Forest Coordinator Training – Fieldwork and Backup Schedules

Slides:



Advertisements
Similar presentations
The essentials managers need to know about Excel
Advertisements

KompoZer. This is what KompoZer will look like with a blank document open. As you can see, there are a lot of icons for beginning users. But don't be.
Training Outline – Attendance Clerks
Using Data Dump to Export Data from StarPanel Purpose: Means of exporting data as Excel spreadsheet for manipulation outside StarPanel. Generally start.
Time & Labor & Absence Management Entering Time Worked Classified Employee Timesheet.
Made By:. This tutorial makes the assumption that you have already downloaded the “WV State Employment Calculator” Excel file to your computer and saved.
L.E.A. Data Technologies L.E.A. Data Technologies Introduction.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Microsoft ® Office Excel ® 2003 Training Sorting and Filtering Data MorningStar Education presents:
Review of Special Education Data Submitted for Cycle 7 Review of Special Education Data Submitted for Cycle 7.
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
To view the completion status of the members of your station or district, start by logging into the HFD Staffing web site. Click on Reports.
S9k Production Floor System Ingredient Inventory Production Inventory Production Dashboard.
Training Outline – Attendance Clerks
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
Enlisted Association of the National Guard of the United States Data Extract Instructional Guide.
General Navigation Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
ELMO 101: Data Collection ELMO Observer Training.
SchoolSuccess for Coordinators
Introduction to Powerschool Gradebook and tienet
I Travel Booking Training
ALIEF U TRACKING FOR ADMINISTRATORS
Sourcing Event Tool Kit Matrix Pricing & Tiered Pricing User Guide
Standard Operating Procedure
Global Youth Tobacco Survey (GYTS): Survey Implementation
Required Data Files Review
Data-Basics Training & Support
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Translation Jon Kolko Professor, Austin Center for Design.
Welcome to the Nevada Test Administration Training and Q&A Session
Formal Training Survey Tutorial
Standard Operating Procedure
Mail Merge Instructions (Yanick’s Version)
Sales Calling 101 Created by Cynthia Moore January 31, 2014
How to Use Members Area of The Ninety-Nines Website
Boeing Supply Chain Platform (BSCP) Detailed Training
Compliance Monitoring Activities State Inspections
Jessica Dare, Principal Consultant
Boeing 787 SCMP Training June 2016
MCAS Administration Training
Teacher Hand Scoring System for Interim Assessments
Overview & Basic Functionality
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
The Petroleum Registry of Alberta Energizing the flow of information
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
Data Upload & Management
2-1-1 Automated Verifications
California Automated Immunization Registry CASA Audit Process San Luis Obispo County Public Health Clinics Karen Turner, Regional Registry Coordinator,
Maryland Online IEP System Instructional Series - PD Activity #5
L.E.A. Data Technologies Introduction.
Climate Surveys.
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
Two methods to observe tutorial
Maryland Online IEP System Instructional Series - PD Activity #5
Forest Coordinator Training – Technical Terms & Proxy Codes
Interpreting the Fieldwork Schedule
Forest Coordinator Training – Preparing for Fieldwork
Welcome to Forest Coordinator Training
Reporting 101 Keenan & Mona.
Training Document Accessing Reports in VinCENT.
National Visitor Use Monitoring
Welcome to Forest Coordinator Training
Forest Coordinator Training Overview
National Visitor Use Monitoring
Using AIM (for Registered Students):
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
MTPD Technology Overview
Neonatal Workload Tool standard BOXI reports
Presentation transcript:

Forest Coordinator Training – Fieldwork and Backup Schedules National Visitor Use Monitoring Forest Service

Fieldwork Schedule Tells you when, where & what type of survey (interview, traffic counter, or combination) is required. The field work schedule is your friend! It tells you when, where, and what type of survey to prepare for. Please get out your fieldwork schedules for reference. If you don’t have one handy, there is an example of a fieldwork and a backup schedule in the files pod in Adobe Connect. You can click to highlight one or both of the excel documents and then click download files at the bottom of the file pod. I recommend not using the dropdown feature at the top of the file pod, as that will download the entire suite of shared files.

Take a look Grab your fieldwork schedule (and back-up) and lets take a look at it. Let’s take a look at your calendars. If you have a Survey Calendar handy, please take it out and follow along.

Information Includes: Region, Forest, District Sub-unit Month, Day, Year Site Name & Number Site Type Proxy or Non-Proxy Sample Strata Survey Time (AM/PM) Notes (special instructions for counters, timeframes, etc.) Looking from left to right across the top of the spreadsheet, each column contains important information about the survey, like the Region, Forest, District, and the Month, Day, and Year of the Survey. Looking down the left hand side of the spreadsheet, each row contains information about the specific survey at a specific site.

