ESHAC 5 Close out 04 October 2016.

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Advertisements

1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Protection Against Occupational Exposure
Release & Deployment ITIL Version 3
OH&S Management System
Lali Tchelidze Safety work package leader
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Research & Technology Implementation TxDOT RTI OFFICE.
Prime Responsibility for Radiation Safety
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
State of Georgia Release Management Training
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
1 Package on food improvement agents Food additives Food enzymes Flavourings Common procedure Developments since earlier consultation.
OH&S Management System
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
Principal Investigator ESTCP Selection Meeting
ESS licensing process and Readiness Reviews
Disaster and Emergency Planning
EIA approval process, Management plan and Monitoring
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Chapter 10 Software Quality Assurance& Test Plan Software Testing
Safety in Construction and Upgrade Phases
Principal Investigator ESTCP Selection Meeting
HSE rules & regulations
(Additional materials)
OH&S Management System
EP Experiments safety validation process Safety Permits
HL-LHC Safety Assessment Process
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
EU Reference Centres for Animal Welfare
CLINICAL INFORMATION SYSTEM
Software life cycle models
Updates on ESS Handbook for Radiation Protection
ESHAC #9 Safety Readiness Review “Lessons learned”
Radiation protection organisation
Safety Management System Implementation
Helene Skikos DG Education and Culture
Helen Boyer OHS group leader
ETS WG, 31 January-2 February 2005
How to conduct Effective Stage-1 Audit
Principal Investigator ESTCP Selection Meeting
Bunker Internal Review Welcome & Charge
PSS verification and validation
ESS Handbook for Radiation Protection
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Analysis of the notification of compensatory measures
Radiation Protection Handbook
ESH&Q General Information
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
Radwaste: status & way forward
DOE Review of the LCLS Project October 2006
Licensing update ESHAC #7, October 2017
Test Beamline System Requirements and Charge to PDR Committee
ESHAC Meeting # Peter Jacobsson Head of ESH
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Principal Investigator ESTCP Selection Meeting
Safety Program for LCLS Experiments
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

ESHAC 5 Close out 04 October 2016

How do you look upon the organisation of ESH and Q and the included cost estimate for the future operational phase? The Committee believes that the proposed resources for operational radiation protection are adequate, except for the function of RPE where a single position is considered not to be sufficient and except for electronical maintenance of radiation monitors, where an extra 2 FTE could be necessary. The Committee reiterates its continuous recommendation to have the necessary competence and resources for radiation physics calculations (shielding, activation ,...) within the EH&S Division. This should also allow maintaining a close link between the people doing the calculations and the people doing the operational radiation protection, which from experience in other large accelerator facilities is of key importance. The Committee recommends that within the OHS Unit, one specialist in biology safety should be hired (can be one of the three positions showed for experiments safety. The Committee recommends that the OHS Unit has specific competence in laser safety, in view of the expected large number of lasers, including class 3B and 4, on the instruments The Committee recommends that a position for electrical safety is included in the OHS Unit. This position should in particular be in charge of electrical safety related to electrical user equipment. The Committee recommends that the OHS Unit should include sufficient resources to manage the safety follow up of contractors, works accident analyses, ... From experience the Committee estimates the need for this as 3 (technician) FTEs.

How do you look upon the organisation of ESH and Q and the included cost estimate for the future operational phase? The Committee recommends that the OHS Unit should include sufficient resources for safety training. The Committee believes that the 1 FTE proposed by ESS would not be sufficient. This task could be shared with the 3 FTE mentioned in the previous recommendation. The Committee takes it for granted that the necessary IT resources are available within the ESS organisation to provide the necessary support for the administrative management of safety training databases (and IT needs to manage other ESH & Q issues). The Committee recommends that within the ESS organisation chart, the required positions are foreseen to have “Experimental Hall Operators”, such as to have at least one person present 24h/7d. These people will have to assume a number of safety responsibilities, which clearly need to be defined. In particular, these people will be involved in the emergency response (injuries, fire alarms, ...).

What is your opinion about the status of our SSM application work and the associated time schedule? The Committee acknowledges the important amount of work accomplished by ESS since the submission of application 2 related to providing complementary information request by SSM. However, the Committee is worried by the amount of complementary information still to be submitted. In view of the time needed by SSM to do the final review before delivering the permit for installation, all the complementary information should be submitted to SSM before the end of 2016, otherwise the general project planning may be delayed. The Committee believes this is a very tight schedule. The Committee is also worried about the tight schedule to obtain the permit 3 without causing further general project delays. In view of this tight schedule the Committee believes that it is necessary that permit 3 should be split in two consecutive permits, the first permit for beam at the end of the 2 GeV linac but without beam on target, the second permit for beam on target. The Committee believes that work on application 3 should start as soon as possible (i.e. basically today) to minimise the time between the delivery of the permit for the commissioning of the warm part of the linac (definition of basic requirmements from SSM) and the submission of the application for 2 GeV beam. ESS should use lessons learned from the writing up of the application 2, in particular by nominating from the beginning a technical editor and by anticipating more time to write up the self assessment document.

How do you look upon the work done for sustainability? As the subject was not dealt with during the meeting, the Committee will examine the document provided by ESS and will reply in the final report.

