DEPOTS AND ARSENALS: What do all the changes mean? Sheila Clarke McCready DEFCON National Conference February 11, 2012.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
INTERNAL CONTROLS.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
RECORD KEEPING Cooperative Development of Operational
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
1 AIAA Delta Forum AIAA Public Policy A CRISIS IN AERONAUTICS The NASA Landscape Aerospace Sciences Meeting January 8, 2001 Carol A. Cash, Chair Aeronautics.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
A Principal’s Guide to Title I, Part A and LAP Requirements
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
Presentation for ASMC PDI 2010 June 4, 2010 Thomas Hessel Office of the Under Secretary of Defense for Personnel and Readiness Requirements and Program.
Gaining Senior Leadership Support for Continuity of Operations
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
EMS Checklist (ISO model)
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
Traveling Smarter and Thinking Differently
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Effectively applying ISO9001:2000 clauses 6 and 7.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
AACC Compatible Land Use Planning Series Series Includes Presentations from: FAA Airports Division – March 10 AACC Meeting Planning Department, Municipality.
How to commence the IT Modernization Process?
Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
NIMS Resource Management IS-703.A – August 2010 Visual 2.1 Unit 2: Resource Management Overview.
Functional Areas & Positions
Bulk Petroleum Executive Agent Cynthia F. Smith PETRO May 30, 2012.
Colombia´s Offsets Program September 2007 Yaneth Giha Director of Planning & Budgeting.
Visual 3.1 Delegation of Authority & Management by Objectives Unit 3: Delegation of Authority & Management by Objectives.
Controlling as a Management Function
Chapter 12 Strategic Planning.
1 Accountability and Management of Military Equipment January 26, 2007 Webcast Interview With Mr. Richard K. Sylvester Deputy Director, Acquisition Resources.
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Depot Maintenance & Partnering Provisions of Title 10 December 3, 2004.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Legal Authorities for Partnerships and Shared Services Jennifer Curtin January 16, 2013.
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
Depot Maintenance Partnering for PBL Managers Hollis Hunter OSD Maintenance Policy (DSN 225-)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 FY13 Legislative Action - Commercial Space Launch Cooperation (CSLC)
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force INTELLECTUAL.
PBL Support Alternatives
Americans with Disabilities Act(1990) Courtney Cambria.
ZHRC/HTI Financial Management Training
Guiding principles for the Federal acquisition system
TopicHouseSenate AH-64 TransferDuring FY15 the SECDEF and SECARMY may not: Transfer AH-64s from the ARNG to the Active Army None of the funds authorized.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Working With Federal Laboratories Tim Wittig Principal Technology Management Group SAIC 202/
1 Amy Williams, Senior Procurement Analyst February 5, 2008 Defense Acquisition Regulations System
1 DoD-VA Partnership Status 22 February DoD/VA Partnership DoD/VA Mission, Vision, Authority DoD/VA Council Structure Joint Strategic Plan Current.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
JFS 3/31/08 COMMERCIAL ITEM PROCUREMENT NDIA Educational Seminar March 31, 2008.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
Department of Defense Budget APEX Strategic Priorities The Quadrennial Defense Review – the first conducted in an era of global terrorism – continues.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
Presented By WVDE Title I Staff June 10, Fiscal Issues Maintain an updated inventory list, including the following information: description of.
1 Amy Williams, Senior Procurement Analyst March 25, 2008 Defense Acquisition Regulations System
1 Amy Williams, Senior Procurement Analyst Friday, October 26, 2007 Defense Acquisition Regulations System
PPBS Planning Programming Budgeting Systems. PPBS The Department of Defense is the only Agency to use this type of budget.budget.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 BUDGET VOTE 19: DEPARTMENT OF DEFENCE 10 June 2009.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
DoD Template for Application of TLCSM and PBL
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
Past and prologue: DOD “Other Transactions” 1989 – 2017 Presentation to IDCC Presented by: Richard L. Dunn Consultant February 1, 2017.
DRAFT FOUO PRE-DECISIONAL
Army Financial Management HON Mary Sally Matiella
Independent Office Products and Furniture Dealers Association (IOPFDA)
Increased Competition = Lower Cost to Taxpayers
Implementing the MWBE Program for the Aviation Capital Grant Program
Presentation transcript:

DEPOTS AND ARSENALS: What do all the changes mean? Sheila Clarke McCready DEFCON National Conference February 11, 2012

Depots & Arsenals: AFGE Position Overview Congress and the Administration must preserve the organic industrial base – our nations government-owned and government-operated (GOGO) depots, arsenals and ammunition plants – as DOD shifts military strategy and draws down force structure. The Administrations stated commitment to preserving the defense industrial base must include organic facilities. Core workload must be GOGO; sufficiently robust to ensure efficiency; and include protections to guarantee that new systems are brought into the depots. Core should be extended to arsenals and teeth added to the Arsenal Act. The 50/50 public-private depot law, guaranteeing a 50% floor of depot workload to the public sector, must be preserved. 2

