Tribal Data WG Fire and Smoke WG Oil and Gas WG

Slides:



Advertisements
Similar presentations
Uinta Basin Air Quality Study Kathleen Sgamma. Topics Covered  Background  Purpose  Timelines  Project Details  WRAP Phase III Oil & Gas Emissions.
Advertisements

Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS Technical Scope of Work: Tom Moore, WESTAR/WRAP on behalf of University.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
Technical Support System Review Board Meeting March 8, 2007.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
3SAQS Technical Committee Workshop Overview of updated schedule / deliverables related to ongoing 3SAQS technical work October 31, 2013 Tom Moore.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
WRAP/FEJF Phase III/IV Emissions Inventory Project WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February a – Presentation (a)
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Response to WRAP Air Managers Committee Memo “Request for Cost Estimates” April 6, 2009 WESTAR Council.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Overview of WRAP FEJF Work Products WRAP Workshop on Fire, Carbon, and Dust May 23-24, 2006 Sacramento, CA Darla Potter (WDEQ) & Mark Fitch (USFS)
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
2005 Progress on Emissions Inventories Attribution of Haze Workgroup Meeting January 24, 2006.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
Attribution of Haze Phase 2 and Technical Support System Project Update Combined Session – Emissions and Fire Emissions Joint Forums – Missoula, MT September.
Implementation Strategy July 2002
Visibility Coordinator Regional Haze
WRAP TSC/Co-Chairs Call Workplan Progress Update August 1, 2018
Regional Haze SIP Status Report
WRAP Workplan WESTAR (State Caucus) Recommendations and Action Items
WRAP TSC/Co-Chairs Call Workplan Progress Update August 29, 2018
Monthly Update on WRAP Workplan
Southern Sierra IRWMP Update
WRAP TSC/Co-Chairs Call Workplan Progress Update September 26, 2018
WRAP Regional Haze Progress Report & FEJF Projects/Budget
EPA Office of Air Quality Planning and Standards
WRAP TSC/Co-Chairs Call Workplan Progress Update October 31st, 2018
Upcoming projects* to support Regional Haze SIP/TIP planning
WRAP TSC/Co-Chairs Call Workplan Progress Update December 19, 2018
Adjusting the Regional Haze Glide path using Monitoring and Modeling Data Trends Natural Conditions International Anthropogenic Contributions.
Overview of WRAP 2014 Platform develop and Shake-Out project update
Adaptive Product Development Process Framework
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
2012 Spring Business Meeting Seattle, Washington
Western Regional Haze Planning and
Tribal Data WG Fire and Smoke WG Oil and Gas WG
TSS Project Update Attribution of Haze Workgroup/
Attribution of Haze Workgroup Organizational Meeting
Tribal Data WG Fire and Smoke WG Oil and Gas WG
timeframe in to be determined
TIBC Budget Formulation Improvement Project
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Air Resource Specialists, Inc. July 23, 2004
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Regional Haze SIP Status Report
Fire Emissions and Smoke Management Plans
WRAP Regional Haze Planning Webinar June 20, 2019
WESTAR (State Caucus) Recommendations
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Stationary Sources Joint Forum: Next Steps
Summary of RH-LTS Requirements (d)(3)
Technical Review Workshop
WESTAR Staff Reports Technical Coordinator Report
Status of Preliminary Reasonable Progress Analysis
Tribal Data WG Fire and Smoke WG Oil and Gas WG
EPA’s Roadmap for the Second Planning Period
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

Monthly Update on 2018-2019 WRAP Workplan May 29th, 2019 TSC and Work Group Co-Chairs Call Tribal Data WG Fire and Smoke WG Oil and Gas WG Regional Technical Operations WG Regional Haze Planning WG

Tribal Data Work Group

Workplan Progress by Tribal Data Work Group Workplan Progress over the Last Month National Tribal Forum on Air Quality: presentation/s; Info table w/ fact sheets; 1 Tribal WRAP member sign ups Approved data gap studies Updated versions of project materials posted to TDWG page Workplan Tasks for the Next Two Months Complete finalization by consensus of products under contract (oil & gas study) Plan 2nd webinar Relay TDWG contractor feedback to PHPWG contractor on Consultation & Coordination Framework Format/package tribal contacts list into active tribes listserv for WRAP use

Workplan Coordination Activities by Tribal Data Work Group Workplan Coordination Occurring over the Last Month Presentation of workplan status to all WGs at Spring Mtg. Receipt & partial review of Consultation & Coordination Framework etc. from RHPWG. Oil and Gas Workgroup – ITEP, EN3 and TDWG drafted Tribal oil and gas related emissions Workplan Coordination Needed over the Next Two Months RHPWG – submit to RHPWG combined or staggered- any reviews/comments of Framework (contractor/EN3, Co-chairs) to accompany C&G SC – requested reviews. Tribal contacts list – format & arrange for state planning use via RHPWG OGWG – webinar possibility?

