The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.

Slides:



Advertisements
Similar presentations
Cathedral of the Immaculate Conception Project Information Session.
Advertisements

Capital Improvement Task Force Update
St Swithun’s Open Meeting 30 th June What is the state of the church? ( Hint, look around you) The architect’s report identified some urgent issues.
WELCOME FIRST ANNUAL TOWN MEETING OUR LADY OF HOPE Parish Blackwood, NJ October 27, 2010.
PRELIMINARY PROPOSAL FOR PARISH MISSION STATEMENT  WE ARE A EUCHARISTIC COMMUNITY, A PEOPLE DIVERSE IN BACKGROUND UNITED TOGETHER AS CATHOLIC CHRISTIANS.
St. Charles Parish Strategic Pastoral Plan for Facility Development
St. Bartholomew Parish: “To develop our faith community and help each other live Christ” (From our Mission Statement) Addressing our Building & Renovation.
All Saints Episcopal Church introduces A Firmer Foundation.
Roof Repair The old copper cladding from the bell tower has been removed, and a waterproof membrane has been installed over the wood decking.
Our Lady of Nazareth Will Celebrate Its 100 th Year Anniversary In th Year Committees Renovation Committee Celebration Committee.
Parish History Master Plan Phase 1 Costs Next Steps Parish Survey Questions + Answers The Master Plan Process 3/11Finance Council funded Master Plan Study.
o Why are we meeting?  Repair of steeple o Current problems o Recent history of repairs o Why must steeple be repaired? o Where do we go from here? o.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
New Facility Funding. The Rules: The Good News The state allows kids to be counted as an additional.25 of a student for two years if the student attends.
Church Renovation/ Expansion Proposals Willowdale.
The Church of the Holy Trinity, Guildwood Moving forward, together Town Hall meeting, October 5, 2014.
Local Buildings of Grand Isle, VT Nicholas Shepard.
The Catholic Community of St. Thomas More New Building Committee.
In 1851, several hundred Charlotteans, half of whom were not Catholics, watched the Rev. J.J. O’Connel lay the cornerstone for the original Saint.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
 Home Upgrades & Repairs  2124 Kittredge Street, Berkeley CA  Phone: (510)   Serves Berkeley, Albany,
Proposal For Fire Station No. 2 Presented to: Lawrence City Commission April 11, 2006.
The Catholic Diocese of Pueblo Foundation, Inc Grant Recipients Experience the Difference the Catholic Foundation Makes....
Prayer Endeavor:  Breakthrough Revival  Radical Hospitality  No Child Hungry.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Refreshing Redeemer Building Reserves & Funding Operations 2014.
April 30, 2014 St. James Parish Council Meeting Finance Committee Report For the Nine Months Ended 31 March 2014 Confidential – For Discussion Purposes.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
1 Welcome to Holy Family Regional Catholic School.
Faculty Meeting Monday, April 4, Deferred Maintenance.
Church Roof Repair 09/07/2014. Reason for Meeting Bylaws give Council authority to authorize repair. Council wants to keep congregation informed of actions.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Renaissance On Turtle Creek Annual Meeting January 20, 2009.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 11/18/2014.
The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building.
Emmaus House of Saginaw 733 S. 14 th Street, Saginaw, MI The name “Emmaus” is from the Bible, Luke 24: In the Bible, it designates the.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
Exterior Maintenance and Cleaning
St. Mary of the Sacred Heart
Town Hall Meeting November 19th & 20th, 2016
AGENDA Opening Prayer Financial Review FACTS Grant and Aid Assessment
Fall 2017 Update: Physical properties and sinking fund
Capital Improvements Presentation
“Gather & Grow” Agenda Welcome & Opening Prayer Monsignor Bronkiewicz
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Thank you to our Sponsors
“A Place to Gather and Grow”
Fort Cherry School District
A New Church At What Cost ?
Building Project Informational Meeting
Public Hearing April 17, :30 pm Town Hall-Meeting Room B
A New Church At What Cost ?
2018 interim Finance council review
Cathedral of the Immaculate Conception
And.
Preparing Your Home to Attract Buyers
St. John’s Finances 101 November 4, 2018.
Capital Appeal Pledges and Contributions
Cathedral of the Immaculate Conception
Carleton College Facilities Management
Progress On Capital Campaign & Projects
Exterior Maintenance and Cleaning
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Stoughton Public Library
Portville Central School District
Community Practice Asset Management.
Presentation transcript:

The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance council members-all of whom are Blessed Sacrament Parish parishioners. They hold the parish dear to their hearts and want what is best for the parish. All of the listed projects would be considered “out of budget” items and would require special funding to complete. NOTHING has to be done IMMEDIATELY. We are simply looking at potential projects for the next 5-10 years.

Blessed Sacrament Parish Town Hall April 30, 2019 For I know the plans I have for you,” declares the LORD, “plans to prosper you and not to harm you, plans to give you hope and a future. Jerimiah 29:11 Blessed Sacrament Parish Town Hall April 30, 2019

Sacramental statistics for our parish Year Baptism Eucharist Confirmation Wedding Funeral Total 2010 37 36 49 10 68 200 2011 64 39 38 9 83 233 2012 32 46 72 197 2013 42 31 84 212 2014 50 43 11 71 214 2015 33 34 6 75 186 2016 53 35 45 7 79 219 2017 40 18 60 169 2018 28 23 161 393 329 327 78 664 1791

Fundraising and Donations Assumption Catholic School Our budget is met with three forms of income: Tuition Parish Subsidy Fundraising and Donations The cost of educating a child in our school last year was $6093.40 Our Total School Income & Expense Budget for 18-19 is $747,600

Hibbing Catholic School Endowment Since it’s inception in October of 2000, the Hibbing Catholic School Endowment Fund has distributed over $750,000 from earnings to Assumption Catholic School for various projects such as tuition assistance, a new computer lab, 70 iPads for student use, a contribution to the Building fund and many others.

Enrollment vs Parish Subsidy Assumption School Enrollment

Fundraising Efforts Assumption Catholic School

5 year look back at Immaculate Conception Expenditures   13-14 14-15 15-16 16-17 17-18 18-19 Parish (General Administration) Purchased Services $ 4,240.00 $ 4,126.78 $ 3,829.30 $ 3,757.59 $ 4,840.35 $ 3,294.92 Rectory Plant Operation Expense $ - $ 3,825.70 $ 3,282.82 Plant Maintenance Expense $ 34.52 Church Building $ 139.00 $ 20,502.57 $ 21,079.66 $ 18,204.92 $ 15,944.07 $ 17,430.99 $ 12,908.06 $ 2,033.41 $ 1,924.56 $ 669.61 $ 1,469.91 $ 206.84 $ 474.72 Property Insurance $ 9,617.00 $ 9,613.00 $ 9,251.00 $ 9,301.00 $ 9,400.00 Total Expenditures $ 26,775.98 $ 36,748.00 $ 32,455.83 $ 30,422.57 $ 35,743.88 $ 29,534.04 Average Mass attendance 138 146 158 149 125

5 year look back at Blessed Sacrament Expenditures   13-14 14-15 15-16 16-17 17-18 18-19 Parish (General Administration) Purchased Services $ 9,132.00 $ 6,594.75 $ 6,083.45 $ 7,043.47 $ 6,293.70 $ 3,830.91 Parking Lot / Grounds $ - $ 828.69 $ 732.33 $ 417.58 $ 417.32 Rectory $ 2,102.15 $ 1,035.65 $ 1,079.23 $ 826.22 $ 1,485.67 $ 824.42 Plant Operation Expense $ 17,168.35 $ 15,136.43 $ 14,324.01 $ 15,414.62 $ 14,202.76 $ 12,527.53 Plant Maintenance Expense $ 679.85 $ 1,473.29 $ 497.30 $ 687.13 $ 911.59 $ 774.39 Church Building $ 149.00 $ 789.00 $ 650.00 $ 17,829.27 $ 14,227.59 $ 13,916.70 $ 15,471.65 $ 13,235.88 $ 12,084.41 $ 7,068.15 $ 710.00 $ 4,589.54 $ 4,802.97 $ 3,232.95 $ 3,374.14 Property Insurance/campus $ 31,373.00 $ 31,873.02 $ 31,378.00 $ 31,612.00 $ 33,062.00 Total Expenditures $ 53,979.77 $ 70,550.71 $ 73,340.94 $ 77,145.39 $ 72,042.13 $ 67,545.12 Average Mass Attendance 220/310 208/298 183/281 163/241

