* 07/16/96 Production Flow Analysis: A Foundation for Design of a “Lean” Facility Layout *

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

Lean Manufacturing.
WAREHOUSING MANAGEMENT
Process Selection and Facility Layout
DOM 102: Principles of Operations Management Operations Scheduling
Chapter 15 Application of Computer Simulation and Modeling.
INDUSTRIAL & SYSTEMS ENGINEERING
Next Generation Factory Layouts Saifallah Benjaafar, University of Minnesota Shahrukh Irani, Ohio State University Sunderesh Heragu, Rensselaer Polytechnic.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Session Pooja patnaik.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 7 FLEXIBLE MANUFACTURING SYSTEMS E. Gutierrez-Miravete Spring 2001.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Traditional Approaches to Facility Layout
Layout Strategy.
The Simulation Project. Simulation Project Steps a.- Problem Definition b.- Statement of Objectives c.- Model Formulation and Planning d.- Model Development.
Facility Design and Layout
Lean Production - Objectives
LEAN system.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Just in Time Chapter 9 Vollmann, Berry, Whybark, Jacobs.
Rotor Cell Productivity Improvement Dresser-Rand Olean, NY January 18, 2013.
“Without the Cost of Waste …”
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
Process Layout Chapter 7 July 20, 2005.
L – 5 Distribution Channel - Warehousing and Inventory Management.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Activity Scheduling and Control
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
PLANT LAYOUT. THE PLANT Refers to the physical components of the manufacturing process of the product Required both in terms of buildings and equipments.
Production Planning and control – ME 1009 Unit 1 Introduction.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Production Production Flow Flow Analysis: Analysis: A Foundation for Design of a “Lean” Facility Layout.
Manufacturing Planning and Control
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Design of a Flexible Shopfloor Layout for a Fabrication Jobshop
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Inputs and Outputs to Aggregate Production Planning
The University of Jordan Mechatronics Engineering Department
Graduation Project (II): Operations Improvement at Mhanna Factory
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
“GARMENT PRODUCTION SYSTEM”
Process Selection and Facility Layout
Production Planning and Control
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
MENG 447 Manufacturing Systems Automation Chapter 1*
Just-In-Time and Lean Production
Flexible Manufacturing Systems
Chapter 6A Facility Layout 2.
Facilities Planning and Design Course code:
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
PRODUCTION SCHEDULING
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Process Selection and Facility Layout
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Topics To Be Covered 1. Some Thoughts on Production Management
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

* 07/16/96 Production Flow Analysis: A Foundation for Design of a “Lean” Facility Layout *

Symptoms of Inefficient Material Flows in a Facility Large travel distances in the material flow diagram Perceived shortage of floor-space for facility expansion High WIP inventory levels Large inter-machine transfer batch sizes High levels of finished product inventories Bottleneck resources with large queues Large cycle times for order fulfillment Significant queuing and material handling delays Significant forklift truck activity Poor order tracking capability Highly unpatterned material flow network Absence of a network of material handling aisles Inefficient communications between workcenters Low machine and labor utilization Frequent machine setups Absence of pull scheduling based on resource constraints Inflexibility to handle demand and/or part mix changes

Causes of Poor Material Flows in a Facility Building architecture Locations of manufacturing departments Locations of support services and utilities Design of the network of material handling aisles Locations of input/output points of departments Shortage of space for facility expansion Process plans for making parts and products Variety of routings in the part mix Current manufacturing technology Current material handling equipment in use Current material handling scheduling policies Choice of subcontracted operations and/or parts

Benefits of Using PFA for Facility Layout Verification and updating of operational and planning documents Verification and updating of current equipment inventory Review and improvement of business and manufacturing processes Redesign of product designs Redesign of process plans Strategic reallocation of equipment between departments Strategic duplication of equipment between departments Strategic consolidation of departments Strategic investment in flexible multi-function equipment Planning for flexibility - machine, process, routing, volume, etc. Implementation of capacity-constrained scheduling techniques Implementation of efficient machine loading rules Implementation of efficient job sequencing rules Implementation of setup reduction practices Revision of the product routings to eliminate redundant variety Revision of the product routings to eliminate "outlier" routings

Reasons for the Project at Company X * 07/16/96 Reasons for the Project at Company X Machines not located in close proximity Machines not arranged according to the process flow Backtracking in the process flow A new layout would save floorspace Lack of streamlined material and operator flows The area and layout of several machine footprints are not optimized WIP quantities at different machines differ significantly Material is moved in large batches between machines Significant delays in order throughput Quality problems due to absence of feedback* between machines * due to large distances of separation *

Reasons for the Project at Company X (cont’d) * 07/16/96 Reasons for the Project at Company X (cont’d) No production planning, finite capacity scheduling system or shopfloor control systems to track and progress orders Lack of prompt communications between the shopfloor and the production planner Production lot sizes are not based on any systematically planned master production schedule Difficulty in synchronizing production with the supply schedule for forgings *