Fiscal Year 2012 National Defense Authorization Act (NDAA) : Changes and Controversy Amended Major Sections of Title 10 Related to Depots and Arsenals Resulted In Conference Confrontation Between House and Senate Generated Questions Regarding Public-Private Equilibrium Mobilized Private Sector Campaign to Undo Selected Provisions Intensified Scrutiny of Administration Implementation Guaranteed Congressional Modification in the FY 13 NDAA Created Opportunity and Challenge for Public Employees to Shape Title 10 Provisions 3

Fiscal Year 2012 National Defense Authorization Act: Depots Reaffirmed 50/50 Changed the Definition of Depot Maintenance and Repair Amended the Definition of Core Mandated Core Reports to Congress Altered Acquisition Policy 4

NDAA FY 12: Depots – 50/50 Remains unchanged. Was not addressed in either the House or Senate bill. Was referenced in other sections in terms of compliance. Expect a request for a waiver for nuclear refueling of aircraft carriers. Could see a request for a waiver from the Air Force. Impact on calculation from changed definition of depot maintenance still unknown. Concerned about the impact of opening the statute to waivers and the future ease of use of the waiver provision by DOD. Suggested change by industry not expected to be considered by Congress. 5

NDAA FY 12: Depots – Repair and Maintenance Definition 10 USC 2460 BEFORE § Definition of depot-level maintenance and repair (a) In General. In this chapter, the term depot-level maintenance and repair means (except as provided in subsection (b)) material maintenance or repair requiring the overhaul, upgrading, or rebuilding of parts, assemblies, or subassemblies, and the testing and reclamation of equipment as necessary, regardless of the source of funds for the maintenance or repair or the location at which the maintenance or repair is performed. The term includes (1) all aspects of software maintenance classified by the Department of Defense as of July 1, 1995, as depot-level maintenance and repair, and (2) interim contractor support or contractor logistics support (or any similar contractor support), to the extent that such support is for the performance of services described in the preceding sentence. (b) Exceptions. (1)The term does not include the procurement of major modifications or upgrades of weapon systems that are designed to improve program performance or the nuclear refueling of an aircraft carrier. A major upgrade program covered by this exception could continue to be performed by private or public sector activities. (2)The term also does not include the procurement of parts for safety modifications. However, the term does include the installation of parts for that purpose. 6

NDAA FY 12: Depots – Repair and Maintenance Definition 10 USC 2460 After 7

NDAA FY 12: Depots – Repair and Maintenance Definition Pros Includes ICS and CLS Clarifies as a function, regardless of location Limits definition of software Includes modifications without exception, clarifying as labor Expands definition Cons Removes exception for nuclear refueling of carriers, opening 50/50 Concerned about how they will define availability at lower echelons Doesnt include any similar contractor support to capture PBL, etc. 8

NDAA FY 12: Depots – Core 10 USC 2464 Old § CORE LOGISTICS CAPABILITIES (a) Necessity for Core Logistics Capabilities. (1)It is essential for the national defense that the Department of Defense maintain a core logistics capability that is Government-owned and Government-operated (including Government personnel and Government-owned and Government-operated equipment and facilities) to ensure a ready and controlled source of technical competence and resources necessary to ensure effective and timely response to a mobilization, national defense contingency situations, and other emergency requirements. (2)The Secretary of Defense shall identify the core logistics capabilities described in paragraph (1) and the workload required to maintain those capabilities. (3)The core logistics capabilities identified under paragraphs (1) and (2) shall include those capabilities that are necessary to maintain and repair the weapon systems and other military equipment (including mission-essential weapon systems or materiel not later than four years after achieving initial operational capability, but excluding systems and equipment under special access programs, nuclear aircraft carriers, and commercial items described in paragraph (5)) that are identified by the Secretary, in consultation with the Chairman of the Joint Chiefs of Staff, as necessary to enable the armed forces to fulfill the strategic and contingency plans prepared by the Chairman of the Joint Chiefs of Staff under section 153(a) of this title. 153(a) (4)The Secretary of Defense shall require the performance of core logistics workloads necessary to maintain the core logistics capabilities identified under paragraphs (1), (2), and (3) at Government-owned, Government-operated facilities of the Department of Defense (including Government-owned, Government-operated facilities of a military department) and shall assign such facilities sufficient workload to ensure cost efficiency and technical competence in peacetime while preserving the surge capacity and reconstitution capabilities necessary to support fully the strategic and contingency plans referred to in paragraph (3). (5)The commercial items covered by paragraph (3) are commercial items that have been sold or leased in substantial quantities to the general public and are purchased without modification in the same form that they are sold in the commercial marketplace, or with minor modifications to meet Federal Government requirements. (b) Limitation on Contracting. (1)Except as provided in paragraph (2), performance of workload needed to maintain a logistics capability identified by the Secretary under subsection (a)(2) may not be contracted for performance by non- Government personnel under the procedures and requirements of Office of Management and Budget Circular A–76 or any successor administrative regulation or policy (hereinafter in this section referred to as OMB Circular A–76). (2)The Secretary of Defense may waive paragraph (1) in the case of any such logistics capability and provide that performance of the workload needed to maintain that capability shall be considered for conversion to contractor performance in accordance with OMB Circular A–76. Any such waiver shall be made under regulations prescribed by the Secretary and shall be based on a determination by the Secretary that Government performance of the workload is no longer required for national defense. 9

NDAA FY 12: Depots – Core 10 USC 2464 NEW 10

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 11

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 12

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 13

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 14

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 15

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 16

NDAA FY 12: Depots – Core 10 USC 2464 NEW Continued 17

NDAA FY 12: Depots – Core PROS Establishes clear reporting that will assist in tracking DOD actions, including GAO review Clearly states that core must be GOGO Linked to National Military Strategy Expands Core throughout the Lifecycle of a weapons system Core is required to be established, including facilities, equipment, technical data, & trained personnel within 4 years of initial operating capacity Requires the Secretary to assign sufficient workload to ensure cost efficiency and technical competence Expands universe to include Special Access Programs Retains A-76 Prohibition 18

NDAA FY 12: Depots – Core CONS Can be waived – authority too broad Not an enduring element of the national defense strategy Financial infeasibility for nuclear aircraft refueling Best interest of national security Best interest of US for special access program Waiver notification to Congress is after the fact Carries commercial item definition too far Limits core to depot maintenance rather than the broader category of logistics 19

Depot Maintenance – Acquisition Policy FY 12 NDAA Section 801 amends Title 10 to incorporate certification requirements for core depot requirements into the Acquisition Milestone Process at Milestones A and B to better ensure the establishment of organic core depot maintenance capability. Targeted to require depot maintenance decisions earlier in the acquisition process and avoid problems down the line. Should make sure that technical data and other factors are procured that allow organic maintenance of key, mission- essential weapons systems. 20

Fiscal Year 2012 National Defense Authorization Act: Arsenals & Depots Permanent and Expanded Authority for Army Industrial Facilities to Enter Into Cooperative Agreements With Non-Army Entities Strongly supported by Rock Island Arsenal, working closely with Iowa and Illinois bipartisan, bicameral delegations. House bill removed restrictions on the ability of Army industrial facilities to enter into cooperative agreements with non-Army entities, usually the private sector. The Senate bill was more restrictive. The Senate receded to the House. This provision was designed to provide the ability of industrial facilities in the Army to partner to bring workload to their facilities and to mitigate against downsizing from the drawdown in Iraq and Afghanistan. 21

Fiscal Year 2012 National Defense Authorization Act: Arsenals & Depots Minimum Capital Investments The House modified the requirement for minimum capital investments for depots and arsenals by specifying the funds to be considered in calculating the investment and by adding Tooele Army Depot, UT. The Senate modified the requirements and also added a number of GOCO facilities to the list that must receive capital investment by the Army. AFGE opposed adding GOCO facilities to the capital investment funding allocation, which would dilute funding to GOGO facilities. The Conference Report supported AFGEs position and required DOD to submit a table showing funded workload performed by each facility for the preceding 3 fiscal years and actual investment funded. 22

Fiscal Year 2012 National Defense Authorization Act: Arsenals Designation of Military Arsenal Facilities as Centers of Industrial and Technical Excellence (CITE) The House bill contained a provision that allowed all military industrial facilities to be designated as CITES. The Senate contained a similar provision. AFGE supported the provision on behalf of GOGO facilities; however, requested a modification in the language to ensure that only fully organic facilities [GOGO and not and not Government- Owned, Contractor-Operated (GOCO)] could be designated as a CITE. The Conference Report clarifies that Army arsenals, all of which are organic GOGO facilities, are designated as a CITE. This should help establish greater workload for Army arsenals represented by AFGE. 23

Depots and Arsenals: Next Steps Preserve 50/50 unchanged or to tighten waiver authority to prevent arbitrary and capricious use if DOD takes unprecedented action in light of changes to the definition of depot maintenance. Save positive changes in the definition of depot maintenance and repeal those phrases that are less beneficial to depots. Tighten the definition of core, particularly the tie between GOGO and core, and the reduction in the broad waiver authority. Fight industry efforts to gut organic industrial facility and civilian employee protections Improve the Arsenal Act to: Include a core or financially efficient workload Expand the required customer base DOD-wide rather than just the Army Eliminate the arbitrary closure provision Individual facility specific provisions that benefit organic industrial facilities as a whole 24

Industrial Facilities: Summary Historical data reveals that organic depot level maintenance, as well as arsenal and ammunition plant manufacturing capability, provide the best value to the American taxpayer in terms of cost, quality and efficiency. To ensure the best value to the taxpayer and the warfighter and to preserve the national defense through military readiness, DOD must effectively utilize organic facilities at optimal capacity rates. It reduces costs and returns taxpayer dollars to the community as economic multipliers. DOD must sustain a highly mission-capable, mission-ready workforce. Personnel must be managed to funding levels and not to artificial civilian end-strength constraints. 25