2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.

Slides:



Advertisements
Similar presentations
GIS and BIM Integration: Business Level Framework
Advertisements

Dynamic Systems Development Method (DSDM)
Iterative development and The Unified process
THE CHALLENGE TO PROVIDE EDUCATION TO THE CONSTRUCTION INDUSTRY IN A RAPIDLY CHANGING ENVIRONMENT 1 April 2010.
Prototype Evidence-based Database for Transportation Asset Management Janille Smith-Colin, Infrastructure Research Group 2014 UTC Conference for the Southeastern.
The BIM Project Execution Planning Procedure
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
Publish Your Work BIM Curriculum 04. Topics  External Collaboration  Sharing the BIM model  Sharing Documents  Sharing the 3D model  Reviewing 
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.
Technical Committee on Electronic Engineering Data.
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
Introduction to Making Multimedia
Clinical Collaboration Platform Overview ST Electronics (Training & Simulation Systems) 8 September 2009 Research Enablers  Consulting  Open Standards.
1 Getting Started : Purposes of IS Strategic Planning.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
1 VISSIM Protocol ITE Oregon Traffic Simulation Roundtable May 31, 2012 Chi Mai.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Lesson 3-Multimedia Skills. Overview Members of a multimedia team. Roles and responsibilities in a multimedia team.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
 System Requirement Specification and System Planning.
® Hosted by IIT Bombay Department of Science & Technology Sponsored By OGC Land and Infrastructure InfraGML Proposal: OGC r1 87th OGC Technical Committee.
Incoming Themes for 2017 Frank Kelly, USGS
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
2017 Education Series – NCHCA/CEO/City of Ottawa February 24, 2017
Project Execution Planning for Building Information Modeling
Knowledge-centric Plant Information Model
Fundamentals of Information Systems, Sixth Edition
Refine the HR Organizational Structure and Optimize Department Efficiency Whether your organization is requiring you to grow or asking you to cut down.
Project Board Meeting.
SAMPLE Develop a Comprehensive Competency Framework
Project Execution Planning for Building Information Modeling
Vehicle to Infrastructure Deployment Coalition (V2I DC) & SPaT Challenge Overview January 8, 2017.
Stakeholder Engagement Plan: Background to Roles and Responsibilities
Victoria Australia (BUGVA).
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Case Study on Selection of a Work and Asset Management System
VERMONT INFORMATION TECHNOLOGY LEADERS
Vision Facilitation Template
Chapter 10 Development of Multimedia Project
Brand New Edition! Field Test, AGC’s BIM Education Program and
AASHTO RESEARCH ADVISORY COMMITTEE PROVIDENCE, RI JULY 27, 2016
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Well Identification Industry Meeting
Professional Services at FAS June 9, 2014
CLINICAL INFORMATION SYSTEM
FDG-PET/CT Technical Committee
Automating Profitable Growth™
Your Facility Your Information
Continuity Guidance Circular Webinar
Community Involvement Training
Multi-agency Safeguarding Adults Policy and Procedure
3D data transforms the complete building lifecycle with Scan to BIM or 3D Scanning Services3D Scanning Services Point Cloud Scanning Services Scan to BIM.
United We Ride United We Ride….
Final Design Authorization
Project overseer Song Yanqin May 11, 2004 Honolulu
TITLE Business Case YOUR LOGO BUSINESS CASE PRESENTATION 00/00/0000
FDG-PET/CT Technical Committee
Model-Based Design and Construction: the UDOT Experience
Rebecca Embacher(MnDOT) Advanced Materials and Technology Engineer
Report of the Technical Subcommittee
Automating Profitable Growth
Project Management Method and PMI ® PMBOK ® Roles
IEP Improvement Project Proposed Recommendation Summary
CDM v Asset Lifecycle Health and Safety Management
Wide Ideas Idea Management Software Idea Management Process
TECHNOLOGY INFORMATION TECHNOLOGY. IT DEFINITION Stands for "Information Technology," and is pronounced "I.T." It refers to anything related to computing.
Presentation transcript:

2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of Transportation

IA 196 at the Raccoon River

IA 196 at the Raccoon River

I-35/US 30 Interchange

The Next Step The move to 3D design opens a number of exciting possibilities for transportation agencies. Renderings Virtual Reality Augmented Reality Interactive animations Intelligent Plans\Building Information Models Electronic As-Built Asset Management Images courtesy of VPN Engineering taken from the October 2013 edition of Underground Construction magazine article entitled; “Augmented Reality’ Peers Below The Surface: Technology Could Revolutionize Underground Engineering, Design and Construction” by Jeff Griffin with contributions from Mark Wallbom of United Imaging Technologies.