Pastoral needs: Outreach to the homebound Family Faith Formation School Expansion – Art Room & Science Lab

The following are deferred maintenance projects identified by the Building & Grounds Commission

Immaculate Conception Church

Crumbling ramp—estimated costs to remove & replace--$60,000

Handicap Accessibility Should we consider the possibility of making the Church and social hall handicap accessible by installing a lift/elevator at ground level? Lift with new construction to renovate baptistry—$130,000 plus the cost to remove ramp This Photo by Unknown Author is licensed under CC BY-ND

Cleaning, tuckpointing, waterproofing & sealing of bell tower estimated $43,000 plus the cost of brick @ $43.60/brick

Cleaning, tuckpointing, waterproofing & sealing of main church $44,500 plus the cost of brick @ $43.60/brick

Circled areas on rooftop exhibit major damage from water intrusion and growth of vegetation thus causing interior damage to the choir loft walls. The entire parapet edge will need to have shingles & decking removed, area sealed, water diversion installed, decking & shingles replaced. Costs on repairs to parapet T.B.D. Estimated cost to reroof & replace gutters $39,000

Interior damage from leaking parapet

Preservation & maintenance of our stained glass Estimated costs for repairing, re-leading, & replacing the protective covering--$35,000

Rectory & garage improvements such as new exterior paint and roofing—to be determined.

Blessed Sacrament Church The following are deferred maintenance projects identified by the Building & Grounds Commission

Roof estimate to correct ice damming issues--TBD Suggested corrective measures: Reinsulate the attic space Reinsulate eaves—no eaves Change the direction of the exhaust fan Heat tapes—too costly Replace ice & water shield on roof decking

Water intrusion at Blessed Sacrament Exterior wall by Fr. Gabriel’s confessional. Water intrusion at Blessed Sacrament

Insurance estimate to fix interior wall water damage-$75,000 Repair & repaint the inside of the baldachin, sanctuary plaster to be able to put away the cloth panels & restore the body of the church from recent water damage---estimates coming Insurance estimate to fix interior wall water damage-$75,000

Tile floor replacement—asbestos removal-$20,000, floor replacement-$60,000 Removal, repair, & replacement of pews & kneelers--$145,000

Preservation & Maintenance of our Stained Glass Estimated costs for repairing, re-leading, & replacing the protective covering—$102,000

Sound proofing three confessionals $3500

Air conditioning Blessed Sacrament Church--- $40,000 budget pricing

Rectory balcony Reconstruction is needed on the southeast elevation cornered archway. Balcony archway deterioration caused by water infiltration. Quoted repairs $28,760 plus the cost of brick at $43.60/brick

North Elevation upper wall failure Water infiltration from the roof has caused brick to bulge and deteriorate. Estimated costs for chimney removal, roof repair, repair & replacement of brick and tuckpointing--$15,000 plus the cost of brick.

Steam to gas conversion for Blessed Sacrament Campus-$250,000 budget price. Savings recouped in 8-10 years based on today’s steam price.

Stripping & refinishing St. Leo’s Hall floor -- $13,000

Assumption Catholic School playground upgrade--$100,000

Forging ahead: Increase pastoral attention for the elderly Estate Planning Seminars Increase pastoral attention for families Facilities Repair Blessed Sacrament Church Improve current facilities at Blessed Sacrament/classrooms Repair Immaculate Conception Church Close and alienate Immaculate Conception Property Forging ahead:

Next Town Hall Meeting June 4, 2019 6pm