OmegaPS Users’ Group Meeting OUGM19

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
Jonathan Patterson Supportability Services Manager Pennant Canada OmegaPS User Group Meeting 12 November 2013 ILS and Performance Based Logistics: DND.
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
Honoraria for Design Build Projects Methodology Assessment Matrix.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
The Challenge of IT-Business Alignment
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
European Commission - DG Environment CBA in CAFE Cost-Benefit Analysis of the Clean Air for Europe Programme CLRTAP, TFIAM 28th session Haarlem, 7-9 May.
LSAR – Why Bother? Value Cases For Logistics Support Analysis Records.
Diploma in Procurement & Supply Business needs in Procurement & Supply Session 1 Business Needs and Procurement Decisions.
Training Module: APD Template County APD Process Training November 16, 2007 California Health and Human Services Agency - Office of Systems Integration.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Diploma in Procurement & Supply
Overview MRD Enterprise MRD Process
 P lanning is an intellectual process, consicous determination of courses of action, the basing of decisions on purpose, facts and considered estimates.
Introduction and Overview
The System Development Life Cycle
Information Technology Planning
Software Engineering — Software Life Cycle Processes — Maintenance
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
Project Cost Management
Projects, Events and Training
Analysis Manager Training Module
Cost Estimating Investment Planning and Project Management
Measuring Impact Guide
C. What is a Feasibility report
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
BANKING INFORMATION SYSTEMS
How to Run a Successful RFP
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
SAMPLE Develop a Comprehensive Competency Framework
Stephen Bauer NIDILRR Program Officer
Chapter 13: Setting a Direction for Information Resources
TechStambha PMP Certification Training
(Additional materials)
FEASIBILITY STUDY Feasibility study is a means to check whether the proposed system is correct or not. The results of this study arte used to make decision.
By: Hugh R. Alley August 22nd, 2007 Presenter: Maged Younan
2 Selecting a Healthcare Information System.
Infrastructure Cost Mitigation
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
© 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.
The System Development Life Cycle
Communicate the Impact of Poor Cost Information on a Decision
Communicate the Impact of Poor Cost Information on a Decision
Phase 2 Tollgate Review Discussion Template
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Software Measurement Process ISO/IEC
Communicate the Impact of Poor Cost Information on a Decision
Introduction and Overview
"IT principles" Context, roadmap
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Communicate the Impact of Poor Cost Information on a Decision
Enabling step change in your PPM Maturity
Systems Analysis and Design
What is Project Cost Management?
Understanding Buyers Copyright ©2017 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Phase 2 Tollgate Review Discussion Template
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Employee engagement Delivery guide
John Williams | Senior Procurement Specialist
Leading Into Our Futures
Time Scheduling and Project management
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

OmegaPS Users’ Group Meeting OUGM19

Graham’s New Car In February I bought a new car. I needed a new car I had a description of what it was to be like I had a top-end budget When looking at options, I balanced the price to buy with the cost to own. I considered supportability issues. Even in simple acquisitions we apply a business case analysis. Often this BCA is all about the best way to keep the new item at its desired operating level – sustainment.

Using OmegaPS Analyzer to Evaluate Support Solutions Graham Brum 8 May 2019

Introduction Asset acquisition and operation is a complex process that involves multiple government departments. It has 4 principles to be optimized to maximize value to Canada. It is too complex to present in this session – so I assume you have some awareness. Part of any decision making is always based on the owner’s cost to keep the new item working at its required level. The decision process is often referred to as a business case analysis (BCA). In this case a BCA for Sustaining the asset’s capability (SBCA) The goal of the Sustainment Initiative is to generate tailored solutions that maximize value to Canada through the optimization of the four principles: Performance – Defence equipment that is operationally ready and mission capable; Value for Money – The required outcomes (i.e. fit for purpose and quantity) are procured at a price commensurate with the market rate for comparable procurements; Flexibility – An adaptable and scalable support system that can readily be adjusted to changes in operational requirements and/or operating budgets; and Economic benefits – Leverage industrial benefits from defence procurements to create jobs and economic growth for companies in Canada. Departmental Divisional Structure The structure in each department associated with the SBCA Process (DND, PSPC, ISED, etc.) differs. Nevertheless, in each department a responsible Director will challenge and approve the outcomes and proposed recommendations of the SBCA analysis, and once agreed will sign the SBCA Report. The signature signifies concurrence with the: sustainment strategy/solution in DND, procurement strategy/solution in PSPC, Industrial and Technological Benefits (ITB) / Value Proposition (VP) strategy/solution at ISED. It also signifies approval to proceed to DPS Governance as applicable.

