Preliminary Comments on the Draft Integrated Resource Plan 2018

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Key Factors in the Introduction of Hydrogen as the Sustainable Fuel of the Future John P Blakeley, Research Fellow Jonathan D Leaver, Chairman Centre for.
Hydropower Development: Experience of Nepal
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
An electricity strategy for South Africa Hein Reyneke Country Manager, South Africa October 2014 PCTI/ /CoB/MRP/79.
1 Clean Energy, A Strong Economy, and a Healthy Environment William J. Keese Western Governors’ Association June 1, 2007 European Insulation Manufacturers.
UDA: Global Warming.
Technologies of Climate Change Mitigation Climate Parliament Forum, May 26, 2011 Prof. Dr. Thomas Bruckner Institute for Infrastructure and Resources Management.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
International commitment on climate change Submission to Parliamentary Portfolio Committee on Environment 23 September 2015.
SANEA/NPC dialogue on energy in the NDP: Innovation and investment by the private sector Johan van den Berg Chair November 2014.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Socio-Economic Benefits of Renewable Energy
Just transition to a low carbon economy
Achieving Sustainable Development with Low Carbon Action Asia Pacific Carbon Forum Rakshya Thapa Regional Technical Specialist, UNDP Global Environment.
Communities Renewable Energy Study
DRAFT IRP Public Hearings Presented by Sisa Njikelana
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
Renewable Energy and SA GHG Emission Reduction System
International Renewable Energy Agency
New EGNRET Concept Notes
REFLECTED IN JAMAICA’S ENERGY POLICY
Portfolio Committee- Trade and Industry – 11 March 2015
Matthew Wittenstein Electricity Analyst, International Energy Agency
Earthlife Africa Jhb - Sustainable Energy and Climate Change Project
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Transition towards Low Carbon Energy Monday 12th June 2017
City of Cape Town New Urban Agenda
EIUG Energy Intensive Users Group Comments on the Energy Bill
Tara Caetano, Bruno Merven, Jesse Burton and Matthew Meas
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Hybrid Solar Wind Energy Storage Market to grow at 9%+ CAGR from :
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Opportunities in the Changing Energy System
Development of a Solar Water Heater NAMA Concept Belize
The SWA Collaborative Behaviors
Reforming the Energy Vision in New York State
NS4960 Spring Term, 2018 China: Expanded Renewables
BEIS Local Energy Team Stuart Chapman, Local Partnerships Manager
FFC Briefing to the Portfolio Committee on Energy
SOUTH AFRICAN INSURANCE ASSOCIATION
Presentation to the Portfolio Committee - Labour
The Electricity Distribution Industry
OUTLINE RE Programme Objectives Integrated Resource Plan
Gordon van Welie, President & Chief Executive Officer
PCE COMMENTS IRP 2018 HEARINGS
Happy Khambule Greenpeace Africa
Hearings on the draft Integrated Resource Plan 2018 (IRP)
The role that renewable energy can play in the regeneration of the South African economy PPGI BUSA Economic Indaba 29 January 2019 Gallagher.
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
SUSTAINABLE ENERGY SUPPLY
NUM WESTERN CAPE SUBMISSION ON IRP 2018
INTRODUCTION The main objective of SAREC is to promote the renewable energy sector in South Africa by acting as an umbrella body to the industry associations.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Mayors’ Commission on Climate Change
Mayors’ Commission on Climate Change
Presentation transcript:

Preliminary Comments on the Draft Integrated Resource Plan 2018 Niveshen Govender 17 October 2018 Parliamentary Portfolio Committee on Energy

Introduction SAPVIA welcomes the opportunity to present our preliminary comments on the draft Integrated Resource Plan (IRP) 2018 to the Parliamentary Portfolio Committee on Energy. The South African Photovoltaic Industry Association (“SAPVIA” or “the Association”) is a non-profit industry association that aims to promote, develop and grow the Photovoltaic (“PV”) sector as part of the wider renewable energy industry in South Africa. - Confidential -

Introduction Our understanding of the Draft IRP 2018. SAPVIA supports a power-system that: is based on the least cost – which allows the fiscus to be prioritized to Government’s core service delivery requirements; facilitates greater energy access at affordable prices – which creates and catalyses a nett gain of jobs anticipated by the energy transition and; encourages economic stimulation through localization and manufacturing - Confidential -