How do you look upon the work done for ODH? The Committee commends the organization ESS has put in place with respect to ODH, in particular the creation of the ODH working group and the Cryogenic Safety Committee, with representations from the different divisions concerned. The Committee also commends the elaboration of the draft version of the ODH safety process and implementation document. The definition of an escape lane via a hatch might need special justification in the safety file, as it is not good practice to escape into an area of higher radiation dose rate. A technical review has been carried out with external experts leading to an optimized ODH detection implementation configuration. As a result it appears that the number of ODH monitors could be reduced by increasing the distance between them. The Committee wonders if this reduction has an impact on the criteria for triggering the evacuation alert and whether the false alarm aspect has been taken into consideration? Please note that the cryogenic expert within the ESHAC was not present during the present meeting.

Your comments regarding the schedule and needed work for the commissioning, especially the first part of the accelerator? ESS needs to establish an operations organization (even if one person). Early in a project, Operations helps to define procedures, training, emergency response, commissioning plans, alarm management…Also can be trained in EPICS to create operations and commissioning screens, apps, … The necessary posts in the organisation chart have to be filled, all necessary equipment, such as radiation monitors must be available, … Commissioning should be on the agenda of next ESHAC.

ESS responded to the recommendations from the last ESHAC meeting ESS responded to the recommendations from the last ESHAC meeting. The committee is invited to evaluate the responses and comment where appropriate. (11) The Committee believes that all radiological risk studies (shielding and activation) should be supervised more effectively throughout the entire assessment process by the ES&H Division, implying the necessary expertise in radiation protection. ES&H Division should take the overall responsibility for the results, their documentation and verification of their implementation. This recommendation is directly related to the Committee’s worries about the delays in the hiring of the Radiation Safety Officer. ESS notes that this has been a constant recommendation from the committee since its start of 2014. It has been discussed at the top management level of ESS but up to this date, the ESH organisation is not “responsible” for the calculation of the necessary shielding. The ESH Division is one of several reviewers that all shielding documents have to pass through. One has to bear in mind that for a neutron scattering facility, shielding calculation is not only a safety function but also has a functional meaning of “isolate” the instruments. This is a difference compared with a Synchrotron facility where shielding and radiation protection is more linked. Comments from ESHAC: the committee notes the shielding co-ordination set-up as retailed in response to recommendation 11, which it still would prefer being integrated to the ESH services in terms of a radiation safety function. The Committee reiterates its continuous recommendation to have the necessary competence and resources for radiation shielding calculations within the EH&S Division. This should also allow maintaining a close link between the people doing the calculations and the people doing the operational radiation protection, which from experience in other large accelerator facilities is of key importance. (38) ESS shall follow up the lessons learnt at CERN with the adopted approach. The ESH and Q division have to admit that the follow-up of the CE marking issue has not been in focus for the last year. Resistance from several stakeholders has led to a standstill in this question. With our new Ass Dir. in place, the issue will be raised again and we will follow-up the approach made by CERN more carefully. Comments from ESHAC: the committee re-iterates its conviction that an adequate conformity assessment process, notably the availability of the hazard and risk analysis enabling system-wide compilation, modelled on European common practice (CE) should be in place for all project deliverables, whether in-kind or not.

ESS responded to the recommendations from the last ESHAC meeting ESS responded to the recommendations from the last ESHAC meeting. The committee is invited to evaluate the responses and comment where appropriate. (38) ESS shall follow up the lessons learnt at CERN with the adopted approach. The ESH and Q division have to admit that the follow-up of the CE marking issue has not been in focus for the last year. Resistance from several stakeholders has led to a standstill in this question. With our new Ass Dir. in place, the issue will be raised again and we will follow-up the approach made by CERN more carefully. Comments from ESHAC: the committee re-iterates its conviction that an adequate conformity assessment process, notably the availability of the hazard and risk analysis enabling system-wide compilation, modelled on European common practice (CE) should be in place for all project deliverables, whether in-kind or not.

ESS responded to the recommendations from the last ESHAC meeting ESS responded to the recommendations from the last ESHAC meeting. The committee is invited to evaluate the responses and comment where appropriate. (52) Incorporate a Controlled Access mode into the PSS proposal to SSM. Currently the PSS system includes a controlled access mode, and this will be presented to SSM in November 2016. There is a planned meeting where ESS introduces the PSS strategy, analysis, software, hardware and shows the test stand that has been developed here at ESS. Comments from ESHAC: the Committee hopes that SSM will be able to accept ESS’s proposal concerning the controlled access mode. The Committee is convinced that the incorporation of a controlled access mode will contribute to a reduction of the individual and collective radiation doses, as it will limit the number of tunnel searches.

Top 6 recommendations Radiation Monitoring System The Committee recommends that ESS deals with radiation monitoring issues with the highest priority. Monitors must be specified and tested if no reference exists (in particular electronics most probably need to be able to cope with pulsed beams). The Committee was surprised to learn that in-kind contributions were again considered for radiation monitoring. Radiation physics calculations (shielding, activation, ...) The Committee reiterates its continuous recommendation to have the necessary competence and resources for radiation shielding calculations within the EH&S Division. ES&H + Q resources for normal operations The Committee recommends that ESS reviews its resource planning for ESH+Q taking into account the detailed recommendations formulated by ESHAC. Licensing See reply to question no. 2 of ESS charge. CE certification / In kind contribution management Installation Commissioning plan Resources + organisational and technical aspects Shielding simulations for warm part of linac Safety organisation for co-activity (with SKANSKA)