Prototype Fabrication, Economic and Flight Test Plan PDR

Slides:



Advertisements
Similar presentations
Ex. 22 – Forced Landing Ex Forced Landing.
Advertisements

TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Keith Hout Patrick Dempsey Bridget Fitzpatrick Heather Garber Jong Soo Mok Stability Control and Flight Performance PDR October 24, 2000.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok PROJECT PLAN REVIEW September 26, 2000.
Preparation and Checklists gliding articles.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok AAE451 Aircraft Design Professor Dominick Andrisani First Flight November 21,
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Gliding Scholarship Exercise 9 THE APPROACH AND LANDING CFS Gliding Examiners © 2009.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Bridge Engineering Section Bridge Rehabilitation.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Dynamic Modeling PDR 17 October, 2000 Keith R. Hout Patrick Dempsey Bridget Fitzpatrick Heather Garber J.S. Mok.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
READY OR NOT THE FLIGHT REVIEW. FLIGHT REVIEW A FLIGHT REVIEW IS REQUIRED WITHIN THE PREVIOUS 24 CALENDAR MONTHS TO ACT AS PIC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Air Operations Branch Director Course Safety Issues Part 1 U.S. AIR FORCE AUXILIARY U.S. AIR FORCE AUXILIARY.
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
Chapter 2 Introduction to Construction Procedures
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
Limited Productive Resources and Unlimited Wants Preparing to Teach HS Economics 2014.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Propulsion Preliminary Design Review #2 October 17, 2000.
Flight Testing in the University Environment Dr. Chuck Hall SETP Flight Test Safety Workshop May, 2008.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ACES Spring 2003 Overview Where are we going? How are we going to get there?
Student Made Ultraviolet Radiation Detector Presented for your approval by: THE LATE BALLOONERS StuMURD.
AIRBUS A380 Has Airbus set the benchmark for future aviation? Will other manufacturers follow this trend?
Bridget Fitzpatrick Patrick Dempsey Heather Garber Keith Hout Jong Soo Mok Aerodynamics Preliminary Design Review #2 October 23, 2000.
READY OR NOT THE FLIGHT REVIEW.
How to paint a car yourself video You are about to view all it takes to know how to paint a car yourself.
Space Shuttle  Presentation by:  Adjunct Professor Walter Barry  Space Shuttle launch  Orbit  Re-entry  Private Enterprise.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Aerodynamics Preliminary Design Review #1 October 3, 2000.
ME 440 Aerospace Engineering Fundamentals Hot Topic of the Week.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Flight Preparation Boulder Ballooning Workshop 2006 BOREALIS Montana State University.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
2010. The rotation in 3-man mechanics is where the 1 st base umpire in A-Position and 3 rd base umpire is in the middle at the time of the pitch.
20 October 2016 Foster Wheeler 1200 LB Steam Boiler
Left Click for next action when ready.
TRCC Meeting Today is 20th October 2016
Proficiency Check Flight
To find near doubles.
BMFA RC Achievement Scheme FW Power A Certificate
Propulsion Preliminary Design Review #1
TRCC SAFETY Presented by: ROB HOARD.
Principles of Business & Finance Objective 4.03
Managing Human Resources and Labor Relations.
AIRBUS A380 Has Airbus set the benchmark for future aviation? Will other manufacturers follow this trend?
LCLS Ultrafast Science Instruments
Algebraic Sequences.
Class F3P Indoor Aerobatic Power Model Aircrafts
Ares I System Requirements Review (SRR)
Fabrication, Economics and Test Plan QDR
מרעיון למוצר דני חייט.
Prototype Fabrication, Economic, & Test Plan QDR
Class F3P Indoor Aerobatic Power Model Aircrafts
Prototype Fabrication, Economic, & Test Plan QDR
Bernoulli’s Principle
US Airport Signs: Use your packet to draw and label the following signs
Pre-Solo Training Program
North Augusta High School – Phase 2A and 2B
Reverse Percentage – Calculator – Answer Grid
CITY SCIENCE STARS: On the Wing
Presentation transcript:

Prototype Fabrication, Economic and Flight Test Plan PDR   ORION AEROSPACE Prototype Fabrication, Economic and Flight Test Plan PDR October 26, 2000 Patrick Dempsey Bridget Fitzpatrick Heather Garber Jong Soo Mok Keith Hout  

ORION AEROSPACE Objectives Schedule Economic Plan Flight Test Plan

Schedule October 25 – Order Parts October 31 – CDR ORION AEROSPACE Schedule October 25 – Order Parts October 31 – CDR November 1-4 – Complete and test wing section November 4-12 – Construction of SID5 November 12-15 – Prepare SID5 for Flight Readiness November 16 – FRR November 17 – Begin Test Phase November 21 – First Official Flight

Economic Plan Wing Test Materials ~ $90 SID5 Materials ~ $189.89 ORION AEROSPACE Economic Plan Wing Test Materials ~ $90 SID5 Materials ~ $189.89 Man Hours (estimate) ~ 2300 Labor ($150/hour) ~ $345,000

ORION AEROSPACE Price Breakdown of SID5

Flight Test Plan Glide Test Straight Crooked ORION AEROSPACE Flight Test Plan Glide Test Straight Crooked 2. Taxi test (Low and High Speed) 3. Go and Touch (or the Reverse Touch and Go) -Short Hops 4. Take-off and Fly basic Pattern (Racetrack) 5. Land - Inspect SID5/Change Battery 6. Take-off and try some “Fun Stuff” 7. Don’t Crash

Check List Prior to First Official Flight ORION AEROSPACE Check List Prior to First Official Flight Steps 1-7 “Check out OK’(Especially Step #7) Complete Inspection of SID5 Ready SID5 for unveiling to Public Double Check Everything Double Check Double Check

ORION AEROSPACE Questions?