Decoding. Region & forest number – administrative info for interview forms and tracking. District name – provided to help coordinators sort survey workload by district. The first thing I do when I receive my fieldwork schedule is use filters to sort my data. You can do this by highlighting the column headers across the top of your spreadsheet and Clicking Sort & Filter and then Filter. Let me know if you need help with this and I can send you a screen capture of instructions. So now that you are looking at your survey calendar, let’s decode some of the column headers. Of course you are all familiar with the Region, and Forest Number, as well as the District names. As a NVUM forest coordinator or field interviewer, you can use a filter that I mentioned to filter the calendar by District to see only the surveys on a particular district.

Decoding.. Sub-unit If used, identifies which subunit the site belongs to. Subunits were identified in inventory design (don’t guess). When using back-up schedule, pay attention to subunit.

Decoding... Month, day, year– identifies the date of the survey. Site name & number – identifies the name/location of the site and number. Name needs to be put on forms exactly as listed in fieldwork schedule. Number is randomly assigned by system and could be the Infra #, but may not be.

Decoding .... Site Type– 5 different types DUDS – Day use Developed Site OUDS – Overnight Use Developed Site GFA – General Forest Area Wilderness – Designated Wilderness View – View Corridor

Decoding ..... Proxy Site Non-Proxy Site Actual counts are separate from interviewer surveys (typically fee sites) No counters needed Non-Proxy Site Automated counter set-up required Counter left out for 24 hours

Decoding ...... Sample Strata – based on exiting traffic volume Very High High Medium Low Not all forests will have all strata Not all site types will have all strata Strata and Use Levels were identified in inventory design (don’t guess)

Decoding ....... Survey time The time assigned for the 6 hour interview period. AM – 8 am to 2 pm (0800 – 1400) PM – 2 pm to 8 pm (1400 – 2000) Proxy sites have no AM or PM survey window – pick a 6-hour timeframe to catch highest exiting traffic volume. The survey period can be adjusted to ensure that interviewers are not out when it’s dark.

Decoding……… Notes There are four different entries in the Notes column: Blank Standard Protocol – Survey, Hand Tally and Traffic Count Set up Traffic Counter Only – 8am Start Placeholder day – if Unoccupied, Use Next Occupied Day as Substitute

Notes Blank cells = conduct standard protocol GFA Low days have two different notes: Standard protocol – interviews, hand tally counter, traffic counter Counter only – place the traffic counter out, but no interviews

Standard Protocol: Standard Protocol – Non-Proxy Set out counter Interview for 6 hours (AM or PM) Return to site 24 hours later and pick up counter Standard Protocol – Proxy Interviews for 6 hours (during peak exiting traffic)

Set up Traffic Counter Only: Set up traffic counter as close to 8 am as possible Do not conduct interviews Leave counter out for at least 24 hours Return and pick up counter

Placeholder Days Placeholder day – if Unoccupied, Use Next Occupied Day as a Substitute: Generally listed for group sites or recreation rentals. Site may or may not be occupied that day. Select the next closest day that the site is occupied to do interview.

Other Special Situations Recreation Rentals can be done on the phone Obtain contact info from reservations Contact visitor 2-3 days after they have left site Fill out the form as if interviewing them the day of their exit For all proxy sites – try to avoid zero days Reschedule interview day as needed

Questions… 1 Historically, there is a lot of confusion about the notes section and special situations

The Back-up Schedule May be needed if special circumstances warrant alternative survey days. Program Manager determines whether Back-up Schedule use is necessary.

When can you use the Back-up? Recreation Special Event – an event is planned at the site, and it is expected to change the use level (say from Low to High). Strategic Purposes – cannot possibly get all the equipment & interviewers to all the locations (do not use unless all other options have been exhausted). Sick Interviewer – interviewer is sick and no one else is available. Proxy Sites – we do not want any zero days for proxy sites (can use calendar or just select a different day).

When can’t you use the Back-up? Bad weather – go to site to see if anyone is there or just take the “zero” day. Fire closes the forest – a random event, same as bad weather days, note is on the DSF. No/Low/Heavy Snow year – same as above, go out to site to see if anyone is recreating. Site is closed and we thought it would be open – just the luck of the draw, take a “zero” day. One district has too many surveys – not designated for district estimates, just forest estimates.

How to use the Back-up? Use the site type and use level of missed day Find the site type in back-up schedule, then Find the use level or proxy code, then Pick the next available day If this causes logistical problems, can go to next day on list The replacement survey may not be the same site or the same district – that is OK – this is a forest sample!

Back-up cont. You can not “shop” for replacement days. Pay attention to subunit when selecting day. If there are no more days on the list, contact Don English.

How to fill in form…

Practice… Get your back-up fieldwork schedule Find a back-up for a DUDS Medium After April 7, 2018

Questions….. 1

Next… Preparing for Fieldwork Background Overview Resources Costs Technical Terms and Proxy Codes Fieldwork and Backup Schedules Preparing for Fieldwork Managing the Fieldwork Preventing Mistakes