Ibraim Voroga Iliga Mechanical Superintendent, Mechanical workshop,

Slides:



Advertisements
Similar presentations
Heat Pipe Final Industrial Training Presentation
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Chongqing Zongxue Heavy Industries Co.,Ltd
How the Stock Market Works. Stock A share in ownership of a company. A share in ownership of a company. Someone who owns stock in a company owns a part.
Bearings -Disassembly &Assembly Nizwa College of Technology.
Investment. Investment “Investment” is the thing that really makes our economy go and grow! Investment is any NEW –Plant and equipment Investment is any.
Welder Training Technology: Accelerated Practice to Production Paul Boulware, Application Engineer, EWI By Bill Forquer, CEO, RealWeld Systems Presented.
SUBJECT CODE NAME OF SUBJECT TOPIC :::::: FLUID POWER ENGINEERING CENTRIFUGAL PUMP Parul Institute of Engineering & Technology.
Questar Gas Company Customer Meeting Sept. 15, 2014 Stonebridge Country Club West Valley City, Utah Making lives better with natural gas.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Presentation 2012 GTW BEARINGS s.r.o.1.  History  Location  Technical Specialization  Products ◦ Components ◦ Bearing Systems  Bearings Technology.
Maintenance Management
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
Is your project investable? Key tips to make sure it is. 15 th March 2016 A Presentation at Power and Electricity World Africa conference, Sandton Convention.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Engineering Services Predictive Maintenance. Página Web Página Web
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Header World Accreditation Day 2017 Celebrations - KENAS Quality of Building Materials and Impact on Construction 9 June 2017 Lafarge | Presentation.
RUSSELL DEW FINANCIAL SERVICES

CREDAI STUDY AND TRAINING 2014
Graduation Project (II): Operations Improvement at Mhanna Factory
Fans & Heaters technical seminar
Chapter 22 Building Automation System Retrofit of Existing Systems
Figure A Figure B 12/07/2006 Rev B
American Private Enterprise System
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
Learning Objectives Identify the difference between the differing types of costs Identify the different types of revenue Explain the importance of costs,
GITARU UNIT 1 PLC UPGRADE
Free Safety Inspection Program
UGANDA CO-OPERATIVE TRANSPORT UNION LTD
GITARU WATER TREATMENT PLANT & BOTTLING UNIT
Capital & Revenue T.
What is an Apprentice?.
Introduction Problem statement Methodology Data Collection
JOH-KGN JvW-X1 CORPORATE FRAUD WORKFLOWGEN ABUSE BY THE EMPLOYEES Presented by Security & Integrity Department March 2017 No part of.
QE 107: Workshop Technology Section 5: Manufacturing Organisation
POWER, AUTOMATION AND INDUSTRIALIZATION: THE NIGERIAN EXPERIENCE BY STANLEY OKIY B.Tech (RSUST), M.Eng (UNIBEN), MPA (UNIBEN), & Engr. DR. C.C.
FEE INCREASES Public Work Shop June 2, 2018.
DISASTER PREPAREDNESS: A case of Masinga Flooding
Figure A Figure B 12/07/2006 Rev B
REVENUE BUDGET PRESENTATION 2019/2020
5th G2G INNOVATION PRESENTATION JULY 2017
OPERATIONAL EXCELLENCY
About us The ZGP groups owns three hot dip galvanizing plants. Company's firms have the following facilities: The company has a total area of ​​
Kenya Electricity Generation Company
GITARU UNIT 1 PLC UPGRADE USING KENGEN INTERNAL RESOURCES
Presented by: Josphat R. Mwandigha
MODIFICATION OF MOTORIZED OPERATED VALVE MOV
REAL-TIME TESTING OF ROCK CUTTINGS DURING DRILLING
THE KENGEN journey to world class innovation
Presented by: VICTOR OUMA
Quick Set-Up Technique
ANDREW ORLANDO / WANGECHI MWANGI
MR KEPHA OMUOSO Click to add Photo SENIOR ENGINEER QUALITY & SAFETY
Splash oil temperature monitoring: to eliminate crankpin failures
Pearce Mbuthia. Geomaticist, Center of Excellence, Olkaria
Dynamics and Risks of KenGen Portfolio Revenue Budgeting
USE OF ANDROID MOBILE APP for remote operation of VALVES.
LOCALIZATION OF POWER TECHNOLOGIES THROUGH PARTNERSHIPS
DOG WATCH SENSORS – MONKEY FREE POWER GENERATION
Librarian, Innovation & Knowledge, Central Office:
JOH-KGN JvW-X1 FABRICATION OF FLOW CONTROL VALVES FOR OLKARIA I GEOTHERMAL POWER PLANT Fredrick Olwal - Snr Technician and Joseph Odhiambo.
OMAR SALIM Senior Engineer - Kipevu
Presented by: Margaret Iregi & Enock Biamah.
BENEFITS OF LOWERING MASINGA’S MINIMUM OPERATING LEVEL
KenGen Media Report 09 May, 2017 to 10 May, 2017.
MOHAMED ELMI Electrical Technician - Geothermal
FURNITURE MAINTENANCE MANAGEMENT
Presentation transcript:

Ibraim Voroga Iliga Mechanical Superintendent, Mechanical workshop, Click to add Photo Ibraim Voroga Iliga Mechanical Superintendent, Mechanical workshop, Kipevu Power Station I joined Kenya power and lighting in 02nd April 1984, as a workshop Foreman 11 and rose through the ranks to Workshop Superintendent 1 I trained as a Mechanical Technician production option, where I ventured more on metallurgy, which I practice in white metalling and other work shop jobs(machinist, fabrication and maintenance).

