UAA-School of Engineering Civil Engineering Department

Slides:



Advertisements
Similar presentations
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Advertisements

January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Curriculum Maps Margaret Kasimatis, PhD VP for Academic Planning & Effectiveness.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Assessment of Undergraduate Programs Neeraj Mittal Department of Computer Science The University of Texas at Dallas.
CEM-512 Value Engineering Highway Project: South Interchange.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
1 UCSC Computer Engineering Objectives, Outcomes, & Feedback Tracy Larrabee Joel Ferguson Richard Hughey.
1. An ability to:  Understand the academic requirements you need to obtain your degree  Calculate your GPA  Prepare a draft schedule 2.
Mohammad Alshayeb 19 May Agenda Update on Computer Science Program Assessment/Accreditation Work Update on Software Engineering Program Assessment/Accreditation.
ABET Accreditation Board for Engineering and Technology
Capstone Design Project (CDP) Civil Engineering Department First Semester 1431/1432 H 10/14/20091 King Saud University, Civil Engineering Department.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
OBE Briefing.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
ABET’s coming to Rose! Your involvement Monday, Nov 5, 2012.
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
Overview of the Department’s ABET Criterion 3 Assessment Process.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Grade separation.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
1 INTERCHANGE SELECTION CE 550 SPRING OBJECTIVE Identify types of interchange by function and geometry Learn process for optimizing the type of.
1 Urban Intersections Slides prepared by Dale S. Harrington, P.E.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Cross Cutting Initiatives - Education William E. Kelly Professor of Civil Engineering The Catholic University of America.
Design of a Typical Course s c h o o l s o f e n g I n e e r I n g S. D. Rajan Professor of Civil Engineering Professor of Aerospace and Mechanical Engineering.
Copyright © 2011 by ABET, Inc. and TMS 1 December 2, 2008 ABET Update UMC Meeting April 6, 2015 San Francisco, CA Chester J. Van Tyne
Information Processing: Complex Risk Environments Topic 1 -- Characteristics of Expressways Topic 2 (through Lesson 1)-- Entering, Changing Lanes, and.
Copyright © 2014 by ABET Proposed Revisions to Criteria 3 and 5 Charles Hickman Managing Director, Society, Volunteer and Industry Relations AIAA Conference.
Engineering Standards in Capstone Design William E. Kelly Department of Civil Engineering The Catholic University of America Washington, DC ASEE.
Wilmer Arellano  Getting started  Syllabus  Objectives and Evaluation  Teams and Mentors  Topics Covered  Learning Outcomes  Exams Regulations.
University of Utah Program Goals and Objectives Program Goals and Objectives Constituents U of U, COE, ASCE, IAB Constituents U of U, COE, ASCE, IAB Strategic.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
By: Wilmer Arellano.  1. Form a team  2. Find a Team Leader  3. Find Three Potential Topics  4. Find a Mentor  5. Select a Topic.
Where is it?   From Houston (Bush Intercontinental Airport): Take John F Kennedy Boulevard south (going toward I-45) to Beltway 8 west ramp. Stay on.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Department of Electrical and Computer Engineering ABET Outcomes - Definition Skills students have graduation.
Arizona Forward Update
Continuous Program Improvement
UNIT 3 Foundations of Effective Driving
Secor Road Reconstruction Project Public Meeting #2
OUTCOME BASED EDUCATION
The I-465 West Leg Reconstruction Project
Design V Prof. Jill Bouratoglou
Project Management Team Meeting #3
Interdisciplinary teams Existing or new roadway
Accreditation Board for Engineering and Technology
Signs, Signals, Markings & Speed Limits
Class Agenda Capstone Design Project Process 10 min
The Highway Transportation System. (HTS)
Traffic Signs The general principle of traffic signs is to make a message known quickly, (70mph) accurately, with minimum reading skills required. This.
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
Proposed Revisions to Criteria 3 and 5
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Department of Computer Science The University of Texas at Dallas
Double Crossover Diamond Interchange
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Technical Committee on Geometric Design
Assessment and Accreditation
Materials and Manufacturing Engineering
Contract 60X10 Informational Meeting Weber I-55
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
Metropolitan District | mndot.gov
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

UAA-School of Engineering Civil Engineering Department Osama A. Abaza Prof. & Department Chair 5/28/2019

UAA-School of Engineering SoE New Building Prof. Orson Smith SoE Interim Dean 5/28/2019

Graduate Programs in Civil Engineering Masters of Science in Civil Engineering Masters of Civil Engineering Master of Science Applied Environmental Science & Technology (MS-AEST) Master of Applied Environmental Science & Technology (M-AEST) Master of Science, Arctic Engineering 5/28/2019 O. A. Abaza Civil Engineering Department

