WT CALL – 31/01/2018 2018-01-31.

Slides:



Advertisements
Similar presentations
ELEMENTS OF THE TRAINING CYCLE
Advertisements

RPS WG Update March 2015 Open Stakeholder Session Nancy Shadeed Health Canada.
Drive Your Order Management with GIS Optimizing Delivery of Service to Location Rodney Conger – Dave Lewis.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
GoSS PREPARATIONS FOR SUDAN CONSORTIUM Aggrey Tisa Sabuni Acting Under Secretary, MoFEP.
Edinburgh Shadow Strategic Planning Group Friday 19 June 2015 Welcome Back.
Omniran Backhaul representation in OmniRAN SDN model Date: Authors: NameAffiliationPhone Max RiegelNSN
Student and Faculty Technology Experiences: Research and Benchmarking
Open Transport Config and Control Project Agenda and Notes
T Project Review X-tremeIT I1 Iteration
Data Format and Data Centers
Healthy Ageing – Active Ageing II Conclusions
Draft whitepaper available
Provisional Architecture for oneM2M
ONF presentations to ETSI NFV Info Modelling Industry Status ONF Modeling Update 29 March 2016 Note that some points are related to the Multi-SDO Issues.
WT CALL – 04/10/
3GPP interworking in R3 Group Name: ARC
AIT III Project Progress Review #2 Lorton, VA
Software Configuration Management
April 2010 IASB Update SEMINARIO SOBRE NORMAS INTERNACIONALES DE INFORMACIÓN FINANCIERA SUPERINTENDENCIA DE ENTIDADES FINANCIERAS Y CAMBIARIAS Buenos.
Automated Interoperability Testing
WPM ad-hoc group report TP#24
WPM ad-hoc group report TP#25
Submission Title: [LB 28 Results] Date Submitted: [14 March 2005]
Ethernet PHY Information Model Clarification at OT IM
Feedback and Training Capsules
Discrete Manufacturing SIG Cost Sub-Committee
Committee of Experts World Intellectual Property Organization
NatRisk Project Web Site & Project Management Platform
Open Transport Config and Control Project Agenda and Notes
Automated Interoperability Testing
Open Transport Config and Control Project Agenda and Notes
Results of San-Jose meeting March 16-20
SysML v2 RFP Model-based Specification Approach
Data Stewardship Interest Group WGISS-44 Meeting
Colorado Plugfest Planning
NA4 Test Team Status Test meeting, 07/09/04
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Consideration of Modeling Evolution in ONAP Michela Bevilacqua Peter Wörndle and Tara Cummings 13 December , 2017.
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
P802.1CF NRM Discussions Abstract
IETF #99 Broadband Forum (BBF) YANG Update
Documenting ONAP components (functional)
New Alma Customer Onboarding Preparation and Best Practices
Status Update on API 16Q / 16R / 16F
Automated Interoperability Testing
Simplification of Lighting and Light-Signalling Regulations
IMT-Advanced Closing Report
ESB Networks Market Release Meeting of the IGG, April 16th 2009
Introduction to the MIABIS SOP Working Group
TGad July 2010 Editor Report
WG4: Standards Implementation Issues with CDISC Data Models
ETSI Standardization Activities on Smart Grids
PWG Plenary Status Report Workgroup for Imaging Management Solutions
TGaj Editor Report for CC22
Configuration Management
AANI SC Closing Report March 2017
PCS Technical Board 27th February 2018, Vienna.
Port Back Data Collection & Transition
Semantic Model Working Group
WT INTEGRATION IN BROADER ARCHITECTURE - for discussion -
Port Back Data Collection & Transition
Web-based Imaging Management Service WIMS Working Group
Vertical Applications Technical Advisory Group Liaison Report
Device Management Profile and Requirements
Introduction to Models, Interfaces, Guidelines & Tooling from ONF Open Information Model & Tooling (OIMT) project and ONF Open Transport Configuration.
Internet of Things (IoT) Work Group
WT CALL – 26/9/
WT Activities F2F meeting London, March 2018.
Project Name Here Kick-off Date
Presentation transcript:

WT CALL – 31/01/2018 2018-01-31

FACE TO FACE MEETING Face-to-Face meeting: March 12 - 16 @ London (Ciena) Logistic: https://wiki.opennetworking.org/display/OIMT/Face-to-Face+Meetings with the doodle pole (the logistic document can be accessed directly via OnfLondonMeetingInfo-version-4.docx). Possible agenda: Model and Management Interface definition: open issues of TR-532 for R.1.1 Management interface definition  target is to close open issues for the delivery of rel.1.1 and to have good discussion on management interface definition, 2) PoC 5: target content and possible date 3) ONAP: update of the status (SDN-R) and next steps 4) Joint sessions with TAPI and / or OTIM ?

F2F PARTICIPANTS 1 5 9 2 6 10 3 7 8 11 12 4

PoC 4.1 Updates on white Paper: - Proposal to skip white paper for PoC 4.1

MODEL (1) Proposal to have separated document for the ‘Generic Management Interface Definition’ (so the behaviour between the controller and the network element)  possibility to apply also to other technologies.  Updates on Requirements from operators (Telefonica)

MODEL (2) Feedbacks on Priority (Daniela)

PoC 5 It has been proposed to start thinking the next step (PoC 5) Possible content: ETH PHY model implementation Equipment model Core Model 1.3 Synchronization Integration with ONAP Based on ODL we need to track the content and the possible date for the PoC 5

THANK YOU