Improving Productivity

Slides:



Advertisements
Similar presentations
At what Q is TR maximized? How do you know this is a maximum
Advertisements

AKUNTANSI MANAJEMEN. O The cost-volume-profit study is the manner of how to evolve the total revenues, the total costs and operating profit, as changes.
Supplement A Decision Making.
Chapter 11: Competitive Markets
Operations Management Capacity Planning Supplement 7
Chapter 20 Cost-Volume-Profit Analysis and Variable Costing
6 Slide 1 Cost Volume Profit Analysis Chapter 6 INTRODUCTION The Profit Function Breakeven Analysis Differential Cost Analysis.
Breakeven Analysis Quantitative Tool for Evaluating Alternatives.
1 BREAKEVEN ANALYSIS Introduction Introduction What is Break-even Analysis? What is Break-even Analysis? Break-even in comparing alternative propositions.
C H A P T E R 2 Analyzing Cost-Volume- Profit Relationships Analyzing Cost-Volume- Profit Relationships.
BMM4733_Quality Engineering
Cost-Profit-Volume Analysis Samir K Mahajan. BREAK -EVEN ANALYSIS Break –even Analysis refer to a system of determination of activity where total cost.
Cost-Volume-Profit Analysis Chapter 7. Cost Volume Profit Analysis n What Is the Break-Even Point? n What Is the Profit at Occupancy Percentages Above.
Management Accounting Breakeven Analysis. Breakeven Analysis Defined  Breakeven analysis examines the short run relationship between changes in volume.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting for Business – A non-accountant’s guide 2/e by Jopling, Lucas and Norton Slides prepared.
© Business Studies Online “A firm Breaks Even if it doesn’t make a profit or a loss” In other words profit = 0 For this to happen the money coming into.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
@ 2012, Cengage Learning Cost Behavior and Cost-Volume-Profit Analysis LO 4 – Using the Graphic Approach for CVP Analysis.
Cost-Volume-Profit Analysis © 2009 Pearson Prentice Hall. All rights reserved.
Cost-Volume-Profit Analysis © 2012 Pearson Prentice Hall. All rights reserved.
C H A P T E R 2 Analyzing Cost-Volume- Profit Relationships Analyzing Cost-Volume- Profit Relationships.
Cost Behavior Analysis
1/20 Operations Management Break-Even Analysis - Lecture 4.2 Dr. Ursula G. Kraus.
Fundamentals of Cost Analysis
CDAE Class 07 Sept. 18 Last class: Result of Quiz 1 2. Review of economic and business concepts Today: 2. Review of economic and business concepts.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Chapter 20 Cost-Volume-Profit Analysis
A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
CDAE Class 08 Sept. 20 Last class: 2. Review of economic and business concepts Today: 2. Review of economic and business concepts Quiz 2 (Time value.
Module 7: Cost Behavior & Cost- Volume- Profit Analysis ACG 2071 Created by: M. Mari Fall
Fundamentals of Cost-Volume-Profit Analysis Chapter 3 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
HFT 3431 Chapter 7 Cost-Volume-Profit Analysis. Cost Volume Profit Analysis n What Is the Break-Even Point? n What Is the Profit at Occupancy Percentages.
CDAE Class 07 Sept. 19 Last class: Result of Quiz 1 2. Review of economic and business concepts Today: 2. Review of economic and business concepts.
1 DSCI 3123 Process Planning And Technology Process Strategy Process Planning Make-Or-Buy Decisions Process & Specific Equipment Selection Process Analysis.
Chapter 18. Identify how changes in volume affect costs.
BREAK EVEN ANALYSIS Any business wants to make a profit on their investment of time and money It is also a useful planning tool Breakeven point is the.
Break-Even Analysis Study of interrelationships among a firm’s sales, costs, and operating profit at various levels of output Break-even point is the Q.
BREAK-EVEN The break-even point of a new product is the level of production and sales at which costs and revenues are exactly equal. It is the point at.
© 2007 Pearson Education Decision Making Supplement A.
BREAK EVEN ANALYSIS  We use the breakeven analysis to look at the point where we start to make a profit in the business.  Any business wants to make.
Breakeven Analysis Improving Productivity. Break-Even Analysis Break-even analysis has TWO forms: – A. CVP (cost-volume-profit): to determine the volume.
1-1 Cost Behavior and Cost Volume Profit Analysis Dr. Hisham Madi.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Break-Even Analysis Chapter 6a.
BREAK EVEN POINT & ANALYSIS BREAK EVEN POINT & ANALYSISFROM  MANJULA ROY  AKHILESH GIRI  UDAY PRATAP SINGH  PRASHANT KUMAR.
MODIFIED BREAKEVEN ANALYSIS TOTAL COST CURVES: COSTS AVERAGE COST CURVES: COSTS FIXED COSTS VARIABLE COSTS TOTAL COSTS QUANTITY AVERAGE TOTAL COSTS AVERAGE.
Prepared by Diane Tanner University of North Florida ACG Basic Cost-Volume- Profit Analysis 4-2.
A – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Decision Making A For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
17 Costs and break-even © Malcolm Surridge and Andrew Gillespie 2016.
Break-Even Analysis.
= an introductory presentation =
Cost-Volume-Profit Analysis
Cost-Volume-Profit Analysis
Fundamentals of Cost-Volume-Profit Analysis
Developing Capacity Alternatives
Process Planning And Technology
Cost Concepts and Design Economics
© 2017 by McGraw-Hill Education
Marginal costing and short term decision making
BREAK EVEN ANALYSIS.
A what level of production does the business start to make a profit?
Break-Even Chart A Business supplies the following figures about its activities: Fixed Costs: = €300,000 Variable Cost: = €20 per unit Forecast output.
Break-Even Analysis.
Production and Costs Standard12.2.1: Understand the relationship of the concept of incentives to the law of supply and the relationship of the concept.
Decision Making Supplement A
Management Accounting
Learning curve As firms gain experience in production of a commodity or service, their average cost of production usually declines For a given level of.
Presentation transcript:

Improving Productivity Breakeven Analysis Improving Productivity

Break-Even Analysis Break-even analysis has TWO forms: A. CVP (cost-volume-profit): to determine the volume of sales at which a specific product will generate 0 profit Total Costs = Revenue, i.e. Revenue – Total Costs = 0 B. to compare processes by finding the volume at which two different processes have equal total costs. Total costs of process X = Total costs of process Y Variable costs (c) are costs that vary directly with the volume of output. Fixed costs (F) are those costs that remain constant with changes in output level.

BREAKEVEN : Two Processes or Make-or-Buy Decisions Choose between two processes or between an internal process and buying those services or materials. The solution finds the point at which the total costs of each of the two alternatives are equal. Total costs of Alt. 1 = Total costs of Alt. 2 F1 + c1Q = F2 + c2Q The forecast volume is then applied to see which alternative has the lowest cost for that volume. Determining the Breakeven Quantity, Q* F1 + c1Q = F2 + c2Q c1Q – c2Q = F2 – F1 Q(c1 – c2) = F2 – F1 Q* = (F2 – F1) / (c1 – c2)

Make or Buy Breakeven Example Analyzing a production process that needs improvement, producing a metal flange. Two Alternatives: Make: buy a new machine and run the process in house Buy: contract with an outside vendor who makes the part Costs of each alternative: Make: Fixed costs: New machine, investment cost = $12,000/yr, Fm Variable costs: $1.50 / piece, (material & labor), cm Buy: Fixed costs: annual tooling costs = $2,400, Fb Variable costs: $2.00/ piece, cb

View this example in the Excel file: BreakevenCalc Example: MAKE v. BUY, Analyzing a production process that needs improvement, producing a metal flange. Two Alternatives: Make: buy a new machine and run the process in house Buy: contract with an outside vendor who makes the part RESULTS The Breakeven Volume is 19,200. If the volume is more than 19,200, then MAKE is the better than BUY. But if the Volume is less than the Breakeven, then BUY is better. Since the estimated annual volume is 25,000, MAKE is the choice. Costs of each alternative: Make: Fixed costs: New machine, investment cost = $12,000/yr, Fm Variable costs: $1.50 / piece, (material & labor), cm Buy: Fixed costs: annual tooling costs = $2,400, Fb Variable costs: $2.00/ piece, cb BREAKEVEN: TWO ALTERNATIVES Alternative 1 Alternative 2 NAME: MAKE BUY ANNUAL FIXED COSTS: $ 12,000.00 $ 2,400.00 VARIABLE COSTS/UNIT: $ 1.50 $ 2.00 UNIT OF MEASURE: Flange BREAKEVEN VOLUME 19200 ESTIMATED ANNUAL VOLUME 25000   ANNUAL VOLUME 2500 $ 15,750.00 $ 7,400.00 5000 $ 19,500.00 $ 12,400.00 7500 $ 23,250.00 $ 17,400.00 10000 $ 27,000.00 $ 22,400.00 12500 $ 30,750.00 $ 27,400.00 15000 $ 34,500.00 $ 32,400.00 17500 $ 38,250.00 $ 37,400.00 20000 $ 42,000.00 $ 42,400.00 22500 $ 45,750.00 $ 47,400.00 $ 49,500.00 $ 52,400.00 27500 $ 53,250.00 $ 57,400.00 30000 $ 57,000.00 $ 62,400.00 32500 $ 60,750.00 $ 67,400.00 35000 $ 64,500.00 $ 72,400.00 37500 $ 68,250.00 $ 77,400.00 40000 $ 72,000.00 $ 82,400.00 42500 $ 75,750.00 $ 87,400.00 45000 $ 79,500.00 $ 92,400.00 47500 $ 83,250.00 $ 97,400.00 50000 $ 87,000.00 $ 102,400.00 View this example in the Excel file: BreakevenCalc

Make or Buy Breakeven Example Algebraic Solution: Q* = (Fm – Fb) / (cb – cm) Q* = (12,000 – 2,400) / (2.00 – 1.50) Q* = 9600 / 0.50 Q* = 19,200 Breakeven Annual Volume If the forecast or expected volume is more than Breakeven (19,200), then the MAKE alternative generates the lowest Total Costs, and vice versa. Since the forecast volume is 25,000, the choice is to MAKE, so you should buy the machine and get started.

Example 2 Two Processes A new machine is needed for a process that produces a gear: Alt. 1: Machine A Fixed Costs: Annualize Investment: $120,000 Annual Maintenance: $20,000 Variable costs: Material: $2.25 / gear Labor: $6.25 / gear Alt. 2: Machine B (faster and more efficient in terms of labor Annualize Investment: $165,000 Annual Maintenance: $35,000 Labor: $2.25 / gear Try to solve this example: First try the formula; Then use the BreakevenCalc Excel spreadsheet.

CVP Break-Even Analysis Notation: Q is the volume of customers or units, c is the unit variable cost, F is fixed costs and p is the revenue per unit cQ = the total variable cost. Total cost = F + cQ Total revenue = pQ Profit = Revenue – Total Costs Breakeven  Profit = 0 pQ = F + cQ (Total revenue = Total cost) Determining the Breakeven Quantity, Q* pQ = F + cQ pQ – cQ = F Q(p - c) = F Q* = F / (p – c)

Break-Even Analysis can tell you… If a forecast sales volume is sufficient to break even (no profit or no loss) How low variable cost per unit must be to break even given current prices and sales forecast. How low the fixed cost need to be to break even. How price levels affect the break-even volume.

Hospital Example Q = F / (p - c) = 100,000 / (200-100) A hospital is considering a new procedure to be offered at $200 per patient. The fixed cost per year would be $100,000, with total variable costs of $100 per patient. What is the break-even quantity for this service? Q = F / (p - c) = 100,000 / (200-100) = 1,000 patients

Hospital Example, continued 400 – 300 – 200 – 100 – 0 – Patients (Q) Dollars (in thousands) | | | | 500 1000 1500 2000 Quantity Total Annual Total Annual (patients) Cost ($) Revenue ($) (Q) (100,000 + 100Q) (200Q) 0 100,000 0 2000 300,000 400,000

Total annual revenues Quantity Total Annual Total Annual (patients) Cost ($) Revenue ($) (Q) (100,000 + 100Q) (200Q) 0 100,000 0 2000 300,000 400,000 400 – 300 – 200 – 100 – 0 – Patients (Q) Dollars (in thousands) | | | | 500 1000 1500 2000 (2000, 400) Total annual revenues Quantity Total Annual Total Annual (patients) Cost ($) Revenue ($) (Q) (100,000 + 100Q) (200Q) 0 100,000 0 2000 300,000 400,000

Total annual revenues Quantity Total Annual Total Annual (patients) Cost ($) Revenue ($) (Q) (100,000 + 100Q) (200Q) 0 100,000 0 2000 300,000 400,000 Total annual costs Patients (Q) Dollars (in thousands) 400 – 300 – 200 – 100 – 0 – | | | | 500 1000 1500 2000 Fixed costs (2000, 400) (2000, 300) Total annual revenues

Total annual revenues Break-even quantity Quantity Total Annual Total Annual (patients) Cost ($) Revenue ($) (Q) (100,000 + 100Q) (200Q) 0 100,000 0 2000 300,000 400,000 Total annual revenues Total annual costs Patients (Q) Dollars (in thousands) 400 – 300 – 200 – 100 – 0 – | | | | 500 1000 1500 2000 Fixed costs Break-even quantity (2000, 400) (2000, 300) Profits Loss

Sensitivity Analysis Example A.2 pQ – (F + cQ) 200(1500) – [100,000 + 100(1500)] $50,000 Total annual revenues Total annual costs Patients (Q) Dollars (in thousands) 400 – 300 – 200 – 100 – 0 – | | | | 500 1000 1500 2000 Fixed costs Profits Loss Forecast = 1,500

Example, Denver Zoo What are: p? F? c?

Denver Zoo Setting up the Solution Q TR = pQ TC = F + cQ

Denver Zoo Graphical Solution Q TR = pQ TC = F + cQ

Denver Zoo Algebraic Solution pQ = F + cQ Q TR = pQ TC = F + pQ