Joint Technical Committee on Electronic Engineering Standards Chair: Michael Kennerly: Iowa DOT Vice Chair: Jennifer Lloyd; TDOT Joe Squire: Oregon DOT 17 State Transportation Agencies 2 Consulting firms (HDR, CDM Smith) Bentley Autodesk Trimble AGC

Goals of the Committee Identify the data that needs to be transferred at various stages of project delivery, construction, maintenance and asset management. The goal is to ensure data can be transferred seamlessly, thereby minimizing rework, and ensuring that agencies and our industry partners have the information they need to effectively and efficiently manage these transportation assets throughout their lifecycle.   The industry has long recognized the need for a non-proprietary or open file format that ensures interoperability and is accepted as the industry standard. Although several non-proprietary and open formats have been developed no single standard or group of standards have been adopted.  The goal of the committee would be to develop and recommend a plan to adopt and industry standard. Conduct a synthesis of best practices on implementing 3D infrastructure information models. The synthesis should focus on the issues associated with creating 3D models and progressing from models that are for information only to models that are the controlling document and serve as a source of data for asset management

JTCEES Work Plan Conduct a survey to determine where we need to focus our efforts and where the industry is headed. Develop guidance on level of detail, level of development, and level of accuracy in a model centric environment. Recommend direction for enhancing interoperability Develop guidance on an electronic\intelligent plan of Building Information Model (BIM)

Conduct a Survey of Needs Of Contractors Of DOT’s Of Equipment manufacturers of the industry Activity: Survey the AGC on information needs and issues associated with using the model for construction. Survey State Transportation Agency’s on the current state of the practice regarding the information they provide. Survey, or get feedback from equipment manufacturers on file type, size, format, and interoperability. Use: This information would serve as the foundation for recommendations to STA’s on how to structure their deliverables to minimize rework\adjustments required by the end user. This information could also be used by the group working on interoperability.

Plan Detail Level of Development Level of Detail Level of Accuracy   Activity: Develop outlines for a Level of Development specification or template, that STA’s can modify to fit their individual workflows and business model. I do not believe this effort has to nail down every detail because each agency will be different, but it should provide a framework that can be built upon that gives agency’s a jump start. The same would be true for outlining the role and connection with Level of Accuracy and Level of Detail. Use: LOD specifications are extremely important in the vertical industry because the teams or contractors and designers working on projects may not work together that often. Therefore, a common language and understanding of what is required and what needs to be provided at various stages of development among all those involved is critical to success.

Plan Detail If we take the approach I outlined previously in terms of the basic structure for LOD in our industry LOD is already somewhat defined by our current workflows, although they would need to be expanded upon to include detail and accuracy, and the model. LOD 100-Concept LOD 200-Prelimibary Plans LOD 300-Final Plans LOD 350-Specifificates, Estimates, Final Quantities, Tabulations Plan Notes, etc. (essentially PS&E) LOD 400-As Let Plans, which would include all addendums and changes after the plan was turned in for advertising LOD 500-As Built Plans This is also very important for STA’s when working with consultants in determining level of effort and defining deliverables at various stages of development.

Interoperability Use of TransXML Use of IFC Road Industry Solution Activity: Review the existing efforts by IFC, the work previously done for TransXML and what the vendors are doing to address interoperability. The key is whether it is IFC, TransXML, or a vendor led effort the objective is interoperability. The question is whether we want to make a recommendation as to which direction we should go as STA’s? IFC already has a lot of momentum internationally, the US is involved, and we share many of the same software vendors. We could simply allow that process to work its way through and adopt it once it is complete. However; if we do not believe that will meet our needs in terms of content or time frame, we could look at what it would take to expand TransXML to serve as an industry standard in the US. The other option would be to evaluate progress by the industry on interoperability and assume market forces were accomplish what we need.   Use: We need to establish a direction for STA’s that we believe will address our interoperability needs and move forward.

Electronic\Intelligent Plan\BIM Specifications Model of Record Platform Asset Management Activity: Outline the issues associated with providing an electronic model that can supplant the need for traditional paper plans, serve as the model of record and provide a seamless transition of data from design to construction to asset management. Use: The ultimate goal is a model that does not simply replace paper plans but serves and a transfer vehicle for data through the development process. It should have the ability to assign intelligence or attributes directly to the features that can be summarized in tabular form for bidding and can be updated through construction and ultimately harvested for asset management. One of the keys to success in any effort is to begin with the end in mind. As we look at all the other issues it is important to keep in mind or address how they would be influenced or impact the ultimate goal. Conversely, knowing the ultimate goal should influence how we address the other issues as well.

Questions