Presentation Topic Sustainment Business Case Analysis in DND uses OmegaPS Analyzer to enable the comparison of support options. Comparison is conducted using a number of key performance indicators. This presentation will present a comparative analysis methodology using the tool. UGM19 Program

The Tool? A thing used to help perform a job. Computing A piece of software that carries out a particular function, typically creating or modifying another program. In this work, OmegaPS Analyzer is the ‘software tool’ and business case analysis is the ‘process tool’. Together the two aid the practitioner in making good decisions.

Outline Purpose of comparative analysis. Processes to achieve required outcomes. Contractors and the SBCA Tools for cost analysis of alternatives Analyzer and cost analysis Scope of cost analysis approaches Problems with assessing alternatives This will be a fairly high level introduction to this topic. Not enough time for detailed explanation, however, will introduce you to the topic if it is new or provide discussion points if you have been involved in an SBCA.

Purpose of Comparative Analysis Comparative analysis is a well defined process used to generate: Preferred (balanced) solutions based on required objectives. Proposed solutions that meet Ao and LCC goals Cost estimates of preferred solutions. Alternative approaches and their costs for expected solution. The results substantiate the options Establishes a supportability baseline with respect to SBCA choice

Process To Achieve Required Outcomes Analyse historical data (i.e. DRMIS, op usage, HUMS). Review supportability baseline in OmegaPS LSAR (if exists). Establish “As Is” support solution baseline to initiate Baseline Comparisons (BCS). RFI/RFP data request from industry. Define Cost Breakdown Structure to be used. Identify costs to be assessed: cost drivers and differentiators. Develop desired support solution through government and industry engagement. Gap analysis (if modifying an existing system).

Contractors And The SBCA Process Canada works in collaboration with Industry for complex assets Contractors provide guidance to the SBCA process to ensure ‘realistic’ solutions are considered and compared. Information is requested through the RFI process. To be useful data that is relevant to the CAF/DND requirement should be provided.

Cost Analysis Tools CBS – Cost Breakdown Structure BCS – Baseline Comparison System DATM – Design Availability Target Model Alternatives assessment – Trade-off and Sensitivity Analyses LCC Bid Evaluation – comparative proposals TLAS – Through Life Availability Simulation

Part of Generic CBS

Basic BCS Life Cycle

LCC Comparison for ISS Alternatives

Using Analyzer – Data Set Up Enter support organization (baseline and desired). Identify operational usage and mission types. Build the CBS structure - import. Identify Cost and Rates to be included in assessment. Develop ‘generic/basic’ equipment structure for comparative assessment. DATM Ao allocation if required.

Using Analyzer – Data Review Receive engineering data as a proposed concept design. Integrate into baseline scenarios. Run LCC analysis. Run Ao Assessment in DATM. Run TLAS.

Scope Of Cost Analysis Approaches Simple – Eqp with one generic LRU; basic operations; Non-complex Complete Comprehensive

Problems With This Process Data not available – neither history nor proposed new solutions. Responses to RFI are not detailed (e.g. total cost for 5 years of support). RFP did not include LCC bid eval. Proposed system not fully representative of the real system. GFI data not accurate

Examples CBS – Cost Breakdown Structure spreadsheet BCS – Drone data set DATM – Drone targets based on early data Alternatives assessment – Trade-off and Sensitivity Analyses LCC Bid Evaluation – comparative proposal TLAS – Drone simulation (tomorrow’s workshop)

Thank You For Your Attention!