Learning From Events Week

Slides:



Advertisements
Similar presentations
CETI Programme.
Advertisements

OHS Safe in the Knowledge Contact OHS on: The Compliance Consultancy Health Safety and Environmental Management Delivering the vision An incident.
Height Aware Campaign. Background Work at height Who the campaign is for What will happen Work at Height Regulations 2005.
Work at Height Regulations 2005
A Joint Code of Practice Objectives and Summary Presentation
A Free Resource From The presentation is from Mark Sutton For SAFEHANDS Health & Safety Consultants Ltd A Free Resource From
Safe work at heights This presentation assists Department locations to manage fall hazards in their workplace. The notes section in this presentation provides.
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
Working at Height Regulations Statistics 2003 / 2004 (HSE) 67 Fatalities 3,884 major injuries (2/3 of which were falls from below 2 metres.
Health and Safety Manual Section F9 Working at Height.
“Guidance on rescue during working at height” & their role within the “Working at height regulations 2005 Delivered by Daniel McNess Abseil Inspector /
Definition Hazard - Anything, any source or any situation with the potential to cause bodily injury or ill-health Risk – the likelihood that a hazard.
Risk Management (Safe Work Method Statements)
Health & Safety Risk Assessments.
W504 - Management of asbestos containing materials.
Health, Safety and Environmental Update July 2015 Purpose: The intention of this briefing is to pull together and share both Optimise and other contractor.
Hazard Identification
RISK ASSESSMENT AND MANAGEMENT
What you will learn in this session 1.Sources of information about health & safety, including national legislation or guidance and local policies 2.Work.
Hazards Identification and Risk Assessment
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Determining Controls for the Hazards Identified. Determining Controls Do all Controls need to be based on a Risk Assessments?
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Work at Height The New Regulations. BACKGROUND AND APPLICATION.
JOINS OSHA’S NATIONAL SAFETY STAND-DOWN TO PREVENT FALLS IN CONSTRUCTION JUNE 2-6, 2014.
Guidance on the Working at Height Regulations 2005 (amended). Delivered by Daniel McNess Abseil Inspector / Emergency Rescue Co-ordinator Severn Bridges.
V8 Working at height and the prevention of falls from vehicles.
MANAGING MANUAL HANDLING
Working at Height How to comply with the new Regulations.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
What you will learn in this session 1.Sources of information about health & safety, including national legislation or guidance and local policies 2.Work.
Overview Role and function of the Authority

Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
Welcome to Scottish Improvement Skills
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Ranjan kumar Assistant Manager CCL,Ranchi
Presented by Kevin Williams
Safety Systems & Practices for Project Delivery – The Hatch Way
Maintaining Safety Standards
Project Risk Management Case Study Commercial Construction
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Ensuring a safe workplace
HSE Update Lisa Skinner HM Inspector of Health & Safety
Maintaining Safety Standards
Risk management - HIRAC awareness presentation
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Fall Hazards.
Temporary Works Co-ordination
Technical Brief: Part 4 Task Briefing Sheet (TBS)
Presentation Title: View > Header & Footer
NR/L3/OHS/019-IP Work Instruction Briefing
Introduction In the first lesson we demonstrated the following:-
Health and Safety In Performing Arts For Schools
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
STFC Safety, Health and Environment (SHE) Codes
Safety is part of our culture at Halliburton
OHS–Occupational Health & Safety
Fall Hazards.
Leading Practice Implementation Guide
SAFETY STANDARDS FINAL JEOPARDY
Leading Practice Implementation Guide
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Fiscal policy program Presented by Cindy Draper, Fiscal Policy Officer – Training Days 2018 Introduce myself This session is to provide an overview of.
Effective Construction Safety Management
Fall Hazards.
Work at Height – Ladders and Step Ladders
Client duties on CDM Regulation 2015
Health and Safety Executive Work at Height and working with contractors Presented by Tony Almond Safety Topics Team.
Presentation transcript:

Learning From Events Week

Message from Innis Keith Head of Safety & Sustainable Development Please click the image to open the video. For improved video quality, you should download the video in advance and play from your desktop.