Introduction In support of the announced Presidential Infrastructure Plan, renewable energy will be a sector that will help stimulate the economy through the provision of low-cost, low-carbon electricity that has a sustainable energy demand to support. Wind and solar in partnership with gas and battery storage can provide the stimulus for the growth of the Green Economy. (water reclamation; intensive farming, agri-processing etc) The global energy transition makes economic sense with its investment and shift to low-carbon technologies and solid socioeconomic footprint. The NDP specifically articulates the need for South Africa to decarbonize its economy, and the latest IPCC has highlighted the need for governments to take urgent and decisive action to combat the current trajectory of global warming. The inclusion of a policy constraint on greenhouse gas emissions, in line with our commitment to the Paris Agreement is supported. - Confidential -

General Comments on Draft IRP 2018 SAPVIA acknowledges and accolades the DoE on achieving a draft IRP where; the approach was rational in nature, the least cost scenario were considered as a basis, the growth forecasts were more appropriate, the transparency was far greater that previous versions, the clearly defined scenario descriptions were presented, and “value for money” could be seen through the costing of scenarios The flexible approach proposed through frequent reviews of the IRP to manage the pace and scale of new capacity is welcomed. This flexibility is required to ensure that we do not plan for stranded assets. - Confidential -

General Comments on Draft IRP 2018 Through our review process, we have considered a number of key questions which we would like to share with this Portfolio Committee on Energy; Decommissioning of coal-fired power stations linked to Air Quality Act requirements – though this requirement for at least 6 stations is mentioned, these stations are not reflected in the decommissioning schedule in appendix 6. What if the load availability is less than assumed in the IRP 2018 at 80% (currently at around 73,4% What if existing Eskom plants are decommissioned earlier than planned due to technical and/or environmental compliance requirements? What if Medupi and Kusile come online later than assumed or if it is decided not to complete the remaining units of these stations? - Confidential -

General Comments on Draft IRP 2018 There is a “sunk cost” economic logic of Medupi and Kusile. The ability of the 2 coal IPPs being able to overcome the legal and financing challenges facing them to reach financial close. The affordability of the Eskom decommissioning plan being used for the IRP 2018 analysis. The medium-term system adequacy due to issues around the timing and availability of the new build assets and coal IPPs as well as primary energy constraints. Whilst the IRP forecasting in rational in its choices, we would like to point our a few optimistic assumptions in our opinion; A critical concern is that the IRP comments are to be submitted before publication of the ‘now delayed’ ESKOM MTSO Report. We request commenting on the IRP 2018 be extended to allow for the consideration. - Confidential -

General Comments on Draft IRP 2018 SAPVIA believes that there are several key disruptive risks that the IRP has not considered adequately: The effect of EV penetration on electricity demand The future deployment of battery storage The pent-up demand in the small-scale embedded generation (SSEG) market. SAPVIA is aware of the existing backlog at NERSA which will exhaust the entire allocation for the next 4 years. We would therefore propose Increasing the 2019 allocation for SSEG to 500MW and ramp up over the next 5 years Quantifying the backlog at NERSA awaiting approval and deal separately. - Confidential -

General Comments on Draft IRP 2018 Aspects not detailed in the modelling: SAPVIA’s view is that this detail is important in better understanding the contribution of solar PV Cost and technical parameter tables (“as used” in the model) are not made available – cost assumptions for Solar PV fixed tilt and tracking are expensive and out dated The recommended plan does not report energy shares (only capacity) which makes it difficult to assess how much gas volumes are required in the recommended plan Very conservative assumptions make the cost differential between scenarios seem smaller than they are Very high costs assumed for the grid connection of renewables, very low costs for coal/nuclear Very low-cost reduction assumed for renewables until 2050 - Confidential -

Specific Comments on Draft IRP 2018 The Renewable Energy Independent Power Producer Procurement Programme; The programme achievements are clearly reported by the DoE’s IPPO The 2-3 year delays have devastated the industry as a collective - this has not been an issue of policy, but rather an issue of implementation Unfortunately, it has been local development and manufacturing companies that have borne the brunt of these delays. At least 4 solar PV manufacturing plants have opened and closed its doors over the last 5 years, and many electronics component factories have shut down lines. Greater policy commitment is key to the survival of the industry and the attraction of foreign investment. - Confidential -