Graduate Programs in Civil Engineering Graduate Certificates Environmental Regulations and Permitting Earthquake Engineering Port and Coastal Engineering 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Senior Design Class 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Course objectives The course is designed to give the students the necessary knowledge and practical training in the implementation of multi-disciplinary engineering project in the field of Civil Engineering in partnership with the local community in a team environment. Principles of engineering analysis and planning are emphasized. Various other design practices are addressed. 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems CE A438 Course Description Capstone course in which civil engineering students collaborate in multi-disciplinary teams to design a complex civil engineering system that meets client needs while protecting public health and safety using knowledge and skills learned in their undergraduate curriculum. 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Student Learning Outcomes Ability to identify problems and opportunities, develop related engineering design criteria, and formulate alternative solutions to meet client needs while protecting public health and safety using knowledge and skills learned in the civil engineering undergraduate curriculum Ability to function effectively on multi-disciplinary teams engaged in collaborative and iterative design of a complex civil engineering system with conflicting technical, social, economic, and aesthetic objectives Understanding of the professional, legal, and ethical responsibilities of practicing civil engineers Recognition of the need for and ability to engage in life-long learning in the context of civil engineering professional practice Ability to communicate effectively with engineering drawings and technical visualizations, construction specifications, written technical reports, and public oral presentations 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Organization and communication paths for SeaWolf Engineering 2012 Course Structure 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Class Deliverables Interim draft, final draft, and final Design Study Report (DSR) including (group work): o Descriptions of investigations, analyses, and findings o Evaluation of alternatives o Recommendations Construction plans for recommended alternative, approximately 20 to 65 % detail depending on project nature (group work) 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Formal presentation 27 April 2012 All students in the course will participate in a formal presentation of investigations, findings, analyses, illustrations, designs, evaluations, and recommendations at a venue to be determined. A panel of professional engineer reviewers not previously involved in project formulation will provide written evaluations of the report and presentation. 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems Projects 1. New Seward Highway- Highway to Highway 36th to 20th ADOT&PF 2. Manitoba Ski Area Reclamation Project Mountain Rider's Alliance 3. Chukchi Sea Monitoring Station ConocoPhillips 5/28/2019 O. A. Abaza Civil Engineering Department

Design of Civil Engineering Systems New Seward Highway- Highway to Highway 36th to 20th ADOT&PF 5/28/2019 O. A. Abaza Civil Engineering Department

NSH Alternative - Elevated Highway ELEVATED EXPRESSWAY (E) NSH (E) NSH * Continuously elevated lanes running atop bridgework supported in the center median of the current NSH Elevated expressway would dominate the skyline and block panoramic views of the Chugach Mountains east of the city. Snow removal would be difficult. Expensive to build. Civil Engineering Department

NSH Alternative – Depressed Cross Street New Seward Highway Cross Streets Depth -36th Avenue -Benson Blvd -Northern Lights -Fireweed (varies) * Major cross-streets to pass beneath NSH The steep walled nature of each depression would result in loss of access to businesses adjacent to NSH and for a significant distance along the length of each cross-street Civil Engineering Department

(Northbound/Southbound) NSH Design Cross Streets Depth (~ 24 or 25’) Frontage Frontage Main Hwy – 3 lanes ea. (Northbound/Southbound) (2 lanes) (2 lanes) * NSH would be depressed with cross streets to remain at current grade Neither NSH nor the cross-street bridges would rise above grade to present an unpleasant industrial aspect or conflict with suspended utility lines Future expansion would be easily attained due to the wide central median and lane space on the collector roads Civil Engineering Department

36th Avenue Alternative NSH NSH 36th Ave 36th Ave Requires one set of Traffic lights at intersection NSH 36th Ave 36th Ave WEST EAST NSH * Single Point Urban Interchange (SPUI) Allows opposing left turns to proceed simultaneously by compressing the two intersections of a diamond into one single intersection No significant improvement in traffic flow in this intersection with the design traffic load Civil Engineering Department

36th Avenue Alternative * Partial Cloverleaf ( Parclo ) Uses arrangement of loops and signalized ramps as needed for effective traffic flow Requires more land than other options Negative impact to local business due to Old Seward change to One- Way No significant improvement of traffic flow when modeled Civil Engineering Department

36th Avenue Alternative Double Diamond Intersection Traffic switches sides across bridge Allows smooth transitions between freeway and cross-streets Performs well at projected traffic levels Requires minimum expansion of ROW Civil Engineering Department

NSH and 36th Intersection Civil Engineering Department

Civil Engineering Department

UAA-School of Engineering Civil Engineering Department Contacts: O. A. Abaza UAA-School of Engineering Civil Engineering Department 3211 Providence Drive Anchorage, AK 99508 Email: afoa@uaa.alaska.edu Phone: 907-7866117 907-7861951 Civil Engineering Department