Y. Nosochkov and M. Woodley (SLAC)

Slides:



Advertisements
Similar presentations
EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
Advertisements

Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
DR km DTC Lattice 7 July 2011 D. Rubin. DTC01 layout 1.Circumference = m, 712m straights 2.~ 6 phase trombone cells 3.54 – 1.92m long wigglers.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
Overview of Extraction Line Designs and Issues
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
BDS Pulsed Magnets RDR Completeness BDS EDR Kickoff Meeting SLAC October 2007 Thomas Mattison University of British Columbia.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
PS2 WG Injection and extraction systems Basics and assumptions
Re-design of extraction line for single stage BC
Interaction Region and Detector
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Schedule for the FAIR Antiproton Target
Emittance Diagnostics
Test of Optical Stochastic Cooling in CESR
Options and Recommendations for TL and Dumps
AD & I : BDS Lattice Design Changes
Compact and Low Consumption Magnet Design The DESY Experience
ILC BDS Emittance Diagnostics: Design and Requirements
Junji Urakawa (KEK) for ATF International Collaboration
3rd ATF2 Project Meeting, December 18-20, 2006
FCC-hh injection group 7
Beam Injection and Extraction Scheme
The 2mrad horizontal crossing angle IR layout for the ILC
Magnetic gap calculation
01SEP17.
XFEL Beam Collimation and Switchyard Review Beam Switchyard
2017 CAS Erice case study: Design of a beam dumping system for FCC
Emittance Diagnostics
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Specifications for the XFEL Beam Switchyard Kickers
Proposal for quadrupole families
Electron Collider Ring Magnets Preliminary Summary
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Transfer Line for EIC.
Possibility of MEIC Arc Cell Using PEP-II Dipole
ILC Beam Switchyard: Issues and Plans
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Y. Nosochkov and M. Woodley (SLAC) ILC BSY (2006b) April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) total length ≈ 650 m April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) σx = 29 μm ηX = 20 mm ΔE = 2% Δx = 400 μm ≈ 14σx wire scanners April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) total length ≈ 470 m April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) to IRTs dump April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) MPS β-collimators skew correction 2D emittance measurement MPS E-collimator Ф = 4 mm Ф = 96,54,12 mm April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) Diagnostic Chicane total length = 114.6 m energy BPM MPS energy collimator 12.5 mm  vacuum chamber Ф=15 mm OD ΔE/E = ±10% trajectories window laserwire detector (ε) Brett Parker’s BMP dipoles (20) April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) vacuum chamber Ф=15 mm laserwire photons go through here Brett’s BMP magnet has a wide (±28 mm) clear horizontal aperture … put in a small (but reasonable) vacuum chamber for the beam and use the reamining clear aperture to pass laserwire photons April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) Tesla “Type B” quadrupoles kickers septa Ф = 8 cm sextupole April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) Tesla Kickers 40 mm TESLA “Type B” quadrupole Lcore = 1.5 m bore radius = 10 mm max pole-tip field = 7.9 kG April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) no vertical bending raster kickers dump April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)

Y. Nosochkov and M. Woodley (SLAC) Some Magnet Details chicane dipoles (20) Brett Parker’s “BMP” dipoles L = 2.8 m, horizontal full aperture ≈ 56 mm, vertical full aperture ≈ 34 mm θ ≈ 100 μrad: B = 0.06 T @ 1 TeV cm total chicane SR emittance growth < 0.25% @ 1 TeV cm (DIMAD) fast extraction kickers (25) in-vacuum stripline devices L = 2 m, horizontal full aperture = 40 mm, vertical aperture < 40 (> 20) mm θ ≈ 16 μrad: B = 0.0133 T @ 1 TeV cm 100 ns rise-time, ? kV/cm, 225 MW total pulser power, 5 thyratron pulsers, 1 cable per kicker (≈ 20 kV) for “tuneup” mode, assume large gap DC dipoles wrapped around (some of) the fast extraction kickers septa (5) current-sheet devices, 10 mm thick blade L = 2 m, horizontal full aperture = 30 mm θ ≈ 0.6 &1.2 mrad: B = 0.5 T (3), 1.0 T (2) @ 1 TeV cm rastering kickers (10 horizontal, 10 vertical) L = 0.8 m, full aperture = 80 mm θ ≈ 26 μrad: B = 0.054 T @ 1 TeV cm 3 cm sweep radius (1.4 μm × 1.4 μm beam size at dump window) … factor of ≈ 25 reduction in dE reference TESLA Report 2001-05 (Maslov) April 4, 2006 Y. Nosochkov and M. Woodley (SLAC)