modifications Working Group 6 23/05/2019 4 As per the CMC (B.12.7.1 (j)) the System Operators shall prepare a report of the discussions which took place at the Workshop, provide it to the Regulatory Authorities and publish it on the Modifications Website. 31/05/2019 5 Publication of Timetable for RA consideration, consultation and decision relating to Modification Proposal(s). 06/06/2019