Fire and Smoke Work Group

Workplan Progress by Fire and Smoke Work Group Workplan Progress over the Last Month Baseline Wildfire Emissions Inventory development Reviewed whitepaper on Baseline Period Wildfire Emissions Estimates Provided feedback to contractor regarding methodology in whitepaper. Approved by consensus contractor work to develop baseline inventory. Began scoping out the Smoke Management Plan/Program mapping project Workplan Tasks for the Next Two Months Review initial draft of Baseline Wildfire Emissions Inventory Review, approve, and forward to RH modelers Baseline Wildfire Emissions Inventory Continue scoping out the Smoke Management Plan/Program mapping project Begin discussions on future fire scenario development.

Workplan Coordination Activities by Fire and Smoke Work Group Workplan Coordination Occurring over the Last Month Coordination between Representative baseline and Future Fire Scenario sub-group and Fire and Smoke Workgroup. Workplan Coordination Needed over the Next Two Months Coordinate with RTOWG for evaluation of sensitivity of modeled baseline vs. base year 20% most impaired days. E.g., how sensitive is modeled 20% most impaired days to modulating wildfire emissions? Coordinate with RTOWG and RHPWG on questions: How will future fire scenario modeling be used in RH planning? What specific questions need to be addressed? Given limited resources, how many future year modeling sensitivity scenarios are possible? How many future fire scenarios should be generated? Coordinate with TSC. What other questions beyond RH planning are we looking to address with the development of future fire emissions scenarios?

Oil and Gas Work Group

Workplan Progress by Oil and Gas Work Group Workplan Progress over the Last Month OGWG and PMT review and feedback Base Year Inventory – Underway WRAP OGWG Baseline Year Survey Data (memo for OGWG review - May) Forecast Scenarios (On-the-books controls) – Underway Forecast (Additional Reasonable controls) Initiated discussions with RHPWG-Control Measures Subcommittee Workplan Tasks for the Next Two Months Task 1: Base Year Inventory Draft Inventory (v2) and Report (for OGWG review – anticipated end of May) Final Inventory (v2) (anticipated mid-June) Task 2: Forecast 2028 Inventory (On-the-books controls) – Forecast scenarios Task 3: Forecast 2028 Inventory (Additional Reasonable controls) – Summer

Workplan Coordination Activities by OGWG Workplan Coordination Occurring over the Last Month April 4 & May 6 – Project Management Team Calls Coordinate and PMT feedback with Ramboll April 9 – OGWG Bi-Monthly Call Tribal Oil & Gas Outreach Progress BLM Air Resource Management Studies Assistance from Agencies on Forecast Scenarios Workplan Coordination Needed over the Next Two Months RHPWG Control Measures Subcommittee – Identification of future O&G controls June 4 – Project Management Team Call June 11 – OGWG Bi-Monthly Call Agenda under development June 20 – RHPWG Quarterly Outreach Webinar OGWG summary under development OGWG and PMT review and feedback on draft work products

Regional Technical Operations Work Group

Workplan Progress by RTOWG Workplan Progress over the Last Month RTOWG call 5/23/19 NPS ammonia modeling study Receipt of WRAP 2014 Shakeout v1 platform at IWDW and TSSv2 EPRI International Haze Study status report Status of 2016 National Collaborative Emissions Modeling Platform WRAP Regional Haze Modeling Scenarios and Schedule EPA model evaluation forum on 2016 national modeling, 5/2/19 NASA HAQAST haze call, 5/20/19 Review WRAP 2014 Shake-Out Study Phase III Scope of Work (SOW)

Workplan Progress by RTOWG Workplan Tasks for the Next Two Months Finalize Phase III SOW Generate new version of the 2014 base case (v2) with lessons learned from v1 Re-run GEOS-Chem global model to estimate International impacts Estimate for ‘natural conditions’ Finalize MPE results with improved inputs Fire plume rise sensitivity (and possibly others) Updated Emissions Inputs all CA anthro data OGWG inputs Minor corrections EI & MP Subcommittee drafting memo to summarize input changes

Regional Haze Planning Work Group

Workplan Progress by Regional Haze Planning Work Group Workplan Progress over the Last Month Consensus on Overview of Regional Haze Planning (moved to Docket) Review of the Q/d analysis deliverables http://views.cira.colostate.edu/tssv2/Emissions/QDAnalysis.aspx Workplan tasks for the Next Two Months Plan for the June 20th Milestone Webinar Consensus on the WRAP Communication Framework

Workplan Coordination Activities by Regional Haze Planning Work Group Workplan Coordination Occurring over the Last Month Work with Coordination and Glide Path SC in planning a Milestone Webinar in June Coordination with all subcommittees to move work products through the consensus process Q/d analysis Overview of Regional Haze Planning Workplan Coordination Needed over the Next Two Months Finalize consensus on WRAP Communication Framework Coordinate with FSWG and OGWG on the June webinar Coordinate with CGP Subcommittee on the development of Regional Haze Storyboard

Workplan Progress by Coordination and Glide Path Subcommittee Workplan Progress over the Last Month Task 6.3: Develop New Materials D) Storyboard – Haze in the West Team has drafted an outline of the storyboard E) Webinar Presentations to States Next milestone webinar scheduled for June 20th, 2019. Focus on Fire emissions, O&G Survey Success, EI Projections, and State Q/d status updates Task 7.1: Review TSS v1 for Priority Needs Draft “TSS Priorities” document distributed to RTOWG and EI&MP Subcommittee chairs for feedback Task 7.2: Coordinate and Review TSS v2 Monitor Data Tool Development Monthly presentations on new metrics and tools from CIRA on TSS progress Workplan Tasks for the Next Two Months Task 1.2: Analyze monitor data trends Update from ARS and Brandon (Montana) on the status of the trend analysis and natural conditions alternative ideas B) Glossary & C) FAQs Potential for contractor support. Creation of scope of work to detail deliverables Task 8.2: Establish Consultation-Coordination Framework Plan to integrate new FLM and tribal contact information into one centralized location

Workplan Coordination by Coordination and Glide Path Subcommittee Workplan Coordination Occurring over the Last Month The subcommittee coordinated with the following entities: RTOWG – Draft FLM Priorities Document Review EI&MP Sub – Draft FLM Priorities Document Review FLMs – Frank updated the list of FLM contacts before his retirement Workplan Coordination Needed over the Next Two Months Fire Smoke Work Group – Potential inclusion in June 20, 2019 webinar O&G Work Group - Potential inclusion in June 20, 2019 webinar for survey success EI&MP Sub - Potential inclusion in June 20, 2019 webinar for EI projections Interested states - Inclusion in June 20, 2019 webinar for Q/d status

Workplan Progress by EI&MP Subcommittee Workplan Progress over the Last Month 2014 Base Case (Shakeout v2) emissions changes submitted to contractor Pima County point source updates Sector change for N.D. point source California – complete replacement for anthropogenic sources (custom process underway) Other expected changes include O&G and boundary condition updates Workplan Tasks for the Next Two Months Send out memo describing Shakeout v2 updates Collect representative baseline emissions updates from states (June 20 deadline) Procedural guidance for OTB emissions to be submitted by states (Aug 1 deadline)

Workplan Coordination by EI&MP Subcommittee Workplan Coordination Occurring over the Last Month O&G Workgroup reviewed v1 emissions; O&G v2 emissions will come from contractor based on state comments Workplan Coordination Needed over the Next Two Months v2 shakeout, representative baseline, and OTB modeling scenarios require coordination as neded with O&G WG, contractor, Fire & Smoke WG, Coordinate with Communication subcommittee to provide guidance to states on what is needed from them for the different modeling scenarios.

WRAP goal: complete by late 2019 Workplan Progress by Control Measures Subcommittee Workplan Progress over the Last Month WRAP contracted with Ramboll to complete a Q/d analysis for Class I areas in western states Completed Q/d analysis work products have been reviewed by RHPWG Spreadsheet and database tools are now available on the TSS Workplan Tasks for the Next Two Months Begin to identify 2028 control strategies for incorporation in 2028 inventory Many states are notifying sources and beginning the control strategy analysis, some states already working on the analysis Draft Source Control Assessment Considerations memo being prepared to assist states in performing the four-factor analysis WRAP goal: complete by late 2019

Workplan Coordination by Control Measures Subcommittee Workplan Coordination Occurring over the Last Month Briefed RHPWG on Q/d analysis and shared with other states outside of the CM Subcommittee Workplan Coordination Needed over the Next Two Months Coordination call with the O&G Workgroup to discuss potential control options for oil and gas sector Coordinate with EI &MP Subcommittee on timing of conversations with sources to generate/confirm emission inventory inputs for modeling

End of Workplan Progress Update