“Design For Flow” Principles for Effective Layout Design Maximize: Directed flow One piece flow Ergonomics of material handling in every workcell Visual scheduling and material flow control Flexibility to accommodate variations in product mix and /or volume Minimize: Backtracking Transfer batches Travel distance in every workcell Travel distances between consecutive workcells WIP storage space between consecutive workcells* * design of a standard storage cart (“Kanbin”)

Design of a Standard Storage Cart (“Kanbin”) Original Design: Proposed Design:

Routing for 6-cylinder Products

Routing for 4-cylinder Products

Comparison of Routings for 6-cylinder and 4-cylinder Products

Initial Layout of Company X Shopfloor

Flow Diagram for 6-cylinder Products START FINISH

Flow Diagram for 4-cylinder Products START FINISH

Preliminary Layouts Presented to Company X Dock Company X feedback on Layout #1*: Allows direct line of sight between the Oven and the Wheelabrator Does not require relocation of the Borringer Keeps the Oven close to the dock — In the summer, heat can escape easily through the dock * This layout was chosen by the company

Preliminary Layouts Presented to Company X Dock Company X feedback on Layout #2: Oven cannot be moved into the position shown because the Borringer cannot be relocated Prevents direct line of sight between the Oven and the Wheelabrator

Preliminary Layouts Presented to Company X Dock Company X feedback on Layout #3: Oven cannot be moved into this position

Flow Diagram showing “Lean” Flow in an Initial Layout that was Proposed Flow of both 6-cylinder and 4-cylinder products Flow of 6-cylinder products only Flow of 4-cylinder products only

Constraints on Layout Design Borringer cannot be relocated. Final Inspection Area cannot be located near the Dock because winter cold would affect parts and gauges. M/Cs 757 and 1025 need 17' clearance on one side where their chip conveyors (17' in length) may need to be pulled out for machine maintenance. M/C 567 (Mori Seiki) needs 13' clearance on one side where its chip conveyor (13' in length) may need to be pulled out for machine maintenance. All M/Cs need to be accessed from at least one aisle for machine maintenance. An inspection area (10' by 20') must be located centrally in the flowline. The aisles could be used to accommodate large machines projecting out of a bay. The 5th bay should be kept clear to implement new product lines. (See “Initial Layout of Company X Shopfloor” shown earlier)

Constraints on Layout Design (Cont’d) Final Inspection Area constraints: M/Cs 776 and 736 (Grinders) and M/C 590 (Snag Grinder) create too much dust that could “corrupt” the Maggie. Therefore Maggie cannot be located adjacent to the Grinders. Wet Creates Dust Needs to be Dust Free Maggie Balancer Needs to be Protected from Cold and Dust * M/Cs in the Finish Grinding area were removed by Lycoming during the project period. M/Cs #510 and #738 (Okuma & Howa) were taken out of the machining line. M/C #109 (Bridgeport) was replaced by M/C #778. M/Cs #795 ( Cincinnati Drill Press) and #759 (G&L Drill Press) were to be replaced by a new machine.

Final Layout based on “Lean” Flow Incoming Cart Dock Operator’s Standing Point

Detailed Layout of Workcells (M/Cs #380, #568 and #569) N Note: All measurements are in feet.

Detailed Layout of Workcells (M/C #768 and GFMs) N Spacing Bench can be easily shared by two GFM operators *The constraint of 17' clearance is satisfied for both GFMs in this layout. Note: All measurements are in feet.

Detailed Layout of Workcells (M/Cs #777 and #735) N Leave 5' between the two M/Cs to minimize the operator’s travel distance Note: All measurements are in feet.

Detailed Layout of Workcells (M/Cs #567 and #724) N AISLE Note: All measurements are in feet.

Detailed Layout of Workcells (M/Cs #763 and #843) N AISLE AISLE Note: All measurements are in feet.

Detailed Layout of Workcells (From M/C #756) N Locate the vending machines in this way in order not to block the line of sight between consecutive workcells Incoming “Kanbin” Cart Operator’s Standing Point Note: All measurements are in feet.

Detailed Layout of Workcells (Operation #180 to Operation #235) N

Detailed Layout of Workcells (Final Inspection Area) N Note: All measurements are in feet.

Key Benefits of the “Lean” Layout Pure flowline layout Smooth workflow within every workcell Space was “freed” to accommodate a new product line Standardization of containers for WIP storage and transfer (“Kanbin”) Decrease in transfer batch sizes Reduction in floorspace due to proximity of cells Optimization of several machine footprints Improved communications between consecutive operations Layout designed for and with full cooperation of Company X operators, supervisors and managers

Conclusion “…..Thank you for the excellent work that you and your students did on the project. While it was a learning experience for us, I’m sure your students gained much more by seeing the classroom applied to the shop floor. It is rare to find an academician that is as comfortable on the shop floor as you are. This attribute helps not only the client using the service, but also the student, as it shows the student how it should be done in the “real world”. I believe the partnership between a public university and private industry is extremely important as it enables the businesses in the State of Ohio to enjoy the fruits of a great institution of higher learning. The way to make manufacturing in Ohio competitive into the future is to do just what we did, apply academic principles to the practical world on the shop floor. We are on our way to becoming more profitable and competitive thanks to the work your team did at Company X…...” Chief Financial Officer (Company X)

Schedule of Project Activities