Brown County General Hospital Virtualization Project By: Nicholas Duncanson
Project Description and Deliverables VI3 Cluster Install and Configuration 3 ESX Servers Fibre SAN for backend 1 Backup Server Attached tape Library Running Symantec Backup Exec Server Migration Convert several physical servers to virtual machines
Intended Use Replace old server hardware Reduce overall IT costs Provide room for future growth Curb ‘server sprawl’
User Profiles BCGH IT Staff End Users Administration and Maintenance Utilize the same services already in place
Testing Create test VM for a server, and verify all services work properly Have end users test the VM Delete the VM, and create a real VM, taking down the physical server Leave original server in place for at least one month after VM comes online Verify with end users that the server is working properly daily Check Virtual Center daily for alerts
Network Diagram
Storage Area Network
Fibre Switch for SAN
Fiber Switch Configuration
NS22 Configuration
ESX Servers
Demo
Conclusion Servers Virtualized VMWare VI3 Infrastructure in place Project successful