Working At Height We work or carry out activities at height more commonly than we sometimes think. The HSE classify working at height as: Any place where, if precautions were not taken, a person could fall a distance liable to cause personal injury. You are working at height if you: work above ground/floor level could fall from an edge, through an opening or fragile surface or could fall from ground level into an opening in a floor or a hole in the ground PRESENTER: This slide is designed to promote discussion around the various different activities we carry out where work at height may be involved. Explore working at height with your audience – Ask the audience to consider scenarios where they will work at height in a work context: On machines Flatbed lorries with deliveries Station Platforms Ladders Scaffolding MEWPs Working around excavations Working on Fragile Roofs Working on embankments Then consider activities outside of work which may involve activities/work at height: Ladders to wash the windows or access the loft Using step ladders to reach the top of the cupboard Standing on chairs to change a lightbulb Cleaning the gutters on the house Cutting trees or hedges in the garden How do our behaviours towards safety differ at home from the work place and how do we become consistently safe. As a presenter, you now have the audience in the headspace of ‘when will I be working at height’, the next slide will aim to explore how identify and control the risks associated with working at height.

Working At Height Hierarchy Avoid Working at Height Where possible, do not work at height for example by using extending equipment from the ground. During the design phase, deploy a drone to inspect structures instead of people working at height. Prevent Falls Occurring Collective protective measures (such as scaffolding) must be prioritised over personal protection (such as using a fall restraint harness). Mitigate the Impact of Falls Reduce the distance and consequences of a fall should one occur. For example use fall arrest systems or airbags.

Definitions Hazard Risk A hazard is something with the potential to cause harm. Risk Risk is the likelihood that a hazard will cause harm in combination with the severity of injury, damage or loss that might foreseeably occur.

Principles of Prevention Step 1 Step 2 Step 3 Step 4 Eliminate Consider how risks can be removed completely through planning or design. Reduce Consider examples where the risk has been replaced with a lesser hazard or lower likelihood of occurrence. Isolate Can a physical or engineering control segregate the hazard or insulate the exposed. Control Implement administrative controls to mitigate residual risk remaining only after considering steps 1-3 and documenting the thought process. Facilitators – Have 4 large sheets of paper, break your audience into 4 groups and spread them around the room. Give each group 2 minutes to write examples of controls under each category then move them on to the next item.

Safety & Risk Mitigation Log Risk Management Documentation Risk Assessments A risk assessment is an examination of what , in your work, could cause harm to people. It informs all other CDM documents. Network Rail The Construction (Design and Management) Regulations require certain documentation to be produced to allow for the identification of risk and the flow of information from planning through to work being carried out. There is a hierarchy of information which means that information should flow from one document to the other with the final outcome being a task briefing sheets that contains task-specific, relevant information for front line operatives in a clear and understandable format. RISK ASSESSMENT The starting point for any project should be a suitable and sufficient risk assessment. The risk assessment is the foundation of all other documentation. Without a good risk assessment it is impossible to produce a good, CPP, WPP or TBS. A risk assessment is required under the Management of Health and Safety at Work Regulations 1999. Specific risk assessments may be required depending on the works involved e.g. asbestos risk assessment, manual handling risk assessment. A risk assessment is a living document and should develop as the project develops. Risk assessments should also be reviewed regularly and following any unplanned events. PCIP The pre-construction phase of a project is controlled by the Principal Designer. They have an important role in influencing how health and safety risks are managed throughout a project. Think about the Principles of Prevention and the key decisions made in the pre-construction phase that can impact on safety? The Client and the Principal Designer should together produce pre-construction information and provide this to the Principal Contractor. Pre-construction information is any information already in the client’s possession or which can reasonably be obtained by the Client. The information must be relevant to the project and have an appropriate level of detail. It must be clear, concise and easily understandable. Similar to the Risk assessment the PCIP will develop as the design process develops and it must be updated as new information becomes available. It should be passed to the Principal Contractor to allow them to produce the CPP. CONSTRUCTION PHASE PLAN (CPP) The Client must ensure that a construction phase plan is drawn up by the Principal Contractor before the construction phase beings. The CPP is an overarching document for the whole project and should include information about the health and safety arrangements on site, site rules and specific risks and associated control measures. It is essential that a risk assessment is carried out which informs the CPP and ensures that all significant risks are identified and appropriate actions identified to reduce risk. The CPP should not include documents that get in the way of a clear understanding of what is needed to manage safety during the construction phase. The CPP must be project specific. WORK PACKAGE PLAN (WPP) Work Package plans are a requirement of the Network Rail standard for planning and managing construction work (NR/L2/OHS/0044) and should be prepared by the Principal Contractor. Work Package plans should be produced using information from both the risk assessment and CPP. The information in the Work Package plan should be specific to that package of works. Each WPP must be reviewed and updated throughout the construction phase to ensure it remains relevant and proportionate. The WPP should reference all task briefing sheets that relate to the package of works. TASK BRIEFING SHEET (TBS) • The purpose of the TBS is to provide the right information, to the right people at the right time. • TBS must contain information around the risks and control measures specific to the task and work location. • Information should flow from the WPP to the TBS. • The task briefing sheet must not contain generic or excessive amounts of information. • TBS must be provided to the work group leader at least a shift in advance. The flow of information to ensure that key risks and more importantly control measures are clearly provided to those carry out work. And a final reminder that RISK ASSESSMENT is the foundation of all of this. Without a good risk assessment you won’t get a good TBS and risks won’t be adequately controlled at site. Safety & Risk Mitigation Log PCIP Pre-construction information is reasonably obtainable information that is required to be provided to the Principal Contractor by Network Rail to allow them to prepare a Construction Phase Plan. CPP A Construction Phase Plan must be prepared by the Principal Contractor and will cover the whole project. It must include health and safety arrangements, site rules, and specific controls. WPP A Work Package Plan is required for individual packages of works and must be more specific than the CPP. It should be informed by the CPP and Risk assessment. Task Briefing The TBS is about getting the right information, to the right people at the right time. Produced at GRIP Stage 2 and maintained throughout the project, to record project risks and detail route of communication to interested parties.

03 04 05 06 07 Scotland Learning From Events Calendar - June Monday Tuesday 04 Wednesday 05 Thursday 06 Friday 07 Consider the availability of you and your team, how will you ensure you take time to attend a session during the week and how will you engage with the activities your contractors may have planned? Understanding Working at Height Controls George House Room 2.2 12 – 1pm Introduction to ALO St. Vincent St Room 7.1 2 – 3pm Air Pollution Impacts St.Vincent St Room 6.4 1pm – 2pm Close Calls Workshop, St. Vincent St. Room 6.6 11-12pm Operational Close Calls George House Room 1.1 11.30am – 12.30pm Safety Conversations (Culture Change Team) George House Room 1.2 1.30 – 2.30pm Air Pollution Impacts George House Room 1.3 10 – 11am Safety Conversations (Culture Change Team) St. Vincent St Room 6.2 12pm – 1pm Safety Conversations (Culture Change Team) George House Room 1.3 2.30 – 3.30pm Exec Safety Away Day Construction Managers Safety Conversations George House Room 1.3 10-11am (Culture Change Team)

03 04 05 06 07 LNE Learning From Events Calendar - June Monday Tuesday Across LNE there are a number of events which will allow an opportunity for you to take part in Learning From Events week. Not everyone will have the opportunity to attend everything in this week. If you feel like there is something that would benefit you and your team – contact your local LNE S&SD contact. LNE Learning From Events Calendar - June Monday 03 Tuesday 04 Wednesday 05 Thursday 06 Friday 07 Consider the availability of you and your team, how will you ensure you take time to attend a session during the week and how will you engage with the activities your contractors may have planned? Upskilling - Effective Safety Conversations and Direct Observation in Kings Cross Upskilling - Effective Safety Conversations and Direct Observation in Kings Cross Werrington – learning from events stand down LNE Renewals Exec – learning from events stand down PSU to be confirmed ECML Exec – learning from events stand down Open forum for PM’s in GSH, York

Safety Conversations Consider the content we have covered in this session and how it will inform your safety conversations. Attendance at the Safety Conversations training shown on the calendar slides will include the distribution of the materials shown to the right. Learning From Events Week is about considering out learning from previous events and ensuring we incorporate that learning into our safety conversations going forward to ensure we implement the lessons learned going forward.