Specific Comments on Draft IRP 2018 The Renewable Energy Independent Power Producer Procurement Programme; The 2023-2024 GAP in the roll out of both Solar PV and Wind provides little confidence to investors and local payers entering this industry. - Confidential -

Specific Comments on Draft IRP 2018 RECOMMENDATION We request clarity on the 1800MW determined by the Minister of Energy for round 4.5 turned round 5 which is not evident in the IRP 2018 draft We request clarity on the awarded SPP projects which are not committed or allocated in the Draft IRP 2018 To create the viable market that RE is capable of, consistent commitment is required year on year. We propose an even distribution of the Solar PV allocations over the next 12 years until 2030 thereby eliminating the 2023-2024 vacuum We propose additional comments be considered post the release of the Eskom Medium Term result projections and that the situation around the Coal IPP, be evaluated and a decision of their future be made. The Renewable sector is the only one, with the ability for accelerated uptake, and this should be noted as an optimal path in the IRP - Confidential -

Specific Comments on Draft IRP 2018 Small Scale Embedded Generation 1 to 10 MW SSEG creates an opportunity for greater local participation beyond the current supply industry model. It stimulates economic activities in the manufacturing sales and installation of renewable energy products. Commercial and residential customers are now able to realise savings from monthly electricity bills. It encourages new innovative ideas in the manner of how electricity distributors service their customers (new revenue streams) We believe partnerships between utilities, individual customers and private businesses reduce the impact of electricity costs and enhance job opportunities. - Confidential -

Specific Comments on Draft IRP 2018 Small Scale Embedded Generation 1 to 10 MW We need to consider the distribution infrastructure which will deal with the cost of unserved energy, forecasting and maintaining the demand and supply balance, and the location of generation. SAPVIA believes that municipal owned renewable energy connected directly to their grids, renders energy dispatchable and will be of significant benefit to municipalities to reduce the cross subsidy required for the low-income residential sector. SSEG renewables coupled Energy storage will alleviate the expensive ramp-rate issues. - Confidential -

Specific Comments on Draft IRP 2018 RECOMMENDATION In the attempt to quantify this market segment, SAPVIA requests the SSEG allocation viewed as a tracking placeholder rather than a CAP. The market should not be constrained. We propose a 500MW allocation that is escalated over five years and will be instructive in informing the supply and demand balancing requirements, as well as informing future modelling of IRP revisions. There should be a separate allocation across technologies for Municipalities that wish to generate and could be linked to NDP and IDP target expectations i.e on a percentage basis of total energy which is incremental. - Confidential -

Specific Comments on Draft IRP 2018 The job creation debate clarified; The combination of Solar and Wind creates 31% more jobs than coal - Confidential -

Summary Comments on Draft IRP 2018 SAPVIA believes that It is cost-optimal to aim for 85% renewable electricity share by 2050 Potential Policy adjustments required to achieve this; Promote RE Infrastructure in Declining Mining Regions Deploy new energy infrastructure where the old energy infrastructure will ramp down, retrain and migrate jobs gradually it is expected that higher tariffs will be compensated by reduced grid-integration costs thereby reducing overall costs; will make the socio-economic transition much easier Other Domestic Technologies (CSP, biogas, (pumped) hydro, batteries) should be flexible and dispatched by the System Operator Ramp down of the existing coal fleet must be done in a controlled manner Priority must be given to build new optimal mix (solar PV, wind, gas) SA could realise reduced carbon emissions and lead the African transition and create a low-cost, low-carbon energy hub. - Confidential -

Summary Comments on Draft IRP 2018 As an association, we value the opportunity to give our comments and contribute to improving the country’s energy system. We firmly believe in the Just Energy Transition path and actively promote transformation in the sector. In general, the success of this IRP plan depends on the restructuring of the industry which is currently unsustainable. Solar PV, wind and flexible power generators (e.g. gas, hydro, biogas, demand response, batteries, fuel cells) are the cheapest new-build mix for the South African power system from a pure cost perspective, no new coal, no new nuclear, any deviation from that would require a subsidy. In an uncertain world where electricity demand cannot be accurately predicted in the years ahead, and where disruptive new technologies are emerging, the IRP should also provide enabling flexible planning decisions of least regret. - Confidential -

Thank You - Confidential -