COMMERCIALISATION OF WHITE METALLING BEARING PROCESS IN KENGEN Presented by: Ibrahim Iligha 2018 G2G INNOVATION SEMINAR, PRIDE INN SPA & RESORT 18TH JUNE - 22ND JUNE 2018

+ COMMERCIALIZATION Internal Bearing Remetalling capacity Additional company revenue

WHAT IS A BEARING A Bearing is a mechanical part that supports a rotating shaft either horizontal or vertical Plain bearings for horizontal shafts Thrust Bearing for vertical/horizontal shafts

WHAT IS WHITE METALLING Is the processes of receiving worn bearing shells, removing old white metal lining ,do tinning and refill new white metal and machine to size of journal given. The processes give new life time to a bearing as new.

WHITE METALLING METHODS Capillary method Centrifugal method Brazing by torch method Laser torch method(being developed)

KENGEN MACHINES THAT USE BEARINGS STEAM TURBINES Olkaria 1 Olkaria 1AU Olkaria 2 Olkaria 4 Olkaria wellheads

KENGEN MACHINES THAT USE BEARINGS Horizontal Hydro Turbine Wanjii Mesco Sagana Gogo Vertical Hydro turbines Kiambere Gitaru Kindaruma Kamburu Masinga

Bearing Remetalling restores it to ‘AS NEW’ CONDITION The white metal bearing wears either as a failure or with time in use and has to be replaced. Worn bearing Bearing Remetalling restores it to ‘AS NEW’ CONDITION Remetalled Bearing

Bearing Remetalling used to be carried out in KENGEN at the Kipevu Power Station Mechanical Workshop From 1986-2016.(30 Years) Personnel were trained and equipments bought to serve steam plant turbines as was delays in remetalling of bearing for the station from out sourced workshops. The steam plant was de-commissioned,. The equipment were still in use for other KenGen stations as shown below;

Olkaria 1 bearings Olkaria 2 bearing pads Kiambere pads

Turkwel thrust ring pads Wellhead bearings Gogo bearings Gas turbine bearings

KENGEN BEARING REMETALLING EQUIPMENT Ultra sonic crack testing(analog Tinning Bath Melting Oven Heating oven Bond meter mark 3 Melting pot

The equipment is however no longer being used and white metalling of bearings is being done in external workshops. The only hindrance to KenGen carrying out in-house remetalling is lack of enough skilled personnel

Due to staff retirements and natural attrition there is only one member of staff skilled enough to carry out the work to an acceptable standard Olkaria 1 turbine 3 bearing.

Cost Saving Extra Revenue We intend to train enough staff on remetalling to acceptable standards in order to Do remetalling for external customers on a commercial Basis Carry out white metalling for KenGen units Cost Saving Extra Revenue

HOW MUCH SAVING? Lets do a comparison

BEARING REMETALLING ORDERS TO STEELSTONE LTD. IN 2018 JOH-KGN001-20071212-JvW-X1 BEARING REMETALLING ORDERS TO STEELSTONE LTD. IN 2018 PO WORK AMOUNT ksh. DATE STATION 4500047978 Bearing remetalling 42,600 19.03.2018 Tana 4500047827 Rotating Ring remetalling 450,000 13.03.2018 Sondu Stationery Ring remetalling 357,670 Shaft Sleeve remetalling 253,450 4500047429 Thrust Pads remetalling 42600 16.02.2018 Wanjii Surge Pads remetalling 19500 Journal Remetalling 337,686 16.01.2018 4500046779 Journal bearing Remetalling 453,840 12.01.2018 Total 1,957,346

COST COMPARISON ON ONE BEARING BEARING SIZE bore 200mm x height 160mm by 15mm thickness of white metal lining Cost of other materials = ksh.12,000.00 White metal = ksh.120,000.00 Jig Fabrication = ksh. 3,000.00 Labour and Machining = ksh.20,000.00 Profit @ 15% = ksh.23,250.00 Taxes @ 16% = ksh.26,737.50 Total quotation = 204,737.50 Ksh KenGen paid ksh.453,840.00 for the size of Bearing (LPO no. 4500046779)

COMMERCIALIZATION PROCESS COST STAFF TRAINING COSTS WORKSHOP SETUP COSTS

STAFF TRAINING COSTS   Internal training The ideal staffs for training are ten to achieve commercialization of the processes. The training takes minimum of ten days as per syllabus and approximately 200,000.00.Ksh per person. Materials are available at stores Olkaria 1.   External Training Osborne engineering ltd, Dubai, Britain and Germany have good practical training facilities.    External trainings can be carried out after getting the internal training and been exposed to the procedures. The external training may take about 10 days for at least 4 staffs that will show more understanding on the processes. The cost is a minimum of USD 2000.00 tuition fee per student. Cost is 2,000,000 Ksh + 2,400,000 Ksh = 4.4 Million Ksh

WHITE METAL WORKSHOP LAYOUT

INTENDED EXTERNAL CUSTOMERS Cement factories Sugar factories Quarries(pitman bearings) Private power generators Kenya pipeline company Costing for External firms remetalling R/Mill Neck Bearings Rematalling for Bamburi Cement Factory carried out by Marine Engineering Works. Cost KSH 1,624,000 Ready market we can source for.

RECOMMENDATION AND CONCLUSION Commercialization of the whitemetalling processes is a viable project that need to be implemented. The Workshop can be set up at the proposed central workshop at Tana Power Station to reduce transportation and other costs- will serve Eastern, Upper Tana and Nairobi area. The Olkaria set up with serve western and Olkaria